Solar & Renewable Energy planning applications in Scotland

Tracks every recent renewables application: rooftop solar PV and photovoltaic arrays, ground-mounted solar farms, air-source and ground-source heat pumps, battery storage (BESS), wind turbines, biomass and anaerobic digestion.

Date received

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 50 of 394 applications
19 Nov 2026 Registered P/26/1451

East Coldstream Coldstream Road Carluke ML8 4QX

Formation of door openings and installation of windows, roof lights, flue pipe, chimney and air source heat pump unit to dwellinghouse (Certificate of...

Cert of lawfulness (Proposed) South Lanarkshire
19 Nov 2026 Awaiting decision APP/2026/1828

Strichen Library 59A Water Street Strichen Aberdeenshire AB43 6ST

Extension to Library and Installation of Solar PV Panels

Full Planning Permission
19 Nov 2026 Awaiting decision APP/2026/1847

Strichen Library 59A Water Street Strichen AB43 6ST

Extension to Library, Installation of Solar PV Panels and Internal Alterations

Listed Building Consent Aberdeenshire
18 Nov 2026 Registered 26/01740/PAN

Land North Of Windshiel Farm Windshiel Duns Scottish Borders

Wind farm developmentand associated infrastructure including electrical transformers, hardstandings, access roads, cabling, borrow pits and a distribu...

Pre Application Notification
18 Nov 2026 Awaiting decision APP/2026/1890

Everllence UK Limited Unit A1 Kintore Business Park Kintore AB51 0YQ

Installation of Battery Storage Container

Full Planning Permission Aberdeenshire
18 Nov 2026 Awaiting decision 26/01585/FLL

The Whins Comrie Crieff PH6 2LX

Installation of solar array, inverter, batteries and EV charger and associated works

planning permission local Perth
18 Nov 2026 Registered 26/01741/SCO

Repowered Dun Law Phase 1 Wind Farm Oxton Scottish Borders

Wind Farm comprising up to 10 turbines with a maximum blade tip height of 220m with a combined capacity exceeding 50MW, including battery energy stora...

Scoping Opinion
18 Nov 2026 Awaiting decision 26/01631/FLL

Old Bank Court Lower Granco Street Dunning Perth PH2 0SQ

Installation of solar panels

planning permission local
17 Nov 2026 Decided 26/349/SCR

Coplands Road Stromness Orkney Islands

Screening Opinion to Erect 16 houses with solar panels, including associated roads, services, landscaping and infrastructure

Screening
17 Nov 2026 Registered 26/02886/FULL

St Monans Parish Church West End St Monans Anstruther Fife KY10 2BX

Change of use from church (Class 10) to events venue (Class 11) and associated cafe (Class 3), and external alterations including installation of door...

Full Planning Permission
17 Nov 2026 Awaiting decision 26/02019/PP

The Blue House Dervaig Isle Of Mull Argyll And Bute PA75 6QJ

Installation of roof mounted solar panels with associated battery, air source heat pump and extract vents

Planning Permission
17 Nov 2026 Registered 26/00410/FULL

4 Duntrune Terrace Broughty Ferry Dundee DD5 1LF

Formation of driveway, access ramp, and installation of solar panels.

Full Application Local
17 Nov 2026 Registered 26/00417/LBC

4 Duntrune Terrace Broughty Ferry Dundee DD5 1LF

Formation of paving, access ramp and solar panel installation

Listed Building Consent
17 Nov 2026 Registered 26/00675/FULL

4 Seafield Road Broughty Ferry Dundee DD5 3AJ

Installation of roof-mounted solar photovoltaic panels

Full Application Local
17 Nov 2026 Registered 26/00604/CLPUD

Morrisons 1 Afton Way Dundee DD4 8BR

Install of a 522kw roof mounted solar PV system

Cert of Law Proposed Use or Development
17 Nov 2026 Pending 26/01156/P

Land East Of Little Ruchlaw Stenton East Lothian

Change of use of scrub land for the installation of ground mounted solar panels and associated works

Planning Permission
16 Nov 2026 Registered 26/01667/FUL

Hawthorn Cottage Hoprig Road Cockburnspath Scottish Borders TD13 5YF

Installation of 18no solar photo voltiac array to roof and 15KWh storage battery and inverter

Full Application
16 Nov 2026 Awaiting Assessment 26/04293/LBC

7 Kilgraston Road Edinburgh EH9 2DR

Remove gas cooker and install new internal unit linked to an external air to air heat pump located on a flat roof.

