Solar and renewables in Aberdeenshire

Aberdeenshire received 98 renewable energy applications in the last 12 months, including 5 battery storage sites and 32 heat pumps. Of the 47 decided so far, 46 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Aberdeenshire

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 28 of 28 applications
23 Oct 2026 Awaiting decision ENQ/2026/1930

Land On Monymusk Estate Land To South Of Bridgefoot Farm Kemnay Aberdeenshire AB51 5LP

Construction and Operation of Anaerobic Digestion (Ad), Biomethane Production and Gas-Grid Injection Facility

EIA Screening Request Aberdeenshire
22 Oct 2026 Awaiting decision APP/2026/1718

Stockbriggs Lonmay Fraserburgh Aberdeenshire AB43 8UU

Installation of 182.7kw Solar Panels and Associated Infrastructure

Full Planning Permission Aberdeenshire
22 Oct 2026 Awaiting decision APP/2026/1478

Mill Of Crimonmogate Lonmay Fraserburgh Aberdeenshire AB43 8SE

Installation of 18 PV Solar Panels (Retrospective)

Full Planning Permission Aberdeenshire
21 Oct 2026 Awaiting decision APP/2026/1692

Land Adjacent To Clachanturn House Crathie Ballater Aberdeenshire AB35 5TA

Erection of Dwellinghouse and Installation of Air Source Heat Pump

Full Planning Permission Aberdeenshire
19 Oct 2026 Awaiting decision APP/2026/1734

Aldi Stores Ltd Loco Works Road Inverurie AB51 4FY

Installation of Air Source Heat Pumps, Plant Equipment and Associated Works

Full Planning Permission Aberdeenshire
14 Oct 2026 Awaiting decision APP/2026/1702

Castle Of Crommey Aberchirder Aberdeenshire AB54 7QU

Installation of Ground Mounted Solar Array and Associated Underground Cable

Full Planning Permission Aberdeenshire
13 Oct 2026 Awaiting decision APP/2026/1694

17 Abbey View Old Deer Aberdeenshire AB42 5LB

Installation of Solar Panels, Battery and Air Source Heat Pump

Full Planning Permission Aberdeenshire
12 Oct 2026 Awaiting decision ENQ/2026/1868

Mains Of Tarty Ellon Aberdeenshire AB41 8LR

Erection of Turbine (Hub Height 20m, Tip Height 27.9m) and Associated Infrastructure (Retrospective)

EIA Screening Request Aberdeenshire
9 Oct 2026 Awaiting decision ENQ/2026/1860

Land At Cairnadailly Farm Ellon

Erection of Wind Turbine (Hub Height 61.31m, 99.91m to Blade Tip) and Associated Infrastructure, Including Substation and Access Track

EIA Screening Request Aberdeenshire
9 Oct 2026 Awaiting decision APP/2026/1540

Mains Of Tarty Ellon AB41 8LR

Erection of Turbine (Hub Height 20m, Tip Height 27.9m) and Associated Infrastructure (Retrospective)

Full Planning Permission Aberdeenshire
8 Oct 2026 Awaiting decision APP/2026/1677

Land At Mahon Farm Turriff AB53 4HD

Replacement of 2 Existing Wind Turbines with 2 V29 Wind Turbines (Tip Height 44.5m) and Associated Ancillary Works

Full Planning Permission Aberdeenshire
7 Oct 2026 Awaiting decision APP/2026/1632

Land At Midmill Kintore Aberdeenshire AB51 0XB

Formation of Battery Energy Storage Compound (up to 49.9MW), Siting of Switch Room, HV Container, Site Office, Erection of Boundary Fencing, CCTV Mast...

Application under Section 42 Aberdeenshire
5 Oct 2026 Awaiting decision APP/2026/1638

Mains Of Buthlaw Farm Glendaveny Peterhead AB42 3EA

Installation of 2 Biomass Boilers and Extension of 2 Sheds

Full Planning Permission Aberdeenshire
11 Sept 2026 Awaiting decision APP/2026/1551

Land On Fasque And Glendye Estate Fasque Plateau Strachan Banchory Aberdeenshire

Erection of an Anemometer Mast up to 80 Metres in Height Without Compliance with Condition 1 (Time) of Planning Permission Reference APP/2024/0496

Application under Section 42 Aberdeenshire
9 Sept 2026 Approved 2 Oct APP/2026/1529

Ballater Community Enterprise Ltd Park House Ballater Caravan Park Anderson Road Ballater Aberdeenshire AB35 5QW

Installation of Solar PV and Solar Thermal Panels Including Associated Battery Storage and Inverter

Full Planning Permission Aberdeenshire
31 Aug 2026 Awaiting decision APP/2026/1446

Congregational Church Main Street Cruden Bay Aberdeenshire AB42 0NA

Partial Change Of Use from Class 10 (Non-residential Institutions) to Mixed Use (Class 1A Shops and Financial, Professional and Other Services and Cla...

