139-143 Stoke Newington High Street, Hackney, London, N16 0PG Data via plota.co.uk

Proposal

Erection of roof extension to form new 2 bedroom flat at second floor, erection of single storey ground floor rear extension; new shopfront, and external alterations. Reduction of commercial floorspace at ground floor. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Dec 2021
✓
Validated
27 Apr 2022
✓
Approved
25 Aug 2026

Approved on 25 Aug 2026 · Delegated · Last checked 1 Oct 2026

Documents 27

All documents on the council site ↗

Site constraints 12

Grade II listed: The Rochester Castle Public House
List entry 1096116 · 12 m away · 3 more listed buildings within 150 m (3 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 3 with distances
Historic England ↗
Stoke Newington conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
3 Article 4 directions
Stoke Newington High Street District Town Centre · Stoke Newington District Centre · Whole of the London Borough of Hackney. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Hackney APA 2.10 Stoke Newington
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Stoke Newington
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Local nature reserve 204 m away: Abney Park Cemetery
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Registered park or garden 205 m away: Abney Park Cemetery; Inside the Hackney built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Designated open space 9 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Full Planning Permission
Postcode
N16 0PG
Received
23 Dec 2021
Validated
27 Apr 2022
Ward
Stoke Newington Ward
Case officer
Show
Target decision
28 Aug 2026
Decision
Granted - Extra Conditions
Decision date
25 Aug 2026
Decision level
Delegated
Agent
West Green Planning

How this decision compares

Decided in 1581 days from validation, 1511 days slower than Hackney's median of 70 for changes of use. Approved, as 66% of changes of use here are.

44%decided within 8 weeks
66%approved
142decided in the last year

Plota live figures for changes of use decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
28 Aug 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 overall
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications: #220 of 296 on speed. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026