Solar and renewables in Moray

Moray received 29 renewable energy applications in the last 12 months, including 4 battery storage sites and 4 heat pumps. All 18 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

9
|
4
|
3
Get alerts for Moray

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 9 of 9 applications
28 Sept 2026 Awaiting decision 26/01232/APP

Duffus Village Hall Elgin Road Duffus Elgin Moray IV30 5AL

Solar Panels added to existing village hall

Application for Planning Permission Moray
22 Sept 2026 Awaiting decision 26/01163/APP

Land To The West Of Crisp Maltings Limited Buckie Moray

Application to vary the approved layout of Planning Permissions 23/00892/APP, 23/00894/APP and 23/00895/APP including the construction of a concrete c...

Application for Planning Permission Moray
22 Sept 2026 Awaiting decision 26/01162/APP

Land To The West Of Crisp Maltings Limited Buckie Moray

Application to vary the approved layout of Planning Permissions 23/00892/APP, 23/00894/APP and 23/00895/APP including the construction of a concrete c...

Application for Planning Permission Moray
18 Sept 2026 Awaiting decision 26/01206/APP

Boortmalt The Maltings March Road Buckie Moray AB56 4BS

Remove disused diesel tanks replace with 3no shipping containers small tanks IBCs pipework and install air source heat pump at

Application for Planning Permission Moray
28 Aug 2026 Awaiting decision 26/01071/APP

Church Of Scotland Hall Church Street Findochty Buckie Moray AB56 4PW

Fit solar panels to roof including battery storage at

Application for Planning Permission Moray
21 Aug 2026 Awaiting decision 26/01061/APP

Arndilly House Craigellachie Aberlour Moray AB38 9QS

Erect 108 solar PV panels at

Application for Planning Permission Moray
18 Aug 2026 Decided 29 Sep 26/01050/MARLIC

Inner Moray Firth

Request for Environmental Impact Assessment Scoping Opinion for Moray FLOW-Park

Marine Scotland Licence Moray
21 Jul 2026 Awaiting decision 26/00756/APP

Depot Grant Park Victoria Road Forres Moray

Proposed installation of ground mounted solar panels at

Application for Planning Permission Moray
17 Jul 2026 Decided 7 Aug 26/00896/SCN

Scottish Water Treatment Plant Moycroft Road Elgin Moray IV30 1XZ

Intallation of 719 no. photovoltaic ground based panels and 3 no. solar inverters on land at

Screening Opinion Moray
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Moray

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Moray?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Moray. You can also narrow the alert to a postcode, street, or drawn area.

We check Moray's planning portal daily. New solar & renewables applications appear here within a day of being published.