Elmbridge local plan
The Elmbridge Core Strategy (July 2011) and the Development Management Plan (adopted 15 April 2015).
- Five year housing land supply1 yearat 31 March 2025short of the five years a council must show
- Green Belt58%of the borough
- Allocations on the map2every use, in the adopted local plan
- Sites assessed217in the land availability assessment
- Plan adopted2015next plan: being prepared
Where the next plan stands
- Being prepared
- Draft plan published
- At examination
- Adopted
The Elmbridge Local Plan 2039 is at its first stage under the new plan-making system. The council gave notice of commencement on 16 October 2026 and its scoping consultation runs from 4 November to 9 December 2026. The next milestone is Gateway 1 on 16 February 2027, with adoption timetabled for 16 August 2029. An earlier plan (the Local Plan 2037) was withdrawn from examination on 26 February 2025. Elmbridge joins the new East Surrey Council in April 2027.
Largest allocations
Homes each site is planned to deliver, from the adopted plan.
How Elmbridge compares
Against the other councils in Surrey.
How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.
Five years, the minimum a council must show
The plan in brief
Checked against the council's documents on 15 November 2026
- Adopted plan
- The Elmbridge Core Strategy (July 2011) and the Development Management Plan (adopted 15 April 2015). The plan period is 2011 to 2026, with about 3,375 net new homes (225 a year).
- New plan
- The Elmbridge Local Plan 2039 is at its first stage under the new plan-making system. The council gave notice of commencement on 16 October 2026 and its scoping consultation runs from 4 November to 9 December 2026. The next milestone is Gateway 1 on 16 February 2027, with adoption timetabled for 16 August 2029. An earlier plan (the Local Plan 2037) was withdrawn from examination on 26 February 2025. Elmbridge joins the new East Surrey Council in April 2027.
- Five year housing land supply
- 1 year (1,911 homes against 1,901 a year needed) at 31 March 2025, published December 2025.
- Green Belt
- About 58% of the borough (about 5,610 hectares). The latest reviews are the Green Belt Boundary Review 2016 (80 local areas) and its 2018 supplementary work (92 sub-areas). New assessments for the next plan are under way. No release is proposed yet.
- Sites
- The adopted plan allocates no housing sites; two Surrey County minerals and waste allocations lie in the borough. No draft allocations have been published. The Land Availability Assessment 2023 covers 217 sites: of the 168 assessed, 46 were found deliverable within five years and 122 developable later; 49 were discounted. The council runs a rolling call for sites, open since October 2024.
- Neighbourhood plans
- None made or in preparation.
- Recent changes
- 4 November 2026: scoping consultation on the Local Plan 2039 opened (to 9 December 2026).
- 16 October 2026: notice of commencement of the new Local Plan.
- December 2025: five year supply statement (1 year).
See the Elmbridge local plan on the map
Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.
Open the map