Search Peak District National Park planning applications

Search current and historic planning applications published by Peak District National Park Authority - 290 applications in the last 90 days across 51 towns and areas and 11 postcode districts. Filter applications by date, status, development type, or number of homes, view them on the map, or create a free alert for new applications.

290
|
110
|
52

Source: Peak District National Park·Updated daily·Last checked 13 Sept 2026

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application typeAny
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 50 of 290 applications
10 Sept 2026 REGISTERED: Valid NP/DDD/0826/0817

One Ash Grange Farm,Long Rake,Youlgrave,

Advertisement consent - Three bespoke A1 lectern-style interpretation panels will be installed at key locations around One Ash Grange Farm.

Advertisement Consent Peak District
10 Sept 2026 REGISTERED: Under Assessment NP26/0897

Mill Waters, Edale Road, Hope, Hope Valley, S33 6ZF

Multiple Sycamores on the banks of the river Noe to be worked on over the next few years. First sycamore is 20m high with a fairly sparse but heavy c...

Conservation Area Tree Work Peak District
10 Sept 2026 REGISTERED: Under Assessment NP26/0895

Green Acres Farm,Edale Road,Edale ,Hope Valley,S33 7ZH

A double row of 24 conifers between Edale road and the farm house/garden. 15 metres high 7 metre spread. Touching the roof of the house in places. Ori...

Conservation Area Tree Work Peak District
10 Sept 2026 REGISTERED: Valid NP/DDD/0926/0891

The Moon Inn,High Street,Stoney Middleton,

Replace 7 no.s windows to the front (North) elevation.

Full Planning Permission Peak District
10 Sept 2026 REGISTERED: Valid NP/DDD/0926/0890

The H Boutique Hotel,Water Street,Bakewell,

Extension and alteration to the H Boutique Hotel by addition of two-storey suite located over the existing first floor decking located to the rear, ac...

Full Planning Permission Peak District
10 Sept 2026 REGISTERED: Under Assessment NP26/0899

Topcroft, Main Road, Hathersage, Hope Valley, S32 1BB

T1 • Cherry : remove one very low small branch hanging over the footpath into the neighbours garden T2 • Large conifer by the neighbours house, clo...

Conservation Area Tree Work Peak District
10 Sept 2026 REGISTERED: Under Assessment NP26/0898

Castleton Hall, Castle Street, Castleton, Hope Valley, S33 8WG

T1 Copper Beech Prominent tree situated at front of property. Previously reduced in 2021 following tree report and QTRA recommendations for crown re...

Conservation Area Tree Work Peak District
10 Sept 2026 REGISTERED: Valid NP/DDD/0926/0896

1 Moos Barn,Main Road,Flagg,

Proposed link extension.

Full Planning Permission Peak District
10 Sept 2026 REGISTERED NP/DDD/0926/0879

Birdsgrove,Main Street,Biggin,

Change of use of existing B1 (eg) office to self-catering holiday accommodation.

Full Planning Permission Peak District
9 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0889

Nicholas Hall,Thornhill,Bamford,S33 0BR

T1 & T2 - Oak & Western Red Cedar - Crown lift to suitable replacement branches T3 - Oak - Prune back to suitable replacement branches to give 2m clea...

Conservation Area Tree Work Peak District
9 Sept 2026 REGISTERED: Under Assessment NP/DIS/0926/0873

Haig House,Bath Street,Bakewell,

Discharge of Conditions 5 (a) and (b) on NP/DDD/0423/0468

Discharge of Conditions Peak District
9 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0892

Glen Eldon,Parke Road,Tideswell,Buxton,SK17 8NS

Application for Tree works to a Mapel Tree

Conservation Area Tree Work Peak District
9 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0888

Play Area,Brookside,Bradwell,S33 9HF

T1- 30% (3.5m) crown reduction of Sycamore tree located adjacent to Brook Cafe.

Conservation Area Tree Work Peak District
9 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0887

Old Mill,Calver Road,Baslow,Bakewell,DE45 1RP

Alder, T1, crown reduction by 50%- 5m.

