Stonecutter Court 1 Stonecutter Street London EC4A 4TR Data via plota.co.uk

25/00070/NMA - Non-material Amendments Approved

Proposal

Application submitted under Section 96a of the Town and Country Planning Act (as amended) for a non-material amendment to planning permission ref. to vary the wording of Condition 36 (Loading area) to read - A clear unobstructed minimum headroom of 4.45m (rather than 4.5m as per approved wording) must be maintained for the life of the building in the refuse skip loading area as shown on the approved drawings. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jan 2025
✓
Consultation
13 Feb 2025
✓
Approved
18 Feb 2025

Approved on 18 Feb 2025 · Delegated Decision · Last checked 22 Nov 2026

Associated applications 6

Site constraints 10

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 158 m away: Thames Tideway Tunnel
The site is 158 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 500 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
7 listed buildings within 150 m
Nearest: Hoop and Grapes Public House, Grade II, 47 m away · 1 Grade II*, 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Also on the record
Wider setting of protected view 4A.1 Primrose Hill summit to St Paul's Cathedral; 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral; 6A.1 Blackheath Point to St Paul's Cathedral; Conservation area 83 m away: Fleet Street; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 25 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area29,576 m² (318,353 sq ft)
Energy ratingA (asset rating 18)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in May 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material Amendments
Postcode
EC4A 4TR
Received
22 Jan 2025
Validated
22 Jan 2025
Ward
Farringdon Within
Target decision
19 Feb 2025
Decision
Approved
Decision date
18 Feb 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Montagu Evans LLP

How this decision compares

Decided in 27 days from validation, 45 days faster than City of London's median of 72 for amendments. Approved, as 100% of amendments here are.

45%decided within 8 weeks
100%approved
91decided in the last year

Plota live figures for amendments decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13707847
Planning Portal ref
PP-13707847
Consultation
13 Feb 2025
Comments by
27 Feb 2025
Committee
18 Feb 2025
Statutory expiry
19 Feb 2025
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 overall
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions: #1 of 296 on speed. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.