Tunbridge Wells local plan

The Tunbridge Wells Borough Local Plan 2020-2038, adopted 10 December 2025.

  • Five year housing land supply4.7 yearsat 1 April 2026short of the five years a council must show
  • Green Belt21%of the borough
  • Allocations on the map78every use, in the adopted local plan
  • Sites assessed526in the land availability assessment
  • Neighbourhood plans12made
  • Plan adopted2025next plan: being prepared

Where the next plan stands

  1. Being prepared
  2. Draft plan published
  3. At examination
  4. Adopted

The plan requires an early review. The Local Plan Review 2029 is being prepared under the new plan-making system: notice was given on 26 June 2026, the scoping consultation ran from 14 July to 11 August 2026, a call for sites ran from 11 May to 26 October 2026, and the gateway 1 self-assessment was published on 30 October 2026. Next is the plan content and evidence consultation from 2 March to 15 April 2027; the timetable sets submission on 9 October 2028 and adoption on 30 April 2029. A Royal Tunbridge Wells Town Centre Plan is also in preparation (first consultation February to April 2024).

Largest allocations

Homes each site is planned to deliver, from the adopted plan.

  1. Paddock Wood and east Capel strategy2,450 homes
  2. Land at Mascalls Farm, Paddock Wood413 homes
  3. Turnden Farm, Cranbrook204 homes
  4. Land at former Gas Works, Sandhurst Road200 homes
  5. Land at Brick Kiln Farm, Cranbrook180 homes

See every allocation on the map

How Tunbridge Wells compares

Against the other councils in Kent.

Five year housing land supply

How many years of new homes each council can show ready sites for, against its housing target. Short of five years, national policy leans towards granting permission for new homes, though Green Belt can still be a reason to refuse. Each figure is dated as the council published it.

  1. Tunbridge Wells4.7 yearsApr 2026
  2. Sevenoaks3.6 yearsApr 2026
  3. Tonbridge and Malling3.0 yearsMar 2026

Five years, the minimum a council must show

Share of the area in Green Belt
  1. Sevenoaks93%
  2. Tonbridge and Malling71%
  3. Tunbridge Wells21%

The plan in brief

Checked against the council's documents on 15 November 2026

Adopted plan
The Tunbridge Wells Borough Local Plan 2020-2038, adopted 10 December 2025. It provides for at least 12,204 homes (678 a year) and 14 ha of employment land, and replaced the 2006 Local Plan, the 2010 Core Strategy and the 2016 Site Allocations Local Plan.
New plan
The plan requires an early review. The Local Plan Review 2029 is being prepared under the new plan-making system: notice was given on 26 June 2026, the scoping consultation ran from 14 July to 11 August 2026, a call for sites ran from 11 May to 26 October 2026, and the gateway 1 self-assessment was published on 30 October 2026. Next is the plan content and evidence consultation from 2 March to 15 April 2027; the timetable sets submission on 9 October 2028 and adoption on 30 April 2029. A Royal Tunbridge Wells Town Centre Plan is also in preparation (first consultation February to April 2024).
Five year housing land supply
4.7 years at 1 April 2026 (Housing Land Supply Statement 2025/26, published September 2026).
Green Belt
About 21% of the borough (some 6,900 ha). The latest review is the Green Belt Study Stage Two (2017), which rated 55 parcels and broad areas by the harm of release.
National Landscape
The High Weald covers about 70% of the borough.
Sites
The Local Plan allocates 58 sites for about 3,160 homes, plus the strategy for Paddock Wood and east Capel (about 2,450 homes across four parcels, and at least 30 in Paddock Wood town centre) and 15 Gypsy and Traveller sites. The land availability assessment (2021, with addenda) looked at 526 sites and found 142 developable. The 2016 to 2020 calls for sites brought 480 sites and the 2026 call 248.
Neighbourhood plans
12 made (Hawkhurst 2018; Lamberhurst 2021; Benenden, Goudhurst and Brenchley and Matfield 2022; Horsmonden, Cranbrook and Sissinghurst, Paddock Wood and Pembury 2023; Capel 2024; Sandhurst and Southborough and High Brooms, July 2026). A replacement Hawkhurst plan consulted on its draft from April to June 2026. Benenden allocates four housing sites (about 95 homes).
Recent changes
  • 10 December 2025: Local Plan 2020-2038 adopted.
  • 15 July 2026: Sandhurst and Southborough and High Brooms Neighbourhood Plans made.
  • June to October 2026: Local Plan Review 2029 begun (scoping consultation, call for sites closed 26 October, gateway 1 self-assessment 30 October).

See the Tunbridge Wells local plan on the map

Every allocation, settlement boundary, Green Belt review parcel and policy area, on the land parcels it covers, with ownership, planning history and constraints alongside.

Open the map