25/01224/MDC - Submission of details (Planning) Approved

Proposal

Submission of Mechanical Plant Noise Assessment Report pursuant to discharge of Conditions 2 and 3 of planning permission dated 30.07.2025. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2025
✓
Consultation
22 Sept 2025
✓
Approved
14 Oct 2025

Approved on 14 Oct 2025 · Delegated Decision · Last checked 16 Nov 2026

Associated applications 2

  • Part of

    Fullcouncil archive

    Conditions 2, 3 discharged

    • ConditionsSubmission of Mechanical Plant Noise Assessment Report pursuant to discharge of Conditions 2…This application25/01224/MDC

Site constraints 14

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 156 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument about 17 m away: Baynard's Castle, 78m south-west of St Benet Metropolitan Welsh Church
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Thames Path about 20 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Also on the record
3 listed buildings within 150 m of the postcode pin; Wider setting of protected view 1A.2 Alexandra Palace viewing terrace to St Paul's Cathedral; Flood defence about 24 m from the postcode pin (wall, designed for a 1 in 1000 year flood); Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 12 m away; Priority habitat about 26 m away: Mudflats.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Submission of details (Planning)
Postcode
EC4V 3AL
Received
4 Sept 2025
Validated
4 Sept 2025
Ward
Queenhithe
Case officer
Show
Target decision
30 Oct 2025
Decision
Approved
Decision date
14 Oct 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Faithorn Farrell Timms

How this decision compares

Decided in 40 days from validation, 34 days faster than City of London's median of 74 for discharge of conditions. Approved, as 100% of discharge of conditions here are.

38%decided within 8 weeks
100%approved
740decided in the last year

Plota live figures for discharge of conditions decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14263284
Planning Portal ref
PP-14263284
Consultation
22 Sept 2025
Comments by
6 Oct 2025
Committee
14 Oct 2025
Statutory expiry
30 Oct 2025
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 overall
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions: #1 of 296 on speed. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026