Overfields Farm,Tissington, Data via plota.co.uk

NP/DDD/1026/1037 - Full Planning Permission REGISTERED: Valid

Proposal

Proposed Agricultural Cubicle Building Phase 1 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Oct 2026
Decision
Expected by 15 Dec 2026

As of 28 Oct 2026, the council is no longer showing this application on their planning portal. It may have been withdrawn or re-listed under a different reference. We've stopped checking it for updates.

Site constraints 4

Nutrient neutrality catchment: River Mease SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 436 m away: Oaklands Farm Solar Park
The site is 436 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 22 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area133 m² (1,432 sq ft)
Energy ratingD (56 out of 100)
PropertyDetached bungalow, 6 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in April 2009, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
20 Oct 2026
Validated
20 Oct 2026
Parish
Tissington
Case officer
Show
Applicant
Show

Decision outlook

Day 10 of the 56-day target. Peak District usually decides agricultural works by day 36.

Day 1046 days to the 56-day target
75%decided within 8 weeks
89%approved
58decided in the last year

Plota live figures for agricultural works decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
20 Nov 2026
Statutory expiry
15 Dec 2026