Full Planning Permission Aberdeenshire
24 Aug 2026 Approved 21 Oct APP/2026/1368

Rothney House North Road Insch AB52 6XP

Installation of 2 Air Source Heat Pumps

Full Planning Permission Aberdeenshire
24 Aug 2026 Awaiting decision APP/2026/1227

Sunny Hill Farm Memsie Fraserburgh Aberdeenshire AB43 7AP

Siting of Residential Caravan, Solar Panels and Associated Infrastructure, Change of Use from Agricultural to Business and Erection of Animal Shelters...

Full Planning Permission Aberdeenshire
19 Aug 2026 Awaiting decision APP/2026/1328

Allt-na-Giubhsaich Lodge Glen Muick Ballater Aberdeenshire AB35 5SQ

Alterations and Extension to Dwellinghouse Including Installation of Air Source Heat Pumps and Drainage Infrastructure

Full Planning Permission Aberdeenshire
19 Aug 2026 Awaiting decision APP/2026/1293

Allt Na Giubhsaich Bothy Glen Muick Ballater Aberdeenshire

Alterations and Extension to Dwellinghouse, Conversion of Existing Outbuilding, Installation of Air Source Heat Pump and Drainage Infrastructure

Full Planning Permission Aberdeenshire
19 Aug 2026 Approved 23 Oct APP/2026/1325

Bankhead Renewable Energy Ltd Portlethen AB12 4RX

Erection of Wind Turbine (Hub Height 59m, Total Height 89.5m) Upgrading of Access Track and Associated Infrastructure Without Compliance with Conditio...

Application under Section 42 Aberdeenshire
18 Aug 2026 Approved 7 Oct APP/2026/1318

John Stuart Murrial Ltd Murrial Farm Insch Aberdeenshire AB52 6NU

Installation of Biomass Boiler and Associated Pipework

Full Planning Permission Aberdeenshire
18 Aug 2026 Approved 15 Sep APP/2026/1357

25 Blackhouse Circle Blackhouse Industrial Estate Peterhead AB42 1BN

Installation Of External Air Source Heat Pump Unit

Full Planning Permission Aberdeenshire
13 Aug 2026 Awaiting decision APP/2026/1292

Allt Na Giubhsaich Bothy Glen Muick Ballater Aberdeenshire

Internal and External Alterations and Extension to Dwellinghouse Including Conversion of Existing Outbuilding, Installation of Air Source Heat Pump, E...

Listed Building Consent Aberdeenshire
13 Aug 2026 Awaiting decision APP/2026/1294

Allt-na-Giubhsaich Lodge Glen Muick Ballater AB35 5SQ

Alterations and Extension to Dwellinghouse Including Internal Alterations, Partial Demolition of Servants Hall and Flat Roof Extension, Porch Reinstat...

Listed Building Consent Aberdeenshire
11 Aug 2026 Approved 22 Oct APP/2026/1263

Site At East Leylodge Farm Kintore Aberdeenshire AB51 0XY

Erection of Wind Turbine (Hub Height 55.6m Total Height 79.6m) and Associated Infrastructure

Full Planning Permission Aberdeenshire
11 Aug 2026 Decided 8 Sep ENQ/2026/1460

Site At East Leylodge Farm Kintore Aberdeenshire AB51 0XY

Erection of Wind Turbine (Hub Height 55.6m Total Height 79.6m) and Associated Infrastructure

EIA Screening Request Aberdeenshire
11 Aug 2026 Decided 10 Sep ENQ/2026/1456

Invercannie Water Treatment Works Inchmarlo Banchory

Solar PV Scheme Extension

EIA Screening Request Aberdeenshire
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Aberdeenshire

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Aberdeenshire?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Aberdeenshire. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Aberdeenshire's planning portal daily. New solar & renewables applications appear here within a day of being published.