Search Peak District National Park planning applications

See all 13,349 planning applications since 2016, 311 in the last 90 days, from Peak District National Park across 86 towns and areas and 20 postcode districts. Search and filter them by date, status, development type or number of homes, see the latest on the map, or get a free alert for new applications.

Date received
Get alerts for Peak District

Source: Peak District National Park·Updated daily·Last checked 29 Oct 2026

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application typeAny
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 50 of 311 applications
Yesterday REGISTERED NP/DDD/0826/0840

Home Farm ,Church Lane,Rowsley,

Erection of slurry store

Full Planning Permission Peak District
Yesterday REGISTERED NP/DDD/1026/1054

1 Sycamore Barn,Main Street,Taddington,

Installation of air source heat pump

Full Planning Permission Peak District
Yesterday REGISTERED NP/DIS/1026/1053

Shireoaks Farm,Unnamed Road From Breck Corner To Shireoaks Farm,The Wash,Chapel-En-Le-Frith,

Discharge of conditions 4, 6, 7, 8 and 11 on NP/HPK/0822/1040.

Discharge of Conditions Peak District
Yesterday REGISTERED NP/DDD/1026/1080

1 Brookside Cottage,Park Lane,Baslow

Alterations to two side-facing conservation-style rooflights to provide clear glazing and openable units, in place of the obscure-glazed rooflights p...

Full Planning Permission Peak District
Yesterday REGISTERED NP/CEC/1026/1081

Harrop Fold Farm,Macclesfield Road,Rainow,

S.73 application for the variation of Condition 2 and 4 on NP/CEC/0423/0458

Section 73 Peak District
Yesterday REGISTERED NP/DIS/1026/1083

Shireoaks Farm,Unnamed Road From Breck Corner To Shireoaks Farm,The Wash,Chapel-En-Le-Frith,

Discharge of conditions 4, 6, 7, 8, 10, and 14 on NP/HPK/0822/1039.

Discharge of Conditions Peak District
2 days ago REGISTERED NP/TCA/1026/1066

Tatra Mount,East Bank,Winster,Matlock,DE4 2DT

Pollard one cherry tree to 7ft Top one acacia tree to 7ft Top one apple tree to 7ft

Conservation Area Tree Work Peak District
2 days ago REGISTERED NP/CEC/1026/1068

Cophurst,Shrigley Road,Pott Shrigley,

Listed Building consent - Low Pressure Abrasive Paint Removal from External Brickwork and Lime Wash

Listed Building Consent (alter or extend) Peak District
2 days ago REGISTERED NP/NMA/1026/1076

Herod Edge Farm,Monks Road,Glossop,

Non-material amednment on NP/HPK/0726/0670.

Non-Material Amendment Peak District
2 days ago REGISTERED NP/GDO/1026/1069

Burton Manor Farm,Unnamed Track From Bakewell Road To Burton Manor Farm,Bakewell,DE45 1JX

GDO Notification - Steel portal frame agricultural building for the storage of hay, straw and farm machinery.

Application under the GPDO Peak District
2 days ago REGISTERED NP/GDO/1026/0981

Thorntree Farm,Friden Road,Middleton By Youlgrave,

GDO Notification - Proposed agricultural livestock buildings

GDO Application extended Peak District
26 Oct 2026 REGISTERED: Valid NP/SM/1026/0970

Shorecroft,Back Lane,Warslow,,

Replacement of the existing detached single storey garage with new detached single storey garage for two cars.

Full Planning Permission Peak District
26 Oct 2026 REGISTERED: Under Assessment NP/DIS/1026/1049

Kettle House,Unnamed Road From B6001 To Torr Farm,Leadmill,Hathersage,

Discharge of conditon 3 on NP/DDD/0626/0622.

Discharge of Conditions Peak District
26 Oct 2026 REGISTERED: Under Assessment NP/TCA/1026/1060

Topcroft,Main Road,Hathersage,S32 1BB

Further work at the front of the property. Structural survey has identified this group of trees situated close to the building as the likely cause of ...

Conservation Area Tree Work Peak District
26 Oct 2026 REGISTERED: Under Assessment NP/TCA/1026/1059

Blackwell Dale,Priestcliffe Ditch,SK17 8SN

See report - Works to diseased tree(s) posing a risk to the highway

Conservation Area Tree Work Peak District
26 Oct 2026 REGISTERED: Under Assessment NP/TCA/1026/1058

Croft House,Hungry Lane,Bradwell,S33 9JD

T1 Yew : crown raise to 2m from the ground and trim all around to reduce in size by up to 1m. To maintain the size of this tree over the driveway.

