68 East Street Coggeshall Essex CO6 1SL Data via plota.co.uk

Pending 26/02232/TPOCON
Date received
29 Sept 2026
Date validated
29 Sept 2026
Postcode
CO6 1SL

Description

Notice of intent to carry out works to trees in a Conservation Area: T1 -1 x Ginkjo biloba - Reduction in height by 3m T2-1 x Liquidambar Styraciflua (Sweet Gem) -Reduction in height by 3m Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 5 Nov 2026, from Braintree's recent tree and landscaping works.

Day 10 of the 56-day target. Braintree usually decides tree and landscaping works by day 37.

Day 1046 days to the 56-day target
100%decided within 8 weeks
94%approved
55decided in the last year

Plota live figures for tree and landscaping works decided by Braintree in the last twelve months, from validation. Braintree decision record →

Site constraints 8

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Public footpath about 22 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Conservation area about 18 m away: Coggeshall
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project about 975 m away: Norwich to Tilbury
The site is about 975 m from the project boundary. Electricity line, examination closed, recommendation due.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
2 listed buildings within 150 m of the postcode pin; Scheduled monument about 220 m away: Coggeshall Abbey; Inside the Coggeshall built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £1,250,000 in January 2017. Detached house, freehold.

12 January 2017£1,250,000
2 August 1996£325,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Braintree - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Braintree
Planning Authority Score
7/10
Good
#61 of 296 councils
Relevant to this application:
Householder decisions

Braintree is faster than most councils at deciding householder applications, ranking #47 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Braintree decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #189 of 296
92%
Householder approved
Above avg (90%) #148 of 296
78%
Decided in 8 weeks
Above avg (63%) #47 of 296
33%
Extended time limit
Below avg (41%) #71 of 296
62%
Minor dwellings approved
119 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
91%
Change of use approved
11 decided
927
Total decisions
132 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.