School House,Unnamed Road From A53 To Brand Top Farm,Brandside, Data via plota.co.uk

NP/HPK/1026/1031 - Full Planning Permission REGISTERED: Under Consultation

Proposal

Remodelling and renovation of existing dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Oct 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Dec 2026, from Peak District's recent extensions.

Comments are open until 11 Nov 2026

Comment on this application ↗

Documents 14

All documents on the council site ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 611 m away: Triton Knoll Electrical System
The site is 611 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Grimsby to Walpole (at pre-application, the site is inside its boundary); Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
1 listed building within 150 m
Nearest: unnamed, 36 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Not affected
Not green belt · No scheduled monument at the site

Checked on 20 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £385,000 in January 2023. Other property, freehold.

12 January 2023£385,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
SK17 0SF
Received
19 Oct 2026
Validated
19 Oct 2026
Parish
Hartington Upper Quarter
Case officer
Show
Applicant
Show

Decision outlook

Day 9 of the 56-day target. Peak District usually decides extensions by day 52.

Day 947 days to the 56-day target
74%decided within 8 weeks
85%approved
181decided in the last year

Plota live figures for extensions decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
21 Oct 2026
Comments by
11 Nov 2026
Statutory expiry
14 Dec 2026