260 High Street Stratford London E15 2JA Data via plota.co.uk

25/02323/ADV - Advertisement Consent Approved

Proposal

Display of 1no. internally illuminated fascia sign and 1no. internally illuminate sign to the Southwest third floor facade. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 6 Nov 2025
✓
Approved
15 Jan 2026

Approved on 15 Jan 2026 · Delegated decision · Last checked 9 Oct 2026

Site constraints 8

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers and the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 340 m away: Thames Tideway Tunnel
The site is 340 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
1 listed building within 150 m
Nearest: The Log Cabin, Formerly the Yorkshire Grey, Grade II, 59 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Inside the Newham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,494 m² (26,845 sq ft)
Energy ratingB (asset rating 31)
UseD1 Non-residential Institutions - Education
HeatingAir Conditioning

From the energy performance certificate lodged in December 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Advertisement Consent
Postcode
E15 2JA
Received
around 6 Nov 2025
Validated
6 Nov 2025
Ward
Stratford
Parish
Stratford Community Forum
Case officer
Show
Decision
Approve
Decision date
15 Jan 2026
Decision level
Delegated decision
Applicant
Show
Agent
D2 Planning Limited

How this decision compares

Decided in 70 days from validation, 15 days slower than Newham's median of 55 for signs and adverts. Approved, as 90% of signs and adverts here are.

73%decided within 8 weeks
90%approved
108decided in the last year

Plota live figures for signs and adverts decided by Newham in the last twelve months, from validation. Newham decision record →

Public comments

No public comments yet.

Last counted 9 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Other decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.