Dacorum local plan

The Dacorum Core Strategy, adopted 25 September 2013, with the Site Allocations Development Plan Document adopted 12 July 2017 and the saved policies of the Local Plan 1991-2011 (adopted 21 April 2004).

  • Five year housing land supply1.2 yearsat 1 April 2025short of the five years a council must show
  • Green Belt50%of the borough
  • Allocations on the map67every use, in the adopted local plan
  • Sites assessed307in the land availability assessment
  • Neighbourhood plans3made
  • Plan adopted2013next plan: at examination

Where the next plan stands

  1. Being prepared
  2. Draft plan published
  3. At examination
  4. Adopted

The Dacorum Local Plan to 2041 is at examination. It was submitted on 11 March 2025 and hearings ran from September 2025 to March 2026. On 14 July 2026 the Inspectors found the East of Tring allocation not justified as submitted; the council sent further evidence in September 2026 and awaits the Inspectors' response before any consultation on main modifications. The submitted plan provides for at least 15,332 homes from 2026 to 2041, 1,016 a year.

Largest allocations

Homes each site is planned to deliver, from the adopted plan.

  1. North Hemel Hempstead Growth Area (draft plan, about 1,500 homes)
  2. East of Tring (draft plan, about 1,400)
  3. West Hemel Hempstead (adopted, about 900)
  4. Land South of Berkhamsted (draft plan, about 775)
  5. Polehanger Lane, Hemel Hempstead (draft plan, about 750)

See every allocation on the map

How Dacorum compares

Against the other councils in Hertfordshire.

Five year housing land supply

How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.

  1. St Albans5 yearson adoption
  2. East Hertfordshire3.4 to 3.7 yearsFeb 2025
  3. Hertsmere2.6 yearsApr 2023
  4. North Hertfordshire2.4 yearsMar 2026
  5. Welwyn Hatfield1.8 yearsApr 2025
  6. Dacorum1.2 yearsApr 2025
  7. Three Rivers1.2 yearsApr 2025

Five years, the minimum a council must show

Share of the area in Green Belt
  1. Hertsmere79%
  2. Welwyn Hatfield77%
  3. St Albans76%
  4. Three Rivers76%
  5. Dacorum50%
  6. North Hertfordshire47%
  7. East Hertfordshire35%

The plan in brief

Checked against the council's documents on 15 November 2026

Adopted plan
The Dacorum Core Strategy, adopted 25 September 2013, with the Site Allocations Development Plan Document adopted 12 July 2017 and the saved policies of the Local Plan 1991-2011 (adopted 21 April 2004). Plan period 2006 to 2031; housing requirement 10,750 homes, an average of 430 a year.
New plan
The Dacorum Local Plan to 2041 is at examination. It was submitted on 11 March 2025 and hearings ran from September 2025 to March 2026. On 14 July 2026 the Inspectors found the East of Tring allocation not justified as submitted; the council sent further evidence in September 2026 and awaits the Inspectors' response before any consultation on main modifications. The submitted plan provides for at least 15,332 homes from 2026 to 2041, 1,016 a year.
Next plan
The council gave notice on 30 June 2026 that it is preparing the Dacorum Local Plan to 2045 under the new plan-making system. Its timetable (updated 30 October 2026) sets a plan content and evidence consultation from 8 July to 2 September 2027, submission on 22 October 2028 and adoption on 30 April 2029.
Five year housing land supply
1.2 years at 1 April 2025 (Housing Supply Position Statement 2024/25, published June 2026).
Green Belt
About half of the borough (some 10,600 ha). Green Belt reviews were carried out in 2013, 2016 and 2020. The draft plan would take about 526 ha out of the Green Belt, and 11 of its allocations sit on land to be released.
Sites
The adopted Site Allocations document holds 67 proposals, 37 of them for housing or mixed use, providing about 4,075 homes. The draft plan allocates 26 sites, 23 for housing, for about 9,900 homes. The 2024 land availability assessment looked at 307 sites and found 14 deliverable and 62 developable. The 2023 call for sites brought 21 sites; a new call for sites ran from 11 September to 23 October 2026.
Neighbourhood plans
3 made (Grovehill Future 2018, Kings Langley 2023, Bovingdon 2024) and 2 in preparation (Berkhamsted, which consulted on its draft from July to September 2026, and Great Gaddesden). One, Grovehill, supports housing on a named site (Henry Wells Square).
Recent changes
  • 14 July 2026: Inspectors' letter on the East of Tring allocation; council's further evidence followed in September 2026.
  • September to October 2026: scoping consultation (11 September to 2 October) and call for sites (11 September to 23 October) for the Local Plan to 2045.
  • 30 October 2026: Local Plan timetable revised after the first gateway self-assessment; adoption now planned for 30 April 2029.

See the Dacorum local plan on the map

Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.

Open the map