Former Carthouse adjoining 26 Queen Street,Tideswell Data via plota.co.uk

NP/DDD/1026/1021 - Full Planning Permission REGISTERED: Valid

Proposal

Change of use of former barn/carthouse to domestic use. Partial reconstruction and refurbishment of existing building to form new dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2026
✓
Validated
21 Oct 2026
Decision
Expected by 16 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 12 Dec 2026 and 24 Dec 2026, from Peak District's recent changes of use.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Peak District Dales SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Tideswell conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Tideswell built-up area; Open access land about 23 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed.; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 5, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 22 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
14 Oct 2026
Validated
21 Oct 2026
Parish
Tideswell
Case officer
Show
Applicant
Show

Decision outlook

Day 7 of the 56-day target. Peak District usually decides changes of use by day 53.

Day 749 days to the 56-day target
56%decided within 8 weeks
75%approved
41decided in the last year

Plota live figures for changes of use decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
20 Nov 2026
Statutory expiry
16 Dec 2026