Solar and renewables in Sedgemoor

Sedgemoor received 28 renewable energy applications in the last 12 months, including 1 solar farm, 1 battery storage site and 7 heat pumps. Of the 19 decided so far, 18 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Sedgemoor

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 9 of 9 applications
29 Sept 2026 Approved 11 Nov 37/26/00038

CLIFF BARN, Clavelshay Road, North Petherton, Bridgwater, TA6 6PE

Erection of 70no. solar panels on the single plane low pitch rubber roof (East facing).

Full Planning Permission Sedgemoor
21 Sept 2026 Pending 50/26/00062

Land to the West of, Quab Lane, Wedmore, Somerset, BS28

The construction and operation of a micro battery storage project.

Full Planning Permission Sedgemoor
15 Sept 2026 Pending 24/26/00017

Old Mead, 24A THE CHANTRY, ROOKSBRIDGE, AXBRIDGE, BS26 2TR

Installation of air source heat pump to East (side) elevation.

Full Planning Permission Sedgemoor
11 Sept 2026 Approved 29 Oct 13/26/00020

Marsh Farm, Marsh Lane, Cannington, Bridgwater, Somerset, TA5 2HJ

Erection of a single detached self-build dwelling, car port, with photovoltaic panels and re-use of existing access

Full Planning Permission Sedgemoor
10 Sept 2026 Approved 3 Nov 26/26/00005

Hill House, Broadmead Lane, Edington, Bridgwater, Somerset, TA7 9JS

Replacement of Calor gas tank and boiler with air source heat pump

Listed Building Consent - alterations Sedgemoor
10 Sept 2026 Approved 3 Nov 26/26/00004

Hill House, Broadmead Lane, Edington, Bridgwater, Somerset, TA7 9JS

Replacement of Calor gas tank and boiler with air source heat pump

Full Planning Permission Sedgemoor
9 Sept 2026 Pending 45/26/00019

Land South of the A39, Cannington Road, Keenthorne, Bridgwater

Request for EIA Screening Opinion for the proposed ground-mounted solar photovoltaic (PV) Panels & associated infrastructure

Screening opinion Sedgemoor
27 Aug 2026 Pending 50/26/00067

Yew Tree House, High Street, Blackford, Wedmore, Somerset, BS28 4NN

Alterations and repairs to house including: repairs and adaptation to front porch, re-ordering of internal layouts on first floor, installation of con...

Listed Building Consent - alterations Sedgemoor
27 Aug 2026 Pending 50/26/00066

Yew Tree House, High Street, Blackford, Wedmore, Somerset, BS28 4NN

Alterations and repairs to house including: repairs and adaptation to front porch, re-ordering of internal layouts on first floor, installation of con...

Full Planning Permission Sedgemoor
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Sedgemoor

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Sedgemoor?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Sedgemoor. You can also narrow the alert to a postcode, street, or drawn area.

We check Sedgemoor's planning portal daily. New solar & renewables applications appear here within a day of being published.