Solar and renewables in Highland

Highland received 91 renewable energy applications in the last 12 months, including 17 battery storage sites and 14 heat pumps. Of the 47 decided so far, 44 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Highland

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 21 of 21 applications
7 Oct 2026 Under Consideration 26/04445/LBC

62 Church Street Cromarty IV11 8XA

Installation of a ground-mounted air source heat pump

Listed Building Consent Highland
5 Oct 2026 Under Consideration 26/04012/FUL

8 Hugh Street Balintore Tain IV20 1UJ

Erection of extension, formation of driveway, installation of solar PV, battery storage & ASHP

Full Application Highland
29 Sept 2026 Under Consideration 26/04348/S36

Land 750M East Of Broadlean Barrock

Charleston Energy Park - The Proposed Development will consist of five wind turbines (up to 180 m tip height), battery energy storage, access tracks, ...

Section 36 Highland
17 Sept 2026 Awaiting decision 26/03069/FUL

Land 100M North Of Kylas Resipole Strontian

Installation of ground mounted solar array (11Kw)

Full Application Highland
14 Sept 2026 Under Consideration 26/03655/LBC

The Cliff 3 George Street Cromarty IV11 8YJ

Installation of solar panels to rear roof

Listed Building Consent Highland
11 Sept 2026 Under Consideration 26/03831/FUL

Tigh A'Bhlair Culloden Moor Inverness IV2 5EH

Installation of Air Source Heat Pump with Solar PV and Battery

Full Application Highland
7 Sept 2026 Under Consideration 26/03724/FUL

Luibeg 1 Lynstock Park Nethy Bridge PH25 3EL

Installation of Air Source Heat Pump

Full Application Highland
3 Sept 2026 Decided 21 Oct 26/03985/SCRE

Land 4380M NE Of Burnside 12 Upper Feorlig Dunvegan Isle Of Skye

EIA Screening Opinion Request - Ben Sca Redesign and Balmeanach Wind Farm grid connections comprising two 33kV underground cables (UGC)

Screening Applications Highland
2 Sept 2026 Decided 22 Sep 26/03871/SCRE

Scottish Water Thurso Waste Water Treatment Works Thurso

Repowering of the existing turbine

Screening Applications Highland
28 Aug 2026 Approved 22 Oct 26/03294/FUL

Tarbat Golf Club Tarbatness Road Portmahomack Tain IV20 1YJ

Installation of an Air Source Heat Pump

Full Application Highland
28 Aug 2026 Under Consideration 26/03769/S36

Land 2400M SE Of Forsinain Forsinard

Forsinain Forest Wind Farm - Erection and operation of a wind farm for a period of 40 years, comprising up to 12 wind turbines (10 with a maximum blad...

Section 36 Highland
28 Aug 2026 Under Consideration 26/02976/FUL

Land 7.5KM SW Of MId Fearn Ardgay

Erection of a temporary wind monitoring meteorological mast of up to 100m in height

Full Application Highland
28 Aug 2026 Decided 25 Sep 26/03797/SCRE

Land 560M SW Of Torvean Golf Club Inverness

Environmental Impact Assessment (EIA) Screening Opinion Request for a proposed Solar PV Array and associated Battery Energy Storage System (BESS)

Screening Applications Highland
21 Aug 2026 Under Consideration 26/03624/S36

Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston

Tomchrasky Wind Farm Variation - application to increase the blade tip height from 185m to 250m and extend the operational lifetime from 30 years 40 y...

Section 36 Highland
19 Aug 2026 Under Consideration 26/03373/FUL

Land 60M NE Of Nevis Centre Ardlinnhe Road Fort William

Construction and operation of a micro energy storage project.

Full Application Highland
18 Aug 2026 Awaiting decision 26/03654/SCOP

Site 11920M NE Of Oakhyrst Cothill Nairn

Moray FLOW Park - Scoping Opinion Request (SCOP-0076)

Scoping Applications Highland
18 Aug 2026 Approved 20 Oct 26/03316/FUL

Bettyhill Village Hall Bettyhill

Erection of extension, replacement roof cladding, installation of air source heat pump and alterations

Full Application Highland
17 Aug 2026 Under Consideration 26/03178/FUL

Foinaven Assynt Street Evanton Dingwall IV16 9YH

Erection of house with ASHP and detached garage (amended deasign 22/02574/FUL)

Full Application Highland
7 Aug 2026 Under Consideration 26/03381/S36

Land 3750M SW Of Glencassley Castle Rosehall

Invercassley Wind Farm - Erection and Operation of a Wind Farm for a period of 35 years, comprising of 20 turbines, 18 turbines with a maximum blade t...

Section 36 Highland
6 Aug 2026 Refused 19 Oct 26/02853/PIP

Land 200M West Of Seaview Croft Dunmore Beauly

Erection of house, installation of wind turbine, agricultural building and 4no letting pods.

Planning Permission in Principle Highland
3 Aug 2026 Under Consideration 26/02931/FUL

Premises Hydroponicum Achiltibuie Ullapool IV26 2YG

Erection of 10no. house and installation of ground mounted solar PV (amendment to 24/03808/FUL, revised location of SUDs basin)

Full Application Highland
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Highland

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Highland?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Highland. You can also narrow the alert to a postcode, street, or drawn area.