Uttlesford local plan
The Uttlesford Local Plan 2021-2041, adopted 25 March 2026, plan period 2021 to 2041, 13,500 homes (675 a year).
- Five year housing land supply5.4 years5.35 years at 1 April 2026meets the five years a council must show
- Green Belt6%of the district
- Allocations on the map15every use, in the adopted local plan
- Sites assessed493in the land availability assessment
- Neighbourhood plans9made
- Plan adopted2026no new plan under way
Where the next plan stands
The district's plan was adopted in 2026. No new plan is under way.
None under way. The plan was adopted in March 2026 and the council has not published a timetable for a review. A separate Gypsy and Traveller plan, promised in the adopted plan, has not yet reached its first consultation.
Largest allocations
Homes each site is planned to deliver, from the adopted plan.
How Uttlesford compares
Against the other councils in Essex.
How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.
Five years, the minimum a council must show
The plan in brief
Checked against the council's documents on 15 November 2026
- Adopted plan
- The Uttlesford Local Plan 2021-2041, adopted 25 March 2026, plan period 2021 to 2041, 13,500 homes (675 a year). It replaces the Uttlesford Local Plan 2005.
- New plan
- None under way. The plan was adopted in March 2026 and the council has not published a timetable for a review. A separate Gypsy and Traveller plan, promised in the adopted plan, has not yet reached its first consultation.
- Five year housing land supply
- 5.35 years at 1 April 2026 (statement published 20 August 2026), including a 5% buffer. Housing Delivery Test 2025: 108%.
- Green Belt
- About 6% of the district (the Metropolitan Green Belt in the south-west, around Stansted Mountfitchet, Little Hallingbury, Hatfield Heath and the Rodings). The latest district review dates from 2016 (31 areas, all but one rated as making a strong contribution), restated in a 2024 update; a January 2026 study looked at 8 promoted sites near Hatfield Heath, Stansted Mountfitchet and Birchanger. The adopted plan releases no Green Belt land.
- Sites
- The adopted plan allocates 11 strategic sites: seven for about 3,738 homes and four for employment (57.5 hectares of employment land in all, with 2.5 hectares at South East Saffron Walden), plus 4 Gypsy and Traveller sites for 18 more pitches. A further 547 homes are to be allocated by neighbourhood plans in six villages, and 300 at Newport. No draft allocations. The Housing and Economic Land Availability Assessment (June 2024) assessed 452 sites: 2 deliverable within five years and 170 with potential within 5 to 15 years. The 2021 and 2022 calls for sites received 423 submissions.
- Neighbourhood plans
- Nine made (Ashdon, Felsted, Great and Little Chesterford, Great Dunmow, Little Hallingbury, Newport Quendon and Rickling, Saffron Walden, Stebbing, Thaxted) and sixteen more areas designated. Six of the made plans allocate housing sites (21 sites in all).
- Recent changes
- 25 March 2026: Uttlesford Local Plan 2021-2041 adopted.
- 20 August 2026: five year housing land supply statement published (5.35 years at 1 April 2026).
- 20 October 2026: Little Hallingbury Neighbourhood Plan made; the Newport, Quendon and Rickling plan review went to examination on 5 October 2026.
See the Uttlesford local plan on the map
Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.
Open the map