Conservation Area Tree Work Peak District
9 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0886

Bagshaw Hall,Bagshaw Hill,Bakewell,

As x4 - fell due to inappropriate location to buildings. T1

Conservation Area Tree Work Peak District
9 Sept 2026 REGISTERED: Under Consultation NP/DDD/0926/0885

Rose Farm,Unnamed Road From Rock Lodge Farm To Priestcliffe Road,Priestcliffe,

Listed Building consent - Repointing of front (NE) elevation and paint removal from stone surrounds on front (NE) elevation

Listed Building Consent (alter or extend) Peak District
9 Sept 2026 REGISTERED: Under Assessment NP/DIS/0926/0884

Hall Hill,Fawfield Head,Longnor,

Discharge of conditions 3 , 10 , 11, 12, 14, 15, 16, 17 & 18.on NP/SM/0125/0052.

Discharge of Conditions Peak District
9 Sept 2026 REGISTERED NP/DDD/0426/0430

1 The Thorn,Main Road,Eyam,

Raise the ridge and eaves level of our existing timber built garage by 600mm to allow sufficient headspace to park our van inside.

Full Planning Permission Peak District
8 Sept 2026 REGISTERED: Under Assessment NP26/0880

36 The Village,Woodhead Road,Holme,Holmfirth,Kirklees,HD9 2QG

T1 - Reduce size of tree all around by approx 1-2m and crown lift over the driveway to give 5m clearance and 3m over the garden. All works are to main...

Conservation Area Tree Work Peak District
8 Sept 2026 REGISTERED: Under Assessment NP/GDO/0926/0883

Broadmeadow Farm,Lawns Lane,Alport,

GDO Notification - Proposed portal frame agricultural barn for the storage of corn/animal feed and straw, including associated yard and earthworks.

Application under the GPDO Peak District
8 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0882

49 Middle Row,Unnamed Road From The Gables To Cressbrook Old School Via Lower Wood,Cressbrook,SK17 8SX

T1; Pruning back to old cuts of branches from small Elm tree, roughly 8.5cm in diameter

Conservation Area Tree Work Peak District
8 Sept 2026 REGISTERED: Valid NP/DDD/0926/0881

Nether Water Farm,Tideswell,

Proposed agricultural machinery and implement storage building.

Full Planning Permission Peak District
8 Sept 2026 REGISTERED NP/SM/0826/0842

Fawside Farm,Longnor,

Change of use of dwellinghouse and outbuildings to sui generis use, residential recording studio with temporary accommodation and ancillary facilities...

Full Planning Permission Peak District
7 Sept 2026 REGISTERED: Under Assessment NP/DDD/0826/0858

The Cottage,Litton Dale,Litton,

Proposed demolition of 2 domestic garages/ancillary living buildings and erection of one building to incorporate garaging and ancillary living accommo...

Full Planning Permission Peak District
7 Sept 2026 REGISTERED: Under Assessment NP/DIS/0926/0872

Old Moor Quarry (Tunstead),Wormhill,Buxton

Discharge of conditions 22, 28 and 39 on NP/HPK/1013/0898

Review of Mineral Permissions Peak District
7 Sept 2026 REGISTERED: Under Assessment NP/DIS/0926/0870

Bank House Guest House,Market Place,Hartington,

Discharge of conditions 4 and 5 on NP/DDD/1225/1308.

Discharge of Conditions Peak District
7 Sept 2026 REGISTERED: Under Assessment NP/DIS/0926/0875

Copperfield,Back Lane,Hathersage,

Discharge of conditions to NP/DDD/0625/0635 - Conditions 4, 6, 7 and 9.

Discharge of Conditions Peak District
7 Sept 2026 REGISTERED: Under Assessment NP/GDO/0926/0874

Watt House Farm,High Bradfield,

GDO Notification - Erection of a fully enclosed, mono-pitch agricultural building

Application under the GPDO Peak District
7 Sept 2026 REGISTERED NP/HPK/0926/0878

Booth Farm,Washgate Lane,Hollinsclough,

Change of use of the land from agricultural use to land used in connection with two holiday letting units.

Full Planning Permission Peak District
3 Sept 2026 REGISTERED: Under Assessment NP/DDD/0926/0862

Lathkill Farm,Monyash Road,Over Haddon,

Proposed erection of farm workers dwelling

Full Planning Permission Peak District
2 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0865

Old Gate House,Eaton Hill,Baslow,DE45 1SB

T1 - Sycamore - Dismantle due to it's close proximity to the house and is showing die back in the upper canopy (possibly squirrel damage) T2 - Red...

