Runnymede local plan
The Runnymede 2030 Local Plan, adopted 16 July 2020, plan period 2015 to 2030, a minimum of 7,507 homes (about 500 a year).
- Five year housing land supply2.9 years2.89 years at 1 April 2025short of the five years a council must show
- Green Belt74%of the borough
- Allocations on the map24every use, in the adopted local plan
- Sites assessed189in the land availability assessment
- Neighbourhood plans3made
- Plan adopted2020next plan: being prepared
Where the next plan stands
- Being prepared
- Draft plan published
- At examination
- Adopted
A new Local Plan is being prepared under the 2026 plan-making system. The scoping consultation and call for sites ran from 7 September to 12 October 2026, and the Gateway 1 self-assessment was timetabled for October 2026. The council's timetable sets a consultation on the vision and strategy from 1 June 2027, a draft plan consultation from April 2028, submission in September 2028 and adoption in April 2029.
Largest allocations
Homes each site is planned to deliver, from the adopted plan.
How Runnymede compares
Against the other councils in Surrey.
How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.
Five years, the minimum a council must show
The plan in brief
Checked against the council's documents on 15 November 2026
- Adopted plan
- The Runnymede 2030 Local Plan, adopted 16 July 2020, plan period 2015 to 2030, a minimum of 7,507 homes (about 500 a year).
- New plan
- A new Local Plan is being prepared under the 2026 plan-making system. The scoping consultation and call for sites ran from 7 September to 12 October 2026, and the Gateway 1 self-assessment was timetabled for October 2026. The council's timetable sets a consultation on the vision and strategy from 1 June 2027, a draft plan consultation from April 2028, submission in September 2028 and adoption in April 2029.
- Five year housing land supply
- 2.89 years at 1 April 2025 (statement published September 2025), against the standard method need of 640 homes a year.
- Green Belt
- About three quarters of the borough (74%) is Metropolitan Green Belt. The latest review is the Green Belt Review Part 2 of March 2017, which scored 94 sub-areas. A joint Green Belt and grey belt review with Spelthorne and Elmbridge is under way. No draft plan release has been proposed yet.
- Sites
- The 2030 Local Plan allocates 24 sites for at least 4,460 homes and 34 Gypsy and Traveller pitches, led by the Longcross Garden Village, and names 3 town centre opportunity areas. No draft allocations yet. The Strategic Land Availability Assessment 2025 (published May 2026) assessed 189 sites and judged 76 deliverable and 25 developable. 22 of the assessed sites came through a call for sites; the results of the 2026 call are not yet published. The brownfield land register lists 56 sites.
- Neighbourhood plans
- Three made (Thorpe 2021, Englefield Green 2024, Virginia Water 2026) and one area designated (Ottershaw). The Thorpe plan allocates 3 housing sites.
- Recent changes
- May 2026: Strategic Land Availability Assessment 2025 published.
- 3 June 2026: Virginia Water Neighbourhood Plan made.
- 7 September to 12 October 2026: new Local Plan scoping consultation and call for sites.
See the Runnymede local plan on the map
Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.
Open the map