Solar and renewables in Stirling

Stirling received 26 renewable energy applications in the last 12 months, including 13 battery storage sites and 5 heat pumps. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Stirling

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 17 of 17 applications
Yesterday Awaiting decision 26/00542/FUL

20 Bow Street Top Of The Town Stirling

Installation of Solar PV panels and battery storage units

Full Stirling
23 Oct 2026 Awaiting decision 26/00544/FUL

12 Lower Castlehill Top Of The Town Stirling

Installation of PV panels and battery storage

Full Stirling
23 Oct 2026 Awaiting decision 26/00543/FUL

10 Lower Castlehill Top Of The Town Stirling

Installation of solar PV panels and battery storage units

Full Stirling
23 Oct 2026 Awaiting decision 26/00501/FUL

37A - 37J Irvine Place Stirling

Installation of solar panels and battery storage units

Full Stirling
23 Oct 2026 Awaiting decision 26/00541/LBC

20 Bow Street Top Of The Town Stirling

Installation of solar PV panels and battery storage units

Listed Building Consent Stirling
15 Oct 2026 Awaiting decision 26/00527/FUL

10A - 10F Broad Street Top Of The Town Stirling

Installation of PV panels and battery storage

Full Stirling
13 Oct 2026 Awaiting decision 26/00534/FUL

Powis House Doo'Cot Manor Powis Stirling FK9 5PS

Installation of one air source heat pump, ground-mounted on an independent base. Including, service pipework passing through a limited wall penetratio...

Full Stirling
13 Oct 2026 Awaiting decision 26/00506/LBC

Powis House Doo'Cot Manor Powis Stirling FK9 5PS

Installation of a ground-mounted air source heat pump at the rear of the property, with limited associated insulated pipework and service connections....

Listed Building Consent Stirling
8 Oct 2026 Awaiting decision 26/00526/LBC

10A - 10F Broad Street Top Of The Town Stirling

Installation of Solar PV panels and Battery Storage Units

Listed Building Consent Stirling
8 Oct 2026 Awaiting decision 26/00525/LBC

30A - 30D Queen Street Stirling

Installation of solar panels and battery storage units

Listed Building Consent Stirling
8 Oct 2026 Awaiting decision 26/00517/FUL

Cuthill Brae Caravan Park Cuthil Brae Blairdrummond FK9 4UP

Re-locate the solar panel array (approved in planning approval 25/00061/FUL) with associated works and builds

Full Stirling
7 Oct 2026 Awaiting decision 26/00497/FUL

30A - 30D Queen Street Stirling

Installation of solar panels and battery storage units

Full Stirling
7 Oct 2026 Awaiting decision 26/00496/FUL

9 - 15 The Brae Bannockburn

Installation of solar panels and battery storage units

Full Stirling
30 Sept 2026 Awaiting decision 26/00440/LBC

17 Princes Street Stirling FK8 1HQ

Installation of solar PV panels to the rear/non-street-facing roof slope only and associated battery storage unit to be mounted in the courtyard at th...

Listed Building Consent Stirling
25 Sept 2026 Awaiting decision 26/00495/LBC

9 - 15 The Brae Bannockburn

Installation of solar panels and battery storage units

Listed Building Consent Stirling
27 Aug 2026 Awaiting decision 26/00444/FUL

Land At Cairnoch Hill Carronbridge

Install and operate up to 4no. wind turbines (up to a maximum overall height of 180 metres) and associated infrastructure

Full Stirling
20 Aug 2026 Approved 15 Oct 26/00381/LBC

Helensfield Fore Road Kippen FK8 3DT

Installation of Biomass heating system including a new external flue to the rear of the dwelling.

Listed Building Consent Stirling
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Stirling

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Stirling?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Stirling. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Stirling's planning portal daily. New solar & renewables applications appear here within a day of being published.