Conservation Area Tree Work Peak District
2 Sept 2026 REGISTERED: Under Assessment NP/NMA/0926/0868

7 Sherwood Road,Tideswell,

Non-material amendment to NP/DDD/0525/0503 - Change of roofing material from Forticrete Hardrow 'Old Stone' concrete slates to Natural Blue slate.

Non-Material Amendment Peak District
2 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0867

Stone Croft,Spooner Lane,Froggatt,S32 3ZA

Willow - a previously pollarded willow is to be reduced to bring growth away from the neighbour’s property and reduce the weight of the main extendin...

Conservation Area Tree Work Peak District
2 Sept 2026 REGISTERED: Under Assessment NP/TCA/0926/0866

Derventio House,Buxton Road,Ashford In The Water,DE45 1QP

Elm. Tree to be removed due to dead condition and overhang of road. Location: On roadside NEXT TO Derventio House, Buxton Road, Ashford-in-the-Water,...

Conservation Area Tree Work Peak District
1 Sept 2026 REGISTERED: Under Consultation NP/HPK/0826/0782

Edale Arqiva Site ,Greenlands Farm,Edale,

Proposed upgrade to the existing telecommunications equipment and works to upgrade cabin and associated ancillary works.

Full Planning Permission Peak District
1 Sept 2026 REGISTERED: Under Consultation NP/DDD/0826/0829

Longstone Hall,Main Street,Great Longstone,

Listed Building consent - Removal and re-laying of existing tiles to western and northern pitched roofs.

Listed Building Consent (alter or extend) Peak District
1 Sept 2026 REGISTERED: Under Consultation NP/DDD/0826/0837

Monsal Head Hotel,Monsal Head,Ashford,

Replacement/refurbishment of existing first floor bay window.

Full Planning Permission Peak District
1 Sept 2026 Approved NP/NMA/0826/0839

Willow Brook House,Shatton Lane,Shatton,

Non Material Amendments on NP/HPK/0625/0543

Non-Material Amendment Peak District
1 Sept 2026 REGISTERED: Under Consultation NP/CEC/0826/0847

Cophurst,Shrigley Road,Pott Shrigley,

Listed Building consent - Proposed remedial works intended to arrest internal timber deterioration in the roof.

Listed Building Consent (alter or extend) Peak District
1 Sept 2026 REGISTERED: Under Consultation NP/CEC/0826/0845

Cophurst,Shrigley Road,Pott Shrigley,

Listed Building consent - Low pressure abrasive paint removal from external brickwork

Listed Building Consent (alter or extend) Peak District
1 Sept 2026 REGISTERED: Under Consultation NP/CEC/0826/0846

Cophurst,Shrigley Road,Pott Shrigley,

Listed Building consent - Proposed internal renovation and services upgrade.

Listed Building Consent (alter or extend) Peak District
1 Sept 2026 REGISTERED NP/CEC/0826/0860

Hawkslee Barn,Minn End Lane,Bosley,

Conversion, remodelling and extension of agricultural barn (Hawkslee Barn) to form one dwelling house (Use Class C3).

Full Planning Permission Peak District
1 Sept 2026 REGISTERED: Under Assessment NP/DDD/0826/0859

Merman Barn,Alma Road,Tideswell,

Lawful Development certificate for an existing use - Installation of 2No. chimneys and replacement of timber windows and doors with wood-effect UPVC f...

Lawful Development Certificate (existing) Peak District
1 Sept 2026 REGISTERED: Under Assessment NP/TCA/0826/0857

The Old Mill,Litton Mill,Litton Mill,SK17 8SW

G1 containing 2 mature Beech trees requiring a 25-30% reduction mostly in height, removing around 3-4m client wants to retain the lower canopy to keep...

Conservation Area Tree Work Peak District
1 Sept 2026 REGISTERED: Under Assessment NP/TCA/0826/0856

Forge House,Bottomhill Road,Cressbrook,SK17 8SA

To fell dead Elm trees along river side

Conservation Area Tree Work Peak District
1 Sept 2026 Approved NP/NMA/0826/0855

Oswald House,The Hills,Bradwell,

Non-Material Amendment on NP/DDD/0725/0692. Change of facing materials to the extensions to match the existing house Stone dressings to be sawn natur...