Conservation Area Tree Work Peak District
26 Oct 2026 REGISTERED: Valid NP/DDD/1026/1055

Butts House,Butts View,Bakewell,

Retrospective Listed Building Consent - Structural repairs and associated alterations to listed building.

Listed Building Consent (alter or extend) Peak District
26 Oct 2026 REGISTERED: Valid NP/HPK/1026/1052

Mayfield,West Lees Road,Bamford,

S.73 application for the variation of condition 2 on NP/HPK/0426/0373,

Section 73 Peak District
26 Oct 2026 REGISTERED: Valid NP/DDD/1026/1051

York Villa,Station Road,Hathersage

The lateral extension of the existing rear lean-to and the installation of double leaf sliding doors to the existing outhouse

Full Planning Permission Peak District
26 Oct 2026 REGISTERED: Valid NP/DDD/1026/1050

Silver Trees,Coggers Lane,Hathersage

Extensions and Alterations

Full Planning Permission Peak District
26 Oct 2026 REGISTERED: Under Assessment NP/TCA/1026/1064

The Headlands,East Bank,Winster,DE4 2DS

This tree was a small Christmas Tree planted some years ago which has outgrown its space. We have the opportunity to donate it to the community for u...

Conservation Area Tree Work Peak District
26 Oct 2026 REGISTERED: Valid NP/DDD/1026/1063

Monsal Head Hotel,Monsal Head,Ashford,

Removal of the existing first-floor projecting bay window/enclosed balcony structure on the northern elevation of the Monsal Head Hotel, together with...

Full Planning Permission Peak District
26 Oct 2026 REGISTERED: Under Assessment NP/DIS/1026/1062

Land at Brough,Brough,

Discharge of conditions 3, 4, 5, 16, and 18 on NP/HPK/1021/1158.

Discharge of Conditions Peak District
26 Oct 2026 REGISTERED NP/SM/1026/0976

Harewood Cottage Levens,Weags Bridge Road,Grindon,

Replace the existing oil-fired heating system with a modern air source heat pump installation.

Full Planning Permission Peak District
22 Oct 2026 REGISTERED: Under Assessment NP/DDD/0926/0962

52 Tithe Barn Close,Tideswell,

Lawful Development Certificate for a proposed use - The existing use of the land is lawful as it forms part of the existing residential property and i...

Lawful Development Certificate (proposed) Peak District
22 Oct 2026 REGISTERED: Under Assessment NP/HPK/1026/0968

19 Clough Lane,Little Hayfield,

Retrospective consent for creation of a driveway

Full Planning Permission Peak District
22 Oct 2026 Decided NP/TCA/1026/1048

The Croft,Main Street,Birchover,Matlock,

Fell to ground level due to location.

Conservation Area Tree Work Peak District
21 Oct 2026 REGISTERED: Valid NP/DDD/1026/1021

Former Carthouse adjoining 26 Queen Street,Tideswell

Change of use of former barn/carthouse to domestic use. Partial reconstruction and refurbishment of existing building to form new dwelling

Full Planning Permission Peak District
21 Oct 2026 REGISTERED: Under Assessment NP/DIS/1026/1040

Dale Cottage,The Dale,Eyam,

Discharge of condition 6 on NP/DDD/0925/0907.

Discharge of Conditions Peak District
21 Oct 2026 Decided NP/TCA/1026/1044

Old Lawton Farm,Midhope Lane,Sheffield,S36 4GX

Ash (T1) - to fell due to presence of honey fungus around base of tree, historically heavily pollard and large amount of rot inhibited around remaini...

Conservation Area Tree Work Peak District
21 Oct 2026 Decided NP/TCA/1026/1042

Tithe Barn,Main Street,Great Longstone,DE45 1TZ

T1 - Removal of 2 x lower branches from Ash tree overhanging the road T2 - Removal of deadwood from Ash tree; and T3 - Removal of 2 x stems from dea...

