Planning applications in Aberdeenshire

15 last 90 days
|
3 last 30 days
|
0 last 14 days
Solar & renewables
Get alerts for Aberdeenshire

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Application type
Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 15 of 15 applications
APP/2026/1057 19 Jun 2026 Awaiting decision

Buailteach Mill Crathie AB35 5TE

Erection Of Dwellinghouse and Installation of Air Source Heat Pump

Full Planning Permission Aberdeenshire 19 Jun 2026
APP/2026/1036 16 Jun 2026 Awaiting decision

Land To East Of Woodend Croft Muir Of Fowlis Alford Aberdeenshire

Erection of Dwellinghouse and Installation of Air Source Heat Pump

Full Planning Permission Aberdeenshire 16 Jun 2026
ENQ/2026/1032 16 Jun 2026 Awaiting decision

Land At Clashmach Hill Southwest Of Huntly

Erection of up 13 Wind Turbines (200m to Blade Tip) Formation of Access Track and Associated Infrastructure

EIA Scoping Request Aberdeenshire 16 Jun 2026
APP/2026/0965 4 Jun 2026 Awaiting decision

Craigneil Windfarm Land To The North And North East Of Hillside Rickarton Stonehaven

Erection of 11 Wind Turbines, Formation of Access Tracks, Hardstandings, Substation, Control Building, Met Mast, Borrow Pit, Associated Infrastructure...

Application under Section 42 Aberdeenshire 4 Jun 2026
ENQ/2026/0931 3 Jun 2026 Awaiting decision

Land At Mains Of Cairnbrogie Oldmeldrum Ellon Aberdeenshire

Erection of Wind Turbine (Hub Height 81m, Tip Height 150m) and Associated Infrastructure

EIA Screening Request Aberdeenshire 3 Jun 2026
ENQ/2026/0875 27 May 2026 Awaiting decision

Aspen Offshore Wind Farm Land Between Mean Low Water Springs Near Craig Stirling, Newtonhill And Fetterresso Forest Aberdeenshire

Installation of Onshore Transmission Infrastructure Including Installation of Electrical Cables, Erection of Substation and Associated Enabling and An...

EIA Scoping Request Aberdeenshire 27 May 2026
ENQ/2026/0800 13 May 2026 Decided

Land At Brigstanes Farm Catterline Stonehaven Aberdeenshire AB39 2UA

Erection of 2 Wind Turbines (Height to Hub 45m, Height to Blade Tip 69m) Formation of Access Track and Associated Infrastructure

EIA Screening Request Aberdeenshire 13 May 2026
ENQ/2026/0802 13 May 2026 Decided

Land To The South Of Alehouse Hillock Cairnie Huntly AB54 4UB

Installation of Battery Energy Storage System (BESS) with and Installed Capacity of 150 Megawatt (MW), Substation and Associated Infrastructure

EIA Screening Request Aberdeenshire 13 May 2026
ENQ/2026/0782 8 May 2026 Decided

Land At Bruxiehill St Fergus Peterhead Aberdeenshire

Erection of 80 Metre High Wind Turbine Without Compliance With Condition 2 (Operational Life) of Planning Permission Reference APP/2007/2128

EIA Screening Request Aberdeenshire 8 May 2026
ENQ/2026/0781 8 May 2026 Decided

Ednie Farms St Fergus Peterhead

Erection of 2 X 800 KW Wind Turbines 79.6m High and Associated Infrastructure Without Compliance With Condition 20 (Operational Life) and 21 (End of L...

EIA Screening Request Aberdeenshire 8 May 2026
APP/2026/0773 7 May 2026 Awaiting decision

Coaching Stable Former Rob Roy Inn Roadside Of Kinneff Inverbervie DD10 0TG

Part Demolition and Conversion, Alterations of Coaching House to form Dwellinghouse and Installation of Air Source Heat Pump

Listed Building Consent Aberdeenshire 7 May 2026
ENQ/2026/0753 1 May 2026 Decided

Land To East Of Upper Culphin Cornhill Banff

Erection of Replacement Wind Turbine (Hub Height 45 metres) Total Height 68.5 metres and Associated Infrastructure

EIA Screening Request Aberdeenshire 1 May 2026
ENQ/2026/0745 1 May 2026 Decided

Land At Home Farm Dens Hillhead Of Cocklaw Blackhills Peterhead AB42 3LH

Installation of 1000 Megawatt (MW) Battery Energy Storage System and Associated Infrastructure

EIA Screening Request Aberdeenshire 1 May 2026
ENQ/2026/0739 30 Apr 2026 Decided

Aspen Offshore Wind Farm (Onshore Infrastructure) Land At Craig Stirling North, North East And North West Of Newtonhill Connecting To Fetteresso Forest Aberdeenshire

Onshore Transmission Infrastructure for Aspen Offshore Wind Farm Including Installation of Electrical Cables, Erection of Substation and Associated In...

Proposal of Application Notice Aberdeenshire 30 Apr 2026
APP/2026/0692 22 Apr 2026 Awaiting decision

Land To North Of Jockston House Ardoe Aberdeen Aberdeenshire AB12 5XT

Installation of Ground Mounted Solar PV Array

Full Planning Permission Aberdeenshire 22 Apr 2026
Recency
Last 2 weeks
2-4 weeks
1–2 months
Older

Get free email alerts for new planning applications in Aberdeenshire

Latest application from Aberdeenshire: 6 Jul 2026. We check the council's portal daily.