Woking local plan

The Woking Core Strategy, adopted 25 October 2012, plan period 2010 to 2027, at least 4,964 new homes (about 292 a year).

  • Five year housing land supply7.1 yearsat 1 April 2023meets the five years a council must show
  • Green Belt62%of the borough
  • Allocations on the map60every use, in the adopted local plan
  • Sites assessed1,031in the land availability assessment
  • Neighbourhood plans4made
  • Plan adopted2012next plan: being prepared

Where the next plan stands

  1. Being prepared
  2. Draft plan published
  3. At examination
  4. Adopted

The Woking Local Plan 2044 is being prepared under the 2026 plan-making system. The notice of intention was published on 22 May 2026, the scoping consultation ran in July and August 2026, and the Gateway 1 self-assessment was completed on 25 September 2026. The council's timetable sets a consultation on the plan's proposed content and evidence from 6 January to 19 February 2027, a draft plan with site allocations from 14 January 2028, and adoption in April 2029. The plan sets a housing requirement of 12,656 homes for 2028 to 2044.

Largest allocations

Homes each site is planned to deliver, from the adopted plan.

  1. Sheerwater Priority Place570 homes
  2. land surrounding West Hall, West Byfleet555 homes
  3. Broadoaks, West Byfleet268 homes
  4. Oriental Road east car park, Woking250 homes
  5. Station Approach, West Byfleet208 homes

See every allocation on the map

How Woking compares

Against the other councils in Surrey.

Five year housing land supply

How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.

  1. Woking7.1 yearsApr 2023
  2. Mole Valley5.3 yearsMar 2026
  3. Spelthorne5.3 yearsApr 2025
  4. Reigate and Banstead4.1 yearsApr 2026
  5. Guildford3.0 yearsApr 2025
  6. Runnymede2.9 yearsApr 2025
  7. Tandridge2.2 yearsOct 2025
  8. Waverley1.3 yearsApr 2024
  9. Elmbridge1 yearMar 2025

Five years, the minimum a council must show

Share of the area in Green Belt
  1. Tandridge94%
  2. Guildford83%
  3. Mole Valley76%
  4. Runnymede74%
  5. Reigate and Banstead68%
  6. Spelthorne64%
  7. Woking62%
  8. Waverley60%
  9. Elmbridge58%

The plan in brief

Checked against the council's documents on 15 November 2026

Adopted plan
The Woking Core Strategy, adopted 25 October 2012, plan period 2010 to 2027, at least 4,964 new homes (about 292 a year). It works with the Development Management Policies DPD (adopted 20 October 2016) and the Site Allocations DPD (adopted 14 October 2021), which allocates the sites.
New plan
The Woking Local Plan 2044 is being prepared under the 2026 plan-making system. The notice of intention was published on 22 May 2026, the scoping consultation ran in July and August 2026, and the Gateway 1 self-assessment was completed on 25 September 2026. The council's timetable sets a consultation on the plan's proposed content and evidence from 6 January to 19 February 2027, a draft plan with site allocations from 14 January 2028, and adoption in April 2029. The plan sets a housing requirement of 12,656 homes for 2028 to 2044.
Five year housing land supply
7.1 years at 1 April 2023, published in the council's Housing Delivery Test Action Plan of June 2024.
Green Belt
About 62% of the borough (3,948 ha) is Metropolitan Green Belt. The latest review is the Green Belt Boundary Review of January 2014, which assessed 31 parcels. The Site Allocations DPD of 2021 took six sites (about 73 ha) out of the Green Belt for development and safeguarded three more (11.85 ha) for needs beyond 2027. No draft plan release has been proposed yet.
Sites
The Site Allocations DPD allocates 59 sites for about 3,515 homes and 21 Gypsy and Traveller pitches, alongside employment, transport and open space sites. No draft allocations yet. The Strategic Housing Land Availability Assessment 2017 assessed 192 sites and judged 41 deliverable and 52 developable. The council has held calls for sites in 2019 and 2022 but has not published the submissions. The 2025 brownfield land register lists 88 sites, 49 of them current.
Neighbourhood plans
Four made (Hook Heath 2015, Pyrford 2017, West Byfleet 2017, Byfleet 2026), a review of the Pyrford plan at Regulation 16 consultation until 23 December 2026, and two further areas designated (Brookwood and Bridley, Hoe Valley). None allocates housing sites.
Recent changes
  • 22 June 2026: Byfleet Village Neighbourhood Plan made.
  • 25 September 2026: new Local Plan Gateway 1 self-assessment completed.
  • 10 November 2026: Pyrford Neighbourhood Plan review opened for Regulation 16 consultation.

See the Woking local plan on the map

Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.