26/01583/FULL - Full Planning Permission Under Consideration

Proposal

Installation of two condenser units within an acoustic enclosure to be located behind the existing external wall of Warwick Lane west elevation at ground floor level. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
✓
Validated
19 Nov 2026
✓
Consultation
19 Nov 2026
Decision
Expected by 14 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 3 Feb 2027 and 15 Feb 2027, from City of London's recent utility and infrastructure works.

Comments are open until 3 Dec 2026

Comment on this application ↗

Site constraints 11

Protected view corridor: 1A.2 Alexandra Palace viewing terrace to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is. Also in the corridor of 2A.1 Parliament Hill summit to St Paul's Cathedral; 3A.1 Kenwood viewing gazebo to St Paul's Cathedral; 4A.1 Primrose Hill summit to St Paul's Cathedral. Also in the wider setting of 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral; 6A.1 Blackheath Point to St Paul's Cathedral.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 114 m away: Thames Tideway Tunnel
The site is 114 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 385 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument 111 m away: Stationers' Hall
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
21 listed buildings within 150 m
Nearest: Temple Bar, Grade I, 50 m away · 6 Grade I, 6 Grade II*, 8 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 21 with distances
Historic England ↗
Also on the record
Conservation area 37 m away: St Paul's Cathedral; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 13 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,490 m² (16,038 sq ft)
Energy ratingA (asset rating 22)
UseGeneral Assembly and Leisure, Night Clubs, and Theatres
HeatingMixed-mode with Mechanical Ventilation

From the energy performance certificate lodged in December 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
EC4M 7DX
Received
4 Nov 2026
Validated
19 Nov 2026
Ward
Bread Street
Case officer
Show
Target decision
14 Jan 2027
Decision level
Delegated
Applicant
Show
Agent
Rolfe Judd Planning

Decision outlook

Day 4 of the 56-day target. City of London usually decides utility and infrastructure works by day 83.

Day 479 days to the predicted decision (day 83)
26%decided within 8 weeks
100%approved
53decided in the last year

Plota live figures for utility and infrastructure works decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15344761
Planning Portal ref
PP-15344761
Consultation
19 Nov 2026
Comments by
3 Dec 2026
Statutory expiry
14 Jan 2027
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 overall
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions: #1 of 296 on speed. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.