Guildford local plan
The Local Plan: Strategy and Sites, adopted 25 April 2019, covers 2015 to 2034 and plans for 10,678 new homes (562 a year).
- Five year housing land supply3.0 years2.98 years at 1 April 2025short of the five years a council must show
- Green Belt83%of the borough
- Allocations on the map56every use, in the adopted local plan
- Sites assessed154in the land availability assessment
- Neighbourhood plans8made
- Plan adopted2019next plan: being prepared
Where the next plan stands
- Being prepared
- Draft plan published
- At examination
- Adopted
A new Guildford Local Plan is being prepared under the new plan-making system. The council gave notice on 5 June 2026, consulted on scoping from 2 September to 15 October 2026 and published its Gateway 1 self-assessment on 30 October 2026. The next stage is the plan content consultation, timetabled for 7 April to 19 May 2027. Adoption is timetabled for 30 April 2029.
Largest allocations
Homes each site is planned to deliver, from the adopted plan.
How Guildford compares
Against the other councils in Surrey.
How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.
Five years, the minimum a council must show
The plan in brief
Checked against the council's documents on 15 November 2026
- Adopted plan
- The Local Plan: Strategy and Sites, adopted 25 April 2019, covers 2015 to 2034 and plans for 10,678 new homes (562 a year). The Local Plan: Development Management Policies followed on 22 March 2023, and ten policies of the 2003 Local Plan still apply.
- New plan
- A new Guildford Local Plan is being prepared under the new plan-making system. The council gave notice on 5 June 2026, consulted on scoping from 2 September to 15 October 2026 and published its Gateway 1 self-assessment on 30 October 2026. The next stage is the plan content consultation, timetabled for 7 April to 19 May 2027. Adoption is timetabled for 30 April 2029.
- Five year housing land supply
- 2.98 years at 1 April 2025, measured against local housing need (published November 2025).
- Green Belt
- About 83% of the borough (about 22,620 hectares). The Green Belt Assessment 2026 (August 2026) covers 575 assessment areas and concludes that 551 are grey belt. No release is proposed yet.
- Sites
- The Strategy and Sites plan allocates 54 sites (A1 to A54), with about 12,500 homes on its housing and mixed-use sites. No draft allocations have been published. The Land Availability Assessment 2025 considered 154 sites beyond existing permissions: 42 were found realistic candidates for development and 112 were discounted. The council's call for sites runs all year and drew over 120 sites in the March to June 2025 round.
- Neighbourhood plans
- 8 made. Ash passed its referendum on 29 October 2026 and awaits the council's decision; 5 more areas are designated. Three made plans (East Horsley, Effingham and Puttenham) allocate housing sites, 9 sites in all.
- Recent changes
- 30 October 2026: Gateway 1 self-assessment and timetable version 2 published.
- 29 October 2026: Ash Neighbourhood Plan referendum passed (1,915 yes, 236 no).
- August 2026: Green Belt Assessment 2026 published.
See the Guildford local plan on the map
Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.
Open the map