Laurels Farm Low Road Forncett St Peter Norfolk NR16 1JF Data via plota.co.uk

2025/2667 - Works to trees in Conservation Area Approved

Proposal

Ash tree - pollard to a height of 4m and remove deadwood Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Aug 2025
✓
Validated
1 Sept 2025
✓
Approved
24 Sept 2025

Approved on 24 Sept 2025 · Delegated · Last checked 12 Oct 2026

Site constraints 10

Grade II listed: Sunny Acres
List entry 1050379 · 1 m away · 2 more listed buildings within 150 m (2 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
Historic England ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Forncett St Peter Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 887 m away: Norwich to Tilbury
The site is 887 m from the project boundary. Electricity line, examination closed, recommendation due.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Forncett St Peter built-up area; Priority habitat 30 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area149 m² (1,604 sq ft)
Energy ratingG (17 out of 100), could reach A
PropertyDetached house, 6 habitable rooms
BuiltBefore 1900
HeatingElectric storage heaters
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in October 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to trees in Conservation Area
Postcode
NR16 1JF
Received
27 Aug 2025
Validated
1 Sept 2025
Ward
Forncett
Parish
Forncett
Case officer
Show
Target decision
13 Oct 2025
Decision
No objections
Decision date
24 Sept 2025
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 23 days from validation, about the council's usual 24 days. Approved, as 98% of tree and landscaping works here are.

99%decided within 8 weeks
98%approved
799decided in the last year

Plota live figures for tree and landscaping works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14284675
Planning Portal ref
PP-14284675
Statutory expiry
13 Oct 2025
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 overall
Relevant to this application:
Other decisions

South Norfolk Broadland is #136 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.