Waverley local plan

Local Plan Part 1 (Strategic Policies and Sites), adopted 20 February 2018, covers 2013 to 2032 and plans for at least 11,210 net new homes (590 a year).

  • Five year housing land supply1.3 years1.28 years at 1 April 2024short of the five years a council must show
  • Green Belt60%of the borough
  • Allocations on the map29every use, in the adopted local plan
  • Sites assessed356in the land availability assessment
  • Neighbourhood plans10made
  • Plan adopted2018next plan: being prepared

Where the next plan stands

  1. Being prepared
  2. Draft plan published
  3. At examination
  4. Adopted

A new Waverley Local Plan is being prepared under the new plan-making system. The council published its notice and timetable on 11 June 2026, consulted on scoping from 15 June to 27 July 2026 and published its Gateway 1 self-assessment on 23 October 2026. Next, a summary of the scoping consultation is due on 30 November 2026, then the proposed plan contents and evidence consultation from 8 February to 22 March 2027. Adoption is timetabled for 31 January 2029.

Largest allocations

Homes each site is planned to deliver, from the adopted plan.

  1. the new settlement at Dunsfold Aerodrome2,600 homes
  2. Land South of Elmbridge Road and the High Street, Cranleigh765 homes
  3. Coxbridge Farm, Farnham350 homes
  4. Horsham Road, Cranleigh250 homes
  5. Land opposite Milford Golf Course180 homes

See every allocation on the map

How Waverley compares

Against the other councils in Surrey.

Five year housing land supply

How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.

  1. Woking7.1 yearsApr 2023
  2. Mole Valley5.3 yearsMar 2026
  3. Spelthorne5.3 yearsApr 2025
  4. Reigate and Banstead4.1 yearsApr 2026
  5. Guildford3.0 yearsApr 2025
  6. Runnymede2.9 yearsApr 2025
  7. Tandridge2.2 yearsOct 2025
  8. Waverley1.3 yearsApr 2024
  9. Elmbridge1 yearMar 2025

Five years, the minimum a council must show

Share of the area in Green Belt
  1. Tandridge94%
  2. Guildford83%
  3. Mole Valley76%
  4. Runnymede74%
  5. Reigate and Banstead68%
  6. Spelthorne64%
  7. Woking62%
  8. Waverley60%
  9. Elmbridge58%

The plan in brief

Checked against the council's documents on 15 November 2026

Adopted plan
Local Plan Part 1 (Strategic Policies and Sites), adopted 20 February 2018, covers 2013 to 2032 and plans for at least 11,210 net new homes (590 a year). Local Plan Part 2 (Site Allocations and Development Management Policies) followed on 21 March 2023.
New plan
A new Waverley Local Plan is being prepared under the new plan-making system. The council published its notice and timetable on 11 June 2026, consulted on scoping from 15 June to 27 July 2026 and published its Gateway 1 self-assessment on 23 October 2026. Next, a summary of the scoping consultation is due on 30 November 2026, then the proposed plan contents and evidence consultation from 8 February to 22 March 2027. Adoption is timetabled for 31 January 2029.
Five year housing land supply
1.28 years at 1 April 2024 (1,998 deliverable homes against 7,775 needed), published January 2025.
Green Belt
About 60% of the borough (about 20,840 hectares). The latest review is the 2014 Green Belt Review, which assessed 124 segments. No release is proposed yet.
Sites
The adopted plans allocate 29 sites: nine strategic sites in Part 1 (about 4,450 homes) and 20 sites in Part 2 (about 540 homes, plus Gypsy and Traveller sites). No draft allocations have been published. The Land Availability Assessment 2026 (published 12 August 2026) assessed 356 sites: 87 rated green, 187 amber and 82 red. A further call for sites ran from 26 August to 7 October 2026.
Neighbourhood plans
10 made. Dunsfold is in preparation, and Busbridge and Hascombe are on hold. Five made plans (Bramley, Chiddingfold, Cranleigh, Elstead and Weyburn, and Farnham) allocate housing sites.
Recent changes
  • 23 October 2026: Gateway 1 self-assessment published for the new Local Plan.
  • 26 August to 7 October 2026: call for sites.
  • 12 August 2026: Land Availability Assessment 2026 published.

See the Waverley local plan on the map

Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.

Open the map