Hertsmere local plan
The Hertsmere Local Plan 2012 to 2027, in three documents: the Core Strategy (16 January 2013), the Elstree Way Corridor Area Action Plan (8 July 2015) and the Site Allocations and Development Management Policies Plan (23 November 2016).
- Five year housing land supply2.6 yearsat 1 April 2023short of the five years a council must show
- Green Belt79%of the borough
- Allocations on the map30every use, in the adopted local plan
- Sites assessed301in the land availability assessment
- Neighbourhood plans2made
- Plan adopted2013next plan: draft plan published
Where the next plan stands
- Being prepared
- Draft plan published
- At examination
- Adopted
The new Hertsmere Local Plan for 2026/27 to 2042/43 is at Regulation 19. The draft plan, published in October 2026, provides for at least 16,575 net new homes (975 a year), and its publication period closes at 11:59 pm on 19 November 2026. Full Council will then consider the responses before deciding to submit the plan; the council has not yet given a submission date. An earlier Regulation 18 consultation ran in April and May 2026.
How Hertsmere compares
Against the other councils in Hertfordshire.
How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.
Five years, the minimum a council must show
The plan in brief
Checked against the council's documents on 15 November 2026
- Adopted plan
- The Hertsmere Local Plan 2012 to 2027, in three documents: the Core Strategy (16 January 2013), the Elstree Way Corridor Area Action Plan (8 July 2015) and the Site Allocations and Development Management Policies Plan (23 November 2016). The Core Strategy plans for about 266 homes a year.
- New plan
- The new Hertsmere Local Plan for 2026/27 to 2042/43 is at Regulation 19. The draft plan, published in October 2026, provides for at least 16,575 net new homes (975 a year), and its publication period closes at 11:59 pm on 19 November 2026. Full Council will then consider the responses before deciding to submit the plan; the council has not yet given a submission date. An earlier Regulation 18 consultation ran in April and May 2026.
- Five year housing land supply
- 2.6 years at 1 April 2023 (Five Year Land Supply Update 2022/23, published October 2023).
- Green Belt
- About 79% of the borough (about 7,980 hectares). The Green Belt Assessment (Final Report Update, August 2026) covers 203 assessment areas: 56 grey belt, 117 provisionally grey belt and 30 not grey belt. A Stage 2 assessment (October 2026) looks at 51 candidate sites. In the draft plan, 28 of the 43 allocations, about 1,005 hectares, lie mainly on land now in the Green Belt.
- Sites
- The adopted Site Allocations plan allocates 11 housing sites for about 654 homes and three Gypsy and Traveller sites; the Elstree Way Corridor plan adds at least 1,000 homes. The draft plan allocates 43 sites for at least 14,390 homes in the plan period, including the Bowmans Cross new settlement. The Housing and Economic Land Availability Assessment 2026 assessed 293 sites, and the council counts 123 of them as suitable, available and achievable. The 2025 call for sites drew 195 submissions.
- Neighbourhood plans
- 2 made (Radlett and Shenley, both 8 May 2021). The Elstree and Borehamwood plan has been at examination since July 2026. The Radlett plan allocates one housing site.
- Recent changes
- October 2026: Regulation 19 draft Local Plan published for comment until 19 November 2026.
- October 2026: Stage 2 Green Belt Assessment published.
- August 2026: Green Belt Assessment Final Report Update published.
See the Hertsmere local plan on the map
Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.
Open the map