Conservation Area Tree Work Peak District
21 Oct 2026 Decided NP/TCA/1026/1043

Chapel House,High Street,Tideswell,Buxton,SK17 8LB

T1- 2.5m crown reduction of Beech Hedge

Conservation Area Tree Work Peak District
21 Oct 2026 Decided NP/TCA/1026/1041

Withen View,Grindlow,Great Hucklow,Buxton,SK17 8RJ

T1, T2 and T3 - Reduce the large Ash trees in height by 30%, remove die back and any other dead-wooding Crown lift mature Beech T4, Elm T5 and Sycamo...

Conservation Area Tree Work Peak District
20 Oct 2026 REGISTERED: Under Consultation NP/S/1026/0977

Plough Barn,New Road,Bradfield,

Advertisement consent - Installation of new none illuminated timber shop frontage signage

Advertisement Consent Peak District
20 Oct 2026 REGISTERED: Valid NP/DDD/1026/1039

Overfields Farm,Tissington,DE6 1RA

Proposed Agricultural Infill Lean-to to Cover a Collecting Yard - Phase 3

Full Planning Permission Peak District
20 Oct 2026 REGISTERED: Valid NP/DDD/1026/1038

Overfields Farm,Tissington,DE6 1RA

Proposed Agricultural Straw and Bulk Feed Storage - Phase 2

Full Planning Permission Peak District
20 Oct 2026 REGISTERED: Valid NP/DDD/1026/1037

Overfields Farm,Tissington,

Proposed Agricultural Cubicle Building Phase 1

Full Planning Permission Peak District
20 Oct 2026 REGISTERED: Under Assessment NP/TCA/1026/1036

Beech House,Main Street,Great Longstone,Bakewell,DE45 1TF

Reduce a hedge to make it a manageable maintainable liner shape

Conservation Area Tree Work Peak District
20 Oct 2026 Decided NP26/1035

Shakerley, Main Street, Great Longstone, Bakewell, DE45 1TZ

due to lack of access for a cherry picker and the inability to remove the tree from the ground. Following the working at height regulations the tree ...

Conservation Area Tree Work Peak District
20 Oct 2026 REGISTERED: Under Consultation NP/S/1026/1034

2 Moscar Cross Cottages,Manchester Road,Crosspool,Sheffield

Retrospective consent to retain as built height of glazed link between cottage and garage block.

Full Planning Permission Peak District
19 Oct 2026 REGISTERED: Under Assessment NP/NMA/1026/1033

Wheat Hay Farm,Shatton Lane,Shatton,

Non Material Amendments of condition 2 to NP/HPK/0525/0436 - . Additional windows and rooflights, and minor dimensional changes to windows and doors.

Non-Material Amendment Peak District
19 Oct 2026 REGISTERED: Under Consultation NP/SM/1026/1027

Land to the South of B5054,Hulme End Road,Hulme End,

Erection of an agricultural building to provide a covered winter feeding area, cattle handling and hay storage, together with an access track

Full Planning Permission Peak District
19 Oct 2026 REGISTERED: Under Assessment NP/NMA/1026/1026

The Manor House,Froggatt Edge,Calver,

Non Material Amendments to NP/DDD/0124/0076 : Glazing to the East elevation to be replaced with solid stone wall and re using of window which is to be...

Non-Material Amendment Peak District
19 Oct 2026 REGISTERED: Under Consultation NP/SM/1026/1024

Froghall Farm,Knowsley Hill,Longnor,

Conversion of agricultural barns attached to farmhouse to a residential annex, demolition of rear barn and replacement with smaller structure as part ...

Full Planning Permission Peak District
19 Oct 2026 REGISTERED: Under Assessment NP/DIS/1026/1023

The Wash House,Gauledge Lane,Longnor,

Discharge of conditions 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 17, 19, 20 and 24 on NP/SM/0925/0958.

Discharge of Conditions Peak District
19 Oct 2026 REGISTERED: Under Consultation NP/DDD/1026/1022

Barn Croft and Hafod Bach,Pinfold Hill,Curbar,

Alterations to existing access to Barn Croft & Hafod Bach.

Full Planning Permission Peak District
19 Oct 2026 Decided NP/DIS/1026/1029

Newhaven Caravan Park,Unnamed Section Of A5012 From A515 To Newhaven Crossing,Newhaven,

Discharge of condition 6 on NP/DDD/1024/1137.

Discharge of Conditions Peak District
19 Oct 2026 REGISTERED: Under Consultation NP/S/1026/1028

Watch House,Towngate,Bradfield,

Listed Building consent - Installation of new flue to external wall and replacement internal gas boiler to dwelling.

