Offices The Vicarage 5 - 7 St Andrew Street London EC4A 3AF Data via plota.co.uk

26/01597/FULL - Full Planning Permission Under Consideration

Proposal

Change of use of part of the north-western area of the churchyard (Class F1/sui generis to class E). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
✓
Consultation
11 Nov 2026
Decision
Expected by 31 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 31 Dec 2026 and 15 Jan 2027, from City of London's recent commercial premises.

Comments are open until 16 Dec 2026

Comment on this application ↗

Site constraints 12

11 listed buildings within 150 m of the postcode pin
Nearest: Lodge St Andrew's Court House Vicarage Wall and Gatepiers to Garden of Number 7 (St Andrew's Court House) and Vicarage, Grade II, the postcode pin is inside its outline · 1 Grade I, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 11 with distances
Historic England ↗
Protected view corridor: 4A.1 Primrose Hill summit to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is. Also in the wider setting of 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral; 6A.1 Blackheath Point to St Paul's Cathedral.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 331 m away: Thames Tideway Tunnel
The site is about 331 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 694 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Scheduled monument about 193 m away: Barnard's Inn Hall (Mercers' School); Conservation area about 82 m away: Hatton Garden; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 2 m away; Town centre about 96 m away: New Oxford Street.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 12 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
EC4A 3AF
Received
5 Nov 2026
Validated
5 Nov 2026
Ward
Farringdon Without
Case officer
Show
Target decision
31 Dec 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 18 of the 56-day target. City of London usually decides commercial premises by day 63.

Day 1845 days to the predicted decision (day 63)
43%decided within 8 weeks
100%approved
140decided in the last year

Plota live figures for commercial premises decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15348462
Planning Portal ref
PP-15348462
Neighbours
18 Nov 2026
Consultation
11 Nov 2026
Comments by
16 Dec 2026
Site or press notice
13 Nov 2026
Statutory expiry
31 Dec 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 overall
Relevant to this application:
Change of use

City of London is one of the fastest councils in England for householder decisions: #1 of 296 on speed. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026