East Riding of Yorkshire local plan
The East Riding Local Plan Update (Strategy Document Update and Allocations Document Update), adopted on 2 April 2025, covers 2020 to 2039 and plans for at least 20,900 net new homes (1,100 a year).
- Five year housing land supply5.5 yearsat 1 April 2026meets the five years a council must show
- Green BeltNonein the district
- Allocations on the map183every use, in the adopted local plan
- Sites assessed153in the land availability assessment
- Neighbourhood plans5made
- Plan adopted2025next plan: being prepared
Where the next plan stands
- Being prepared
- Draft plan published
- At examination
- Adopted
A new East Riding Local Plan for 2029 to 2045 is being prepared under the new plan-making system. The council published its notice on 29 June 2026, consulted on scoping from 20 July to 31 August 2026 and published its Gateway 1 self-assessment on 30 October 2026. The next stage is the plan content and evidence consultation, timetabled for 7 June to 19 July 2027. Adoption is timetabled for 30 April 2029.
Largest allocations
Homes each site is planned to deliver, from the adopted plan.
How East Riding of Yorkshire compares
Against the other councils on Plota.
How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.
Five years, the minimum a council must show
The plan in brief
Checked against the council's documents on 15 November 2026
- Adopted plan
- The East Riding Local Plan Update (Strategy Document Update and Allocations Document Update), adopted on 2 April 2025, covers 2020 to 2039 and plans for at least 20,900 net new homes (1,100 a year).
- New plan
- A new East Riding Local Plan for 2029 to 2045 is being prepared under the new plan-making system. The council published its notice on 29 June 2026, consulted on scoping from 20 July to 31 August 2026 and published its Gateway 1 self-assessment on 30 October 2026. The next stage is the plan content and evidence consultation, timetabled for 7 June to 19 July 2027. Adoption is timetabled for 30 April 2029.
- Five year housing land supply
- 5.5 years at 1 April 2026 (Housing Land Supply Position Statement, October 2026).
- Green Belt
- None. The East Riding has no Green Belt policy area.
- Sites
- The Allocations Document allocates 183 sites, 141 of them for housing, for about 19,700 homes, with a further 14 committed housing sites (about 990 homes). No draft allocations have been published. The Housing Land Supply Position Statement 2026 lists 133 sites in the council's supply. Since June 2025 the council has received 991 land submissions for the new plan through its online submission map, and the call remains open.
- Neighbourhood plans
- 5 made. Bishop Burton passed its referendum on 24 September 2026 and awaits the council's decision; 8 more areas are designated. None of the made plans allocates housing sites.
- Recent changes
- 30 October 2026: Gateway 1 self-assessment published for the new Local Plan.
- October 2026: Housing Land Supply Position Statement 2026 published (5.5 years).
- 26 January 2026: the Ellerker Neighbourhood Plan made.
See the East Riding of Yorkshire local plan on the map
Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.
Open the map