Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston Data via plota.co.uk

26/03624/S36 - Section 36 Under Consideration

Proposal

Tomchrasky Wind Farm Variation - application to increase the blade tip height from 185m to 250m and extend the operational lifetime from 30 years 40 years of the consent for Tomchrasky Wind Farm (THC ref. ) comprising 14 turbines, battery energy storage system (BESS), anemometer mast, access tracks, four borrow pits, and associated infrastructure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Aug 2026
✓
Consultation
25 Aug 2026
Decision
Expected by 20 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 68.

The consultation period closed on 24 Sept 2026.

Documents 74

Statements & assessments 72

PDF EIAR VOLUME 4A FIGURE 8-1 - SHADOW FLICKER ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 7-1 - PROPOSED VARIED DEVELOPMENT NOISE CONTOUR PLOT ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 6-6 - NATIONALLY IMPORTANT HERITAGE ASSETS THE COMPARATIVE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 6-5 - NATIONALLY IMPORTANT HERITAGE ASSETS THE ZONE OF THE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 6-4 - NATIONALLY IMPORTANT HERITAGE ASSETS THE ZONE OF THE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 6-3 - NATIONALLY IMPORTANT HERITAGE ASSETS AND THE 10KM ST ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 6-2 - DESIGNATED HERITAGE ASSETS AND THE 5KM STUDY AREA ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 6-1 - HERITAGE ASSETS AND THE 1KM STUDY AREA ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 5-3 - ABNORMAL LOADS ROUTE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 5-2 - TRAFFIC COUNTER LOCATIONS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 5-1 - STUDY AREA ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-9 - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH EXIST ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-8 - CUMULATIVE BASELINE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-7 - VISUAL RECEPTORS WITHIN 5KM ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-6 - VISUAL RECEPTORS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF TOMCHRASKY WIND FARM VARIATION APPLICATION - PLANNING STATEMENT ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF TOMCHRASKY WIND FARM VARIATION APPLICATION - GLOSSARY AND ABBREVIATIONS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 6-9A-B - VIEWPOINT CH-36 TIR NAN OG CAIRN ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 6-8A-B - VIEWPOINT CH-35 BALNACARN TOWNSHIP ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 6-7A-D - VIEWPOINT CH-10 GLENMORISTON CEANN ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 6-12A-B - VIEWPOINT CH LEVESHIE COTTAGE FOR ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 6-11A-C - VIEWPOINT CH-40 GLENMORISTON TORG ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 6-10A-E - VIEWPOINT CH-37 FORT AUGUSTIS BER ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-27A-C - VIEWPOINT 16 GLAS BHEINN ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-26A-C - VIEWPOINT 15 CREAG AMHAIM ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-25A-D - VIEWPOINT 14 TOLL CREAGACH ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-24A-E - VIEWPOINT 13 MEALL FUAR MHONAIDH ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-23A-E - VIEWPOINT 12 GENERAL WADES MILITA ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-22A-D - VIEWPOINT 11 BEINN BHAN EVES ROAD ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-21A-D - VIEWPOINT 10 SGURR NAN CONBHAIREA ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-20A-C - VIEWPOINT 9 COIRE SGREUMH ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-19A-D - VIEWPOINT 8 CREAG BHOG ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-18A-E - VIEWPOINT 7 OLD MILITARY ROAD ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-17A-F - VIEWPOINT 6 A87 LAYBY NEAR MEMORI ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-16A-E - VIEWPOINT 5 A87 LAYBY ABOVE BUN L ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-15A-E - VIEWPOINT 4 A887 BELOW BUN LOYN ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-14A-I -VIEWPOINT 3 A887 OPPOSITE TOMCHRAS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-13A-E - VIEWPOINT 2 A887 INCHMORE HATCHER ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B VISUALISATIONS FIGURE 3-12A-E - VIEWPOINT 1 DALCHREICHART ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4B COVER AND CONTENTS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-5 - LANDSCAPE CHARACTER TYPES WITHIN APPROXIMATELY 15KM. ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-4 - COMPARATIVE ZONE OF THEORETICAL VISIBILITY TO 45KM ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-3 - ZONE OF THEORETICAL VISIBILITY OF HUBS AND TIPS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-28 - DESIGNATED LANDSCAPES ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-1 - ZONE OF THEORETICAL VISIBILITY TO 45KM ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 2-1 - INDICATIVE TURBINE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 1-4 - CUMULATIVE SITES WITHIN 15KM ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 1-3 - PROPOSED VARIED DEVELOPMENT ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 1-2 - CONSENTED DEVELOPMENT ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 1-1 - SITE LOCATION ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A COVER AND CONTENTS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 3TECHNICAL APPENDIX 2-1 - GRID CONNECTION ASSESSMENT PART 1 ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 3 TECHNICAL APPENDIX 6-2 - ASSET EVENT GAZETTEER REPORT ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 3 TECHNICAL APPENDIX 6-1 - CULTURAL HERITAGE PLATES ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 3 TECHNICAL APPENDIX 2-1 GRID CONNECTION ASSESSMENT PART 2 ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 3 TECHNICAL APPENDIX 1-1 - SCREENING OPINION ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 3 COVER AND CONTENTS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 COVER AND CONTENTS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 9 - COMPARATIVE ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 8 - OTHER ISSUES ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 7 - NOISE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 6 - CULTURAL HERITAGE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 5 - TRANSPORT AND ACCESS ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 4 - ORNITHOLOGY ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 3 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 2 - DESCRIPTION OF DEVELOPMENT ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 2 CHAPTER 1 - INTRODUCTION ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 1 - NON-TECHNICAL SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-28 - DESIGNATED LANDSCAPES ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-2 - ZONE OF THEORETICAL VISIBILITY AT 1 100000 SCALE ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-11 - COMBINED VISIBILITY WITH BUNLOINN WIND FARM.P ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗ PDF EIAR VOLUME 4A FIGURE 3-10 - COMBINED VISIBILITY WITH EXISTING BEINNEUN-MILLENIU ENVIRONMENTAL IMPACT ASSESSMENT · 11 Aug 2026 View ↗

All documents on the council site ↗

Associated applications 3

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Highland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Highland
Application type
Section 36
Received
21 Aug 2026
Validated
21 Aug 2026
Ward
Aird And Loch Ness
Parish
Fort Augustus And Glenmoriston Community Council
Case officer
Show
Target decision
20 Dec 2026
Decision level
Committee Decision
Applicant
Show

Decision outlook

Day 68, past the statutory target. 80% of commercial and major works in Highland are decided within thirteen weeks, which runs to 20 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 6812 days past the 56-day target
52%decided within 8 weeks
98%approved
233decided in the last year

Plota live figures for commercial and major works decided by Highland in the last twelve months, from validation. Highland decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
25 Aug 2026
Comments by
24 Sept 2026
Statutory expiry
20 Dec 2026
Env. assessment
No