Vale of White Horse local plan

The Vale of White Horse Local Plan 2031, in two parts.

  • Five year housing land supply5.3 years5.26 years at 1 April 2026meets the five years a council must show
  • Green Belt14%of the district
  • Allocations on the map39every use, in the adopted local plan
  • Sites assessed711in the land availability assessment
  • Neighbourhood plans20made
  • Plan adopted2016next plan: at examination

Where the next plan stands

  1. Being prepared
  2. Draft plan published
  3. At examination
  4. Adopted

The South Oxfordshire and Vale of White Horse Joint Local Plan 2041 is at examination. It was submitted in December 2024; hearings were held in June 2025, July 2026 and September 2026, and the third stage of hearings begins on 17 November 2026. The councils expect the Inspectors' report in March 2027 and adoption in May 2027. During the examination the councils proposed moving the plan period to 2025-2043, with 12,684 homes for the Vale.

Largest allocations

Homes each site is planned to deliver, from the adopted plan.

  1. Dalton Barracks Garden Village, Shippon2,750 homes
  2. Valley Park, Didcot2,550 homes
  3. Grove Airfield2,500 homes
  4. Crab Hill, North East Wantage and South East Grove1,500 homes
  5. Monks Farm, North Grove885 homes

See every allocation on the map

How Vale of White Horse compares

Against the other councils in Oxfordshire.

Five year housing land supply

How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.

  1. Vale of White Horse5.3 yearsApr 2026
  2. South Oxfordshire4.0 yearsApr 2026
  3. Cherwell3.1 yearsMar 2025

Five years, the minimum a council must show

Share of the area in Green Belt
  1. South Oxfordshire21%
  2. Cherwell14%
  3. Vale of White Horse14%

The plan in brief

Checked against the council's documents on 15 November 2026

Adopted plan
The Vale of White Horse Local Plan 2031, in two parts. Part 1 (Strategic Sites and Policies) was adopted on 14 December 2016 and Part 2 (Detailed Policies and Additional Sites) on 9 October 2019. Plan period 2011 to 2031; housing requirement at least 22,760 homes (20,560 for the district's own need and 2,200 towards Oxford's unmet need).
New plan
The South Oxfordshire and Vale of White Horse Joint Local Plan 2041 is at examination. It was submitted in December 2024; hearings were held in June 2025, July 2026 and September 2026, and the third stage of hearings begins on 17 November 2026. The councils expect the Inspectors' report in March 2027 and adoption in May 2027. During the examination the councils proposed moving the plan period to 2025-2043, with 12,684 homes for the Vale.
Next plan
The councils gave notice on 19 June 2026 that they are preparing a Joint Local Plan 2045 under the new plan-making system. Scoping consultation ran from 8 to 29 September 2026 and the gateway 1 self-assessment was published on 30 October 2026. Next is the plan content and evidence consultation from 1 June to 13 July 2027; the timetable sets adoption on 30 April 2029.
Five year housing land supply
5.26 years at 1 April 2026 (statement published September 2026). Housing Delivery Test: 192%.
Green Belt
About 14% of the district (some 8,100 ha), the Oxford Green Belt in the north east of the district. The latest review is the Oxford Green Belt Study 2024 update, which assessed 34 parcels and 4 broad areas in the Vale. The Joint Local Plan 2041 proposes no Green Belt change in the district.
Sites
The Local Plan 2031 allocates 25 housing sites for about 14,900 homes, and employment land at 11 strategic sites. The Joint Local Plan 2041 carries 19 of the housing sites forward (about 11,800 homes) and adds six site policies, including about 2,750 homes at Dalton Barracks Garden Village, 800 North West of Valley Park and 600 North West of Grove, and 93 ha of employment land at Harwell Campus. The 2024 land availability assessment looked at 711 sites in the district and found 313 appropriate for further consideration. The 2020 call for sites and the 2021 call for land brought 410 sites.
Neighbourhood plans
20 made, 5 in preparation (Ardington and Lockinge, whose examination has concluded; Abingdon-on-Thames, Kingston Bagpuize with Southmoor, Shellingford and Sunningwell) and 7 more areas designated. Two made plans allocate sites: Drayton (3 housing sites, about 255 homes) and Faringdon (4 employment and mixed-use sites).
Recent changes
  • October 2026: the examination of the Ardington and Lockinge Neighbourhood Plan concluded; the council is considering the examiner's report.
  • June to October 2026: Joint Local Plan 2045 begun (notice 19 June, scoping consultation 8 to 29 September, gateway 1 self-assessment 30 October).
  • September 2026: five year supply statement published (5.26 years).

See the Vale of White Horse local plan on the map

Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.

Open the map