Listed Building Consent
16 Nov 2026 Pending consideration 26/00760/APP

28 Louisa Drive Girvan South Ayrshire KA26 9AH

Alterations to dwellinghouse with installation of solar panels

Planning Permission
16 Nov 2026 Awaiting Assessment 26/04458/FUL

7 Kilgraston Road Grange Edinburgh EH9 2DR

Installation of ASHP to flat roof of side utility room.

Planning Permission
13 Nov 2026 Pending Consideration 2026/230/PPF

Evrigarth Gardentown Symbister Whalsay Shetland ZE2 9AA

Partial demolition of existing cottage; renew external finishes; erect storey & 3/4 extension with flat roofed link to south gable of existing cottage...

Planning Permission Full Shetlands
13 Nov 2026 Pending ECU00006087

Novar 1 Wind Farm Repowering

Decommissioning the existing Novar 1 Wind Farm and construction and operation of the repowered Novar 1 Wind Farm at land located within the Novar Esta...

Development Energy Consents Unit
13 Nov 2026 Current 2026/0278/DET

Gartochraggan Gartocharn West Dunbartonshire G83 8NQ

Installation of Solar Panels

Detailed Planning Permission Loch Lomond
13 Nov 2026 Pending 2026/231/PPF

Kiandra Symbister Whalsay Shetland ZE2 9AG

Erect 1.5 storey dwellinghouse with ASHP, upgrade existing access and parking, associated landscaping and drainage and 1M post and wire boundary fence...

Planning Permission Full Shetlands
13 Nov 2026 Assessment Stage 26/2072/FUL

Woodwork Shop Clarencefield DG1 4NF

Erection of extension to south west elevation of dwellinghouse and installation of an air source heat pump

Full Application Dumfries
13 Nov 2026 Awaiting Assessment 26/04517/FUL

Proposed Battery Energy Storage System Burdiehouse Square Burdiehouse Edinburgh

Proposed renewable energy development comprising the installation of 49.9MW BESS (Battery Energy Storage System), access, landscaping and associated w...

Planning Permission
12 Nov 2026 Pending Consideration 26/00734/PP

Site To North Of Clydeport Terminal Building Hunterston Fairlie North Ayrshire

Construction and operation of an EV charging hub including vehicle charging bays and canopy, HGV charging bays, car parking, an amenity building compr...

Planning Permission (Full)
12 Nov 2026 Pending Consideration 26/01396/CLP

4 Earn Avenue Righead Industrial Estate Bellshill North Lanarkshire ML4 3LW

Installation of Solar Panels to roof and external alterations to form new windows

Certificate of Lawfulness
12 Nov 2026 Registered 26/02581/FULL

Victory Hall Collessie Cupar Fife KY15 7RQ

Installation of solar panels and replacement windows

Full Planning Permission
11 Nov 2026 Registered P/26/1425

Land 625M East Of Meikle Dripps Farm Waterfoot Road Thorntonhall

Section 36 EIA Screening Request for the construction of a 150MW LDES facility and associated infrastructure.

Electricity notification S36 application South Lanarkshire
11 Nov 2026 Awaiting decision 0921/FUL/26

Old Levenseat Fauldhouse West Lothian EH47 9AD

Installation of 166 ground mounted solar PV panels with cable connection

Planning Application
11 Nov 2026 Assessment Stage 26/2045/FUL

Dairy Cottage Lennox Plunton Borgue DG6 4UG

Partial change of use of attached agricultural building to form extension to existing dwellinghouse, erection of extensions to south and west elevatio...

Full Application Dumfries
11 Nov 2026 Awaiting decision ENQ/2026/2011

Land At Skelmonae Farm Methlick Aberdeenshire

Installation of Solar Arrays

EIA Screening Request
11 Nov 2026 Awaiting decision ENQ/2026/2027

Land At Skelmonae Farm Methlick Aberdeenshire

Installation of Solar Arrays

EIA Scoping Request
11 Nov 2026 Awaiting decision 26/01939/PP

Land South West Of Plantation Cottage Moy Campbeltown Argyll And Bute

Erection of dwellinghouse, detached garage and solar array, installation of septic tank and formation of vehicular access

Planning Permission
11 Nov 2026 Awaiting decision 26/00614/FULM

Field Immediately West Of North Mains Of Cononsyth Farm Cononsyth Arbroath

Erection of a single 76.5m wind turbine with associated crane hardstanding, access track extension, and grid connection infrastructure (replacement an...