Non-Material Amendment Peak District
1 Sept 2026 REGISTERED: Under Assessment NP/TCA/0826/0854

Carpenters Cottage,East Bank,Winster,DE4 2DT

1 Beech tree to crown lift over garden to give 4m ground clearance and prune to give 3m clearance from property, removing approximately 20 branches r...

Conservation Area Tree Work Peak District
1 Sept 2026 REGISTERED: Under Assessment NP/TCA/0826/0853

Graylyn Mews,Dale Road,Over Haddon,DE45 1JE

1 Conifer hedge to fell - hedge is pushing boundary wall

Conservation Area Tree Work Peak District
1 Sept 2026 Decided NP/TCA/0826/0852

Sheldon House,Main Street,Youlgrave,DE45 1UW

1 Conifer tree - to reduce height by 2m down to old pruning points and prune back from property

Conservation Area Tree Work Peak District
1 Sept 2026 REGISTERED: Under Assessment NP26/0864

Rose Farm, Fennel Street, Ashford In The Water, DE45 1QF

Shown in the photographs is a cherry which I request to lift to roughly the height indicated by the red line. Growing within the cherry is a large eld...

Conservation Area Tree Work Peak District
Recency
Last 2 weeks
2-4 weeks
1–2 months
Older

Get free email alerts for new planning applications in Peak District

All towns and areas in Peak District (51)
AlstonefieldAshford in the WaterBakewellBamfordBaslowBeeleyBradwell (High Peak)Brough and ShattonButtertonCalverCastleton (High Peak)ChatsworthChinleyCurbarEdaleEyamFawfieldheadFoolowFroggattGreat HucklowGreat LongstoneGrindlefordGrindonHartingtonHartington upper QuarterHassopHathersageHayfieldHope (High Peak)Hope (Peak District)IlamLeekfrithLitton (Peak District)MonyashOnecoteOver HaddonParwichPeak ForestRowsleySouth DarleyStanton (Peak District)Stoney MiddletonThornhillThorpe (Peak District)TideswellTissington and Lea HallWardlowWaterhousesWinsterWormhillYoulgreave
Postcode districts in Peak District (11)
DE4DE45DE6S32S33SK17SK22SK23ST10ST13ST8

Decisions in Peak District Full decision record →

52daysmedian to decideUK average
74%decided within 8 weeks1 pts above UK
84%approved5 pts below UK
152of 323UK rank for speeddown 72 places on last year

433 decisions in the 12 months to August 2026. Days run from validation to decision, the clock councils report against; Plota live figures.

Frequently asked questions

How long does Peak District National Park take to decide a planning application?
Across the 433 applications Peak District National Park decided in the last 12 months, the median time from validation to decision was 52 days, and 74% were decided within 8 weeks. The UK median over the same period is 52 days.
What proportion of planning applications does Peak District National Park approve?
84% of the applications Peak District National Park decided in the last 12 months were approved. Withdrawn applications are not counted as decisions.
Where does this planning application data come from?
Every application on this page comes from Peak District National Park's public planning register (planning.peakdistrict.gov.uk). Plota collects it, adds a map location and a category, and links each record back to the council's own entry, which is the authoritative version.
How often is this page updated?
Plota checks Peak District National Park's register every day and adds new applications, status changes and decisions as the council publishes them. The register was last checked on 13 Sept 2026.
Where can I see the plans and documents for an application?
Plans, drawings and officer reports are held on Peak District National Park's own website. Where the council publishes a document list, it appears on the application's page here with each item linking to the council's copy; otherwise the "View original council record" link on every application opens the council's entry.

About this data

Plota holds 778 current planning applications from Peak District National Park, received since 6 Jan 2026, 290 of them in the last 90 days. Behind them, the Plota archive holds 12,349 earlier applications from Peak District National Park, 2016 to 2025, searchable by location and keyword. Current records are collected from the council's public register at planning.peakdistrict.gov.uk and checked every day; the last check was on 13 Sept 2026. Each record carries the council's reference, address, proposal, dates, status and decision, with a map location and Plota's classification by type and procedure added. The council's own record is the authoritative version; every entry here links to it.

Latest application from Peak District: 10 Sept 2026. We check the council's portal daily.