Solar and renewables in North Somerset

North Somerset received 45 renewable energy applications in the last 12 months, including 2 solar farms, 6 battery storage sites and 9 heat pumps. All 33 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

11
|
3
|
1
Get alerts for North Somerset

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 11 of 11 applications
24 Sept 2026 Registered 26/P/1977/FUH

54 George Street Weston-super-Mare BS23 3AS

Demolition of existing rear extensions and erection of a new single-storey rear extension. Loft conversion with a rear dormer and front PV array. Erec...

Full permission - Householders North Somerset
21 Sept 2026 Registered 26/P/1935/FUH

152 Farleigh Road Backwell BS48 3PN

Proposed removal of existing conservatory and erection of a single-storey extension in place. Alterations to garden walls and installation of ground-m...

Full permission - Householders North Somerset
17 Sept 2026 Registered 26/P/1911/FUH

103 Long Ashton Road Long Ashton BS41 9JE

Proposed alteration of the existing walls and roof to create an additional storey; the construction of a ground and first floor side extension (adjace...

Full permission - Householders North Somerset
7 Sept 2026 Registered 26/P/1780/FUH

27 Hill Road Clevedon BS21 7NE

Proposed installation of 2no. Air Source Heat pumps in an enclosed court yard to the rear of the property.

Full permission - Householders North Somerset
27 Aug 2026 Registered 26/P/1771/FUL

Filers Green Station Road Blagdon BS40 7TB

Proposed replacement of the existing roof, including an increase in ridge height and roof pitch, together with the installation of 3no. rear dormer wi...

Full Application North Somerset
27 Aug 2026 Registered 26/P/1766/FUL

Secret Garden Nursery The Swallows Stock Lane Langford BS49 5JL

Proposed erection of a two storey side extension following the demolition of 2No. single storey lean-to structures with associated works to serve exis...

Full Application North Somerset
19 Aug 2026 Registered 26/P/1557/FUH

28 Homefield Close Winscombe BS25 1JE

Proposed hip-to-gable loft conversion including the creation of a flat-roof rear dormer, installation of front rooflights and PV panels.

Full permission - Householders North Somerset
17 Aug 2026 Registered 26/P/1687/FUH

26 Totterdown Road Weston-super-Mare BS23 4LN

Demolition of the existing single storey rear element and proposed erection of a replacement single storey rear extension and associated internal and ...

Full permission - Householders North Somerset
3 Aug 2026 Approved 18 Sep 26/P/1601/SJA

Hampton By Hilton, Bristol International Airport North Side Road Felton BS48 3AQ

Application to determine if prior approval is required for the proposed installation of 137no. solar PV panels on the existing flat roof

Prior App Part 14J non-domestic solar North Somerset
28 Jul 2026 Approved 18 Sep 26/P/1563/FUH

6 Herbert Road Clevedon BS21 7ND

Installation of roof mounted PV panels, air conditioning unit and associated inverter and battery storage. Creation of a cross pavement charging gully...

Full permission - Householders North Somerset
23 Jul 2026 Approved 9 Sep 26/P/1546/FUH

31 All Saints Road Weston-super-Mare BS23 2NW

Proposed siting of roof-mounted PV panels with associated battery and inverter.

Full permission - Householders North Somerset
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in North Somerset

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in North Somerset?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by North Somerset. You can also narrow the alert to a postcode, street, or drawn area.

We check North Somerset's planning portal daily. New solar & renewables applications appear here within a day of being published.