Welwyn Hatfield local plan
The Welwyn Hatfield Local Plan 2016-2036, adopted 12 October 2023 (plan period 2016 to 2036, 15,200 homes, 760 a year).
- Five year housing land supply1.8 yearsat 1 April 2025short of the five years a council must show
- Green Belt77%of the borough
- Allocations on the map49every use, in the adopted local plan
- Sites assessed107in the land availability assessment
- Neighbourhood plans2made
- Plan adopted2023next plan: draft plan published
Where the next plan stands
- Being prepared
- Draft plan published
- At examination
- Adopted
The Local Plan to 2043 is at the proposed submission stage. Its Regulation 19 consultation ran from 23 September to 5 November 2026. The council's timetable sets submission for examination in December 2026, hearings in spring to summer 2027 and adoption in the first quarter of 2028. The new plan sets a requirement of at least 14,785 homes from 2025 to 2043 (821 a year).
Largest allocations
Homes each site is planned to deliver, from the adopted plan.
How Welwyn Hatfield compares
Against the other councils in Hertfordshire.
How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.
Five years, the minimum a council must show
The plan in brief
Checked against the council's documents on 15 November 2026
- Adopted plan
- The Welwyn Hatfield Local Plan 2016-2036, adopted 12 October 2023 (plan period 2016 to 2036, 15,200 homes, 760 a year). It replaced the District Plan 2005.
- New plan
- The Local Plan to 2043 is at the proposed submission stage. Its Regulation 19 consultation ran from 23 September to 5 November 2026. The council's timetable sets submission for examination in December 2026, hearings in spring to summer 2027 and adoption in the first quarter of 2028. The new plan sets a requirement of at least 14,785 homes from 2025 to 2043 (821 a year).
- Five year housing land supply
- 1.8 years at 1 April 2025 (Annual Monitoring Report 2024/25, published April 2026).
- Green Belt
- About 77% of the borough is Metropolitan Green Belt. The latest review is the Green Belt Assessment of September 2026, covering 185 parcels. The draft plan proposes to release about 365 hectares from the Green Belt in 16 proposed releases, bringing the Green Belt to about 74% of the borough.
- Sites
- The adopted plan allocates 49 sites for about 8,400 homes, including 4 Gypsy and Traveller sites. The draft plan allocates 60 sites, for about 10,600 homes and for employment, education and Gypsy and Traveller uses. The latest land availability assessment (HELAA, September 2026) looked at 107 sites and 51 passed both stages of the assessment. Three calls for sites in 2025 and 2026 drew 105 submissions. The brownfield land register lists 42 current sites.
- Neighbourhood plans
- Two made (Northaw and Cuffley, June 2023; Welwyn Parish, 3 June 2026), none in preparation. Neither allocates housing sites.
- Recent changes
- 3 June 2026: Welwyn Parish Neighbourhood Plan made.
- September 2026: new land availability assessment and Green Belt Assessment published with the draft plan.
- 23 September to 5 November 2026: Local Plan to 2043 Regulation 19 consultation.