3 Semple Street Edinburgh EH3 8BL Data via plota.co.uk

26/03164/CLP - Certificate of Lawfulness (proposed) Approved

Proposal

A new VRF enclosure will be formed within the basement car park, with associated refrigerant pipework distributed from the basement to Level 04. The pipework will rise via the existing lightwell to Level 00, continue externally along the existing retaining wall and trench within a new mesh enclosure replacing the existing timber-clad enclosure, then enter the building low level through the existing louvred plant space at Level 00 before being distributed internally to the upper floors. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Jul 2026
✓
Validated
4 Aug 2026
✓
Approved
28 Aug 2026

Approved on 28 Aug 2026 · Delegated Decision · Last checked 29 Aug 2026

Site constraints 5

Grade C listed: 4, 5, 8 Chalmer's Buildings, 88 Fountainbridge, Edinburgh
List entry LB44932 · 30 m away · 6 more listed buildings within 150 m (1 Grade A, 5 Grade B)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 6 with distances
Historic Environment Scotland ↗
Also on the record
Scheduled monument 175 m away: Union Canal, Fountainbridge to River Almond; Radon affected area, class 3; World heritage site 176 m away: Edinburgh World Heritage Site Boundary; Conservation area 74 m away: West End.
Not affected
Outside flood zones 2 and 3

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Edinburgh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Edinburgh
Application type
Certificate of Lawfulness (proposed)
Postcode
EH3 8BL
Received
31 Jul 2026
Validated
4 Aug 2026
Ward
City Centre
Parish
Tollcross
Case officer
Show
Target decision
3 Oct 2026
Decision
Granted
Decision date
28 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Michael Laird Architects.

How this decision compares

Decided in 24 days from validation, about the council's usual 25 days. Approved, as 97% of utility and infrastructure works here are.

75%decided within 8 weeks
97%approved
187decided in the last year

Plota live figures for utility and infrastructure works decided by Edinburgh in the last twelve months, from validation. Edinburgh decision record →

Public comments

No public comments yet.

Last counted 29 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
25 Aug 2026
Statutory expiry
3 Oct 2026
Env. assessment
No