Listed Building Consent (alter or extend) Peak District
19 Oct 2026 Decided NP26/1032

Wrens Nest, Main Road, Biggin, Buxton, SK17 0DQ

Willow trees near path need pruning. Remove one Holly tree and trim down another.

Conservation Area Tree Work Peak District
19 Oct 2026 REGISTERED: Under Consultation NP/HPK/1026/1031

School House,Unnamed Road From A53 To Brand Top Farm,Brandside,

Remodelling and renovation of existing dwelling

Full Planning Permission Peak District
Recency
Last 2 weeks
2-4 weeks
1–2 months
Older

Get free email alerts for new planning applications in Peak District

All towns and areas in Peak District (86)
Aldwark (Peak District)AlstonefieldAshford in the WaterAston (High Peak)BakewellBamfordBaslowBeeleyBirch ValeBirchoverBlore with SwinscoeBosleyBradbourneBradfield (Sheffield)Bradwell (High Peak)Brough and ShattonBuxton (High Peak)CalverCastleton (High Peak)Castleton (Peak District)ChatsworthChelmortonChinleyChinley, Buxworth and BrownsideCubleyCurbarEdaleEyamFawfieldheadFenny BentleyFlaggFroggattGlossopGreat HucklowGreat LongstoneGrindlefordGrindlowGrindonHadfieldHarthillHartingtonHartington Nether QuarterHartington Town QuarterHartington upper QuarterHassopHathersageHayfieldHeathyleeHeatonHighlowHollinscloughHope (High Peak)Hope WoodlandsIlamKettleshulme and Lyme HandleyKing SterndaleLeekfrithLitton (Peak District)Longnor (Peak District)Middleton and SmerrillMonyashNether HaddonNew MillsOnecoteOver HaddonParwichPeak ForestPott ShrigleyQuarnfordRainowRowsleySheenSouth DarleyStanton (Peak District)Stoney MiddletonTaddingtonThornhillThorpe (Peak District)TideswellTissington and Lea HallTittesworthWarslow and ElkstonesWhestonWinsterWormhillYoulgreave
Postcode districts in Peak District (20)
DE4DE45DE6S1S10S11S17S32S33S36S6SK10SK11SK13SK17SK22SK23ST10ST13ST8

Decisions in Peak District Full decision record →

50daysmedian to decide4 days faster than UK
74%decided within 8 weeks8 pts above UK
88%approved2 pts below UK
105of 388UK rank for speeddown 102 places on last year

950 decisions in the 12 months to September 2026. Days run from validation to decision, the clock councils report against; Plota live figures.

Frequently asked questions

How long does Peak District National Park take to decide a planning application?
Across the 950 applications Peak District National Park decided in the last 12 months, the median time from validation to decision was 50 days, and 74% were decided within 8 weeks. The UK median over the same period is 54 days.
What proportion of planning applications does Peak District National Park approve?
88% of the applications Peak District National Park decided in the last 12 months were approved. Withdrawn applications are not counted as decisions.
Where does this planning application data come from?
Every application on this page comes from Peak District National Park's public planning register (planning.peakdistrict.gov.uk). Plota collects it, adds a map location and a category, and links each record back to the council's own entry, which is the authoritative version.
How often is this page updated?
Plota checks Peak District National Park's register every day and adds new applications, status changes and decisions as the council publishes them. The register was last checked on 29 Oct 2026.
Where can I see the plans and documents for an application?
Plans, drawings and officer reports are held on Peak District National Park's own website. Where the council publishes a document list, it appears on the application's page here with each item linking to the council's copy; otherwise the "View original council record" link on every application opens the council's entry.

About this data

Plota holds 13,349 planning applications from Peak District National Park since 2016, each counted once: 1,593 current records, received since 9 Jun 2023, and 11,756 earlier ones in the Plota archive, searchable by location and keyword. 311 were received in the last 90 days. Current records are collected from the council's public register at planning.peakdistrict.gov.uk and checked every day; the last check was on 29 Oct 2026. Each record carries the council's reference, address, proposal, dates, status and decision, with a map location and Plota's classification by type and procedure added. The council's own record is the authoritative version; every entry here links to it.

Latest application from Peak District: 28 Oct 2026. We check the council's portal daily.