Planning decisions in City Of London
How long City Of London takes to decide a planning application and how many it approves, from the 647 decisions it made in the twelve months to August 2026. Days run from validation to decision, the clock the council reports against; the wait from receipt is shown beside it. How the figures are made.
56 daysmedian from validation to decision (UK 52); 60 from receipt
53%decided within eight weeks (UK 73%), 79% within thirteen
over 99%approved (UK 89%): 612 approved, 1 refused, 18 withdrawn
291 of 322UK rank for speed; 3 of 322 for approvals
By kind of application
| Kind | Median days | Within 8 weeks | Approved | Decisions | UK rank |
|---|---|---|---|---|---|
| Discharge of conditions | 55 | 53% | 100% | 317 | 151 of 178 |
| Full applications | 76 | 32% | 100% | 78 | 277 of 298 |
| Listed building consent | 63 | 39% | 100% | 67 | 161 of 200 |
| Advertisement consent | 82 | 28% | 98% | 43 | 188 of 192 |
| Amendments | 40 | 68% | 100% | 40 | 143 of 271 |
| Other * | 22 | 94% | 100% | 19 | 23 of 40 |
Delegated or committee
| Route | Share | Median days | Approved | Decisions |
|---|---|---|---|---|
| Delegated to officers | 99% | 56 | over 99% | 625 |
| Planning committee | 1% | 124 | 100% | 4 |
Where the register states how the decision was made. 18 decisions did not say.
Appeals
7 appeals against City Of London decisions were decided by the Planning Inspectorate in the window, 700 for every 100 refusals; 57% were allowed. Every appeal in City Of London.
By year
| Year decided | Median days | Within 8 weeks | Approved | Decisions |
|---|---|---|---|---|
| 2026 so far | 60 | 48% | over 99% | 647 |
Past their target date now
- St Mary Abchurch House 123 - 127 Cannon Street London EC4N 5AUNon material amendments under section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission ref 24/00995/FULL (ddue 23 Feb 2026
- 1 Queen's Head Passage London EC4M 7DZInstallation of 1No. equipment housing cabinet and ancillary development theretodue 27 Feb 2026
- 42 - 43 Charterhouse Square London EC1M 6EWSubmission of (a) accommodate the location of the existing London Underground structures and tunnels and assess any structural impact due todue 2 Mar 2026
- 55 And 65 Old Broad Street London EC2M 1RXSubmission of the detailed design of all wind mitigation measures pursuant to condition 10 of planning permission 23/00469/FULEIA dated 19/1due 3 Mar 2026
- Land Bound By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane London EC3M 3JQSubmission of details of measures to prevent jumping or falling from the development pursuant to condition 58 of planning permission 25/0006due 3 Mar 2026
- Cripplegate House 1 Golden Lane London EC1Y 0RRSubmission of details of the provision to be made in the building's design to enable the discreet installation of street lighting on the devdue 11 Mar 2026
- 9 Bridewell Place London EC4V 6AWSubmission of (a) particulars and samples of the materials to be used on all external faces of the buildings including external ground and udue 16 Mar 2026
- 9 Bridewell Place London EC4V 6AWSubmission of an update to the approved detailed Whole Life-Cycle Carbon assessment pursuant to condition 10 of planning permission 22/01070due 16 Mar 2026
Decided in the last three weeks
- Millennium Bridge House 2 Lambeth Hill London EC4V 4AGSubmission of Discharge Report pursuant to discharge of condition 21 of planning permission 22/00970/FULMAJ dated 05.09.2024.Approved11 Sept 2026
- 55 And 65 Old Broad Street London EC2M 1RXSubmission of Drainage and SuDS Report pursuant to discharge of condition 18 of planning permission 23/00469/FULEIA dated 19.12.2024.Approved11 Sept 2026
- 1 - 3 St Paul's Churchyard London EC4M 8APNon-Material Amendment to planning permission ref.25/01124/FULL for amendments to Condition 22 (Approved Documents) to accommodate design chApproved11 Sept 2026
- 11 Leadenhall Street London EC3V 1LPAlterations at roof level including the installation of a fixed vertical ladder, abseil posts, safety line systems and a maintenance walkwayApproved11 Sept 2026
- Seal House 1 Swan Lane London EC4R 3TNNon-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) for amendments to Condition 43 (Approved DraApproved11 Sept 2026
- Site Bounded By King William Street, Cannon Street, Abchurch Lane & Nicholas Lane London EC4N 7DASubmission of Operation Management Plans pursuant to discharge of Conditions 47, 48 and 50 as per Non-Material Amendment 23/01379/NMA of plaApproved11 Sept 2026
- 15 Devonshire Square London EC2M 4YWSubmission of mitigation details pursuant to discharge of condition 4 (Noise from mechanical system) of planning permission 26/00213/FULL daApproved11 Sept 2026
- 45 Beech Street London EC2Y 8ADSubmission of details of (i) design and layout drawings for the proposed SuDS components (ii) measures to be taken to prevent flooding (iii)Approved11 Sept 2026
Built nightly from City Of London's planning register. Ranks are among the 322 published councils. See planning applications in City Of London, appeals, or get alerts for City Of London.
About these figures
How are decision times measured?
Days from the date the council validated the application to the date it decided it, for applications approved or refused in the window. That is the clock councils report against and the official statistics use. Each council’s page also shows the count from receipt, which is what the applicant actually waited. Withdrawn and undecided applications are not timed.
Why do these figures differ from the council’s own?
Councils count an agreed extension of time as decided on time; we treat the calendar as the calendar. Our figures are also live and rolling, where official statistics are quarterly and annual. So a council’s own within-eight-weeks figure will usually sit a little above ours.
What counts as approved?
Approval rate is approvals divided by approvals plus refusals. Withdrawals, and decisions whose outcome the register does not state, are counted in the totals but not in the rate.
Why is a council missing?
A council is published when it has at least 25 timed decisions in the window and its register’s decision data passes our consistency checks. Councils that fail are listed with the reason rather than shown with a number that would mislead.
How often is this updated?
Nightly, from the decisions we collect from every council register we monitor. The window is the twelve months to the last complete month.