Phase 3, Rivenwood Boulevard, Newtownards Data via plota.co.uk

LA06/2026/0647/DC - Discharge of Condition Consultation Open

Proposal

Discharge of Condition 7 of previously approved application which states:- A final Construction Environmental Management Plan (CEMP) shall be submitted to and agreed by the Council prior to any development activity including ground preparation or vegetation clearance. The final CEMP must identify the perceived risks to the aquatic environment, potential pollution pathways and mitigation measures to negate such risks. The final CEMP must, as a minimum, include the mitigation measures included within the outline CEMP as well as: a) Construction Method Statement(s) – including details of construction and excavation and timing of works; b) Pollution Prevention Plan – including details of a suitable buffer of 10m between the location of all construction works, refuelling, storage of excavated spoil/oil/fuel/substrate/construction materials/machinery, concrete mixing and washing areas and any watercourses or any surface drains present on or adjacent to the site. c) Site Drainage Plan; including details of Sustainable Drainage Systems (SuDS), foul waste disposal, surface water disposal/treatment and silt management measures; d) Spoil Management Plan; including location of spoil storage areas outwith the 10m buffer zone, management and handling of spoil and details of the reinstatement of excavated spoil; e) Environmental Emergency Plan; including details of emergency spill procedures and regular inspections of machinery onsite; f) Water Quality Monitoring Plan; g) Details of mitigation measures to protect badgers; h) Details of the appointment of an Ecological Clerk of Works and their roles and responsibilities. The final approved CEMP shall be fully implemented and adhered to during the construction phase to the reasonable satisfaction of the Council. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment and designated sites. Data via plota.co.uk

View original council record ↗

Application progress

Received
16 Jul 2026
Consultation
30 Jul 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet. The consultation period closed on 20 Aug 2026.

Important details

Application type
Discharge of Condition
Postcode
BT23 8ZE
Received
16 Jul 2026
Validated
16 Jul 2026
Ward
Loughries
Agent
TSA Planning

Consultation & key dates

Consultation
30 Jul 2026
Comments by
20 Aug 2026