Full Major Application Angus
10 Nov 2026 Awaiting decision APP/2026/1679

15 Frithside Street Fraserburgh Aberdeenshire AB43 9AR

Alterations and Change of Use from Offices (Class 2) to 4 Flats (Class 9) and Installation of Solar Panels

Full Planning Permission
10 Nov 2026 Awaiting decision APP/2026/1842

Whitelink Seafoods Ltd Maxwell Place Fraserburgh AB43 9SX

Installation of Ground Mounted Solar Panels

Full Planning Permission Aberdeenshire
10 Nov 2026 Assessment Stage 26/2035/FUL

Arieland Farm Gelston Castle Douglas DG7 1SS

Alterations and change of use of agricultural building to form a dwellinghouse with roof mounted solar panels and residential annexe at ground floor l...

Full Application Dumfries
10 Nov 2026 Awaiting decision TP/ED/26/0627

Land Adjacent To Crosshill Road Bishopbriggs East Dunbartonshire

Erection of a Data Centre Campus with a 300MW demand utility capacity with ancillary Battery Energy Storage (to be consented via separate S36 consent)...

Proposal of Application Notice
9 Nov 2026 Awaiting decision 0875/FUL/26

Pateshill Water Treatment Works South Of A704 West Lothian EH55 8NP

Installation of solar PV ground mounted panels and associated works

Planning Application
9 Nov 2026 Pending 26/01194/P

Aldi Foodstore Ltd Muirpark Tranent EH33 1DZ

Installation of air source heat pumps, plant equipment and associated works

Planning Permission East Lothian
9 Nov 2026 Awaiting Assessment 26/04454/FUL

4 Wilton Road Mayfield Edinburgh EH16 5NY

The refurbishment of timber sash and case windows with slimline double glazing some sashes may need replaced. Proposed enlarged opening for bi-folding...

Planning Permission
9 Nov 2026 Awaiting decision 26/0898/PP

The Old School House Newton Of Belltrees Lochwinnoch PA12 4JL

Installation of 15 no. solar panels across flat and pitched roof of building and siting of battery storage to the rear of building

Planning Permission Renfrewshire
9 Nov 2026 Awaiting decision 26/0899/LB

The Old School House Newton Of Belltrees Lochwinnoch PA12 4JL

External alterations to a listed building including the installation of 15 no. solar panels across flat and pitched roof of building and siting of bat...

Listed Building Consent Renfrewshire
6 Nov 2026 Pending Consideration 2026/224/PPF

Plot Exnaboe Virkie Shetland

Erection of single storey dwellinghouse with ASHP, formation of vehicular access, erection of 1m post and wire boundary fence and associated landscapi...

Planning Permission Full Shetlands
6 Nov 2026 Pending Consideration 26/00733/PP

Site To North Of North Kilruskin And East Of Railway Line Hunterston West Kilbride North Ayrshire

Construction and operation of a solar PV array and its associated infrastructure

Planning Permission (Full)
6 Nov 2026 Pending consideration 26/00739/EIASCR

Land East Of A713 A713 From A77t Bankfield Roundabout South East Past Ailsa Hospital To Council Boundary Ayr…

Environmental Impact Assessment (EIA) Screening Request to the Energy Consents Unit (ECU) under the Electricity Works (Environmental Impact Assessment...

EIA Screening Request
5 Nov 2026 Awaiting decision 26/02672/PN

12 The Cross West Wemyss Kirkcaldy Fife KY1 4SU

Prior Notification for installation of solar panels

Prior Notification/Approval
5 Nov 2026 Awaiting decision 26/01599/FLL

Glencona Taybridge Terrace Aberfeldy PH15 2BS

Erection of garden building and fence and installation of air source heat pump

planning permission local Perth
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Scotland

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for solar & renewables planning applications anywhere in Scotland?
Yes. Click the "Set up alerts" button on this page and you'll get a daily (or weekly) email listing every new solar & renewables application submitted anywhere in Scotland. No need to pick a postcode or draw a map - pick the category once, choose your frequency, and we'll do the rest.

Solar & Renewables planning applications elsewhere

Data updated daily across Scotland's active councils.