Solar and renewables in Monmouthshire

Monmouthshire received 30 renewable energy applications in the last 12 months, including 4 battery storage sites and 5 heat pumps. Of the 23 decided so far, 21 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Monmouthshire

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 4 of 4 applications
17 Nov 2026 Pending Consideration DM/2026/01311

Glyn Farm Glyn Farm Road Newchurch Devauden Monmouthshire NP16 6PW

Installation of a ground-mounted solar photovoltaic array comprising 24 panels, with an approximate total generating capacity of 11.64 kWp, arranged i...

Planning Permission
9 Nov 2026 Pending Consideration DM/2026/01329

Ash Grove Earlswood Road Earlswood Shirenewton Monmouthshire NP16 6AS

The proposed works are limited to the installation of roof-mounted solar photovoltaic panels to serve the existing dwelling. The works will not alter ...

Certificate of Prop Lawful Use or Dev
13 Oct 2026 Pending Consideration DM/2026/01149

Property Known As Oxpool Barn Argoed Road Earlswood Shirenewton Monmouthshire

Retention of a 2.9 x 1.8m monopitch timber shed housing borehole and solar equipment

Householder
24 Sept 2026 Approved 26 Oct DM/2026/01107

Brook Villa Trellech Road Tintern Monmouthshire NP16 6SN

Installation of Rooftop Solar Panels on 1 storey attached outbuilding roof and 2 storey front roof of main dwelling, rear roof has been deemed unsuita...

Certificate of Prop Lawful Use or Dev
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Monmouthshire

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Monmouthshire?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Monmouthshire. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Monmouthshire's planning portal daily. New solar & renewables applications appear here within a day of being published.