John F Kennedy Academy Stratford Campus Pitchford Street Stratford London E15 4RZ Data via plota.co.uk

26/02248/FUL - Full Planning Permission Pending

Proposal

Demolition of the existing temporary classroom building and link corridor; construction of two single-storey buildings to provide 6 classrooms and associated ancillary accommodation; enlargement and refurbishment of the existing hydrotherapy pool and associated facilities; creation of external play areas, landscaping and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 11 Nov 2026
Decision
Expected by 6 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 5 Jan 2027, from Newham's recent demolitions.

Documents 41

Plans & drawings 33

PDF 1004_PL1 EXISTING TEMPORARY CLASSROOM GF PLAN Drawing · 22 Oct 2026 View ↗ PDF 0101_PL1 BUILDING B VISUALISTION Drawing · 22 Oct 2026 View ↗ PDF 1003_PL1 EXISTING HYDROTHERAPY POOL GF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1001_PL1 EXISTING GF SITE PLAN Drawing · 22 Oct 2026 View ↗ PDF 0501_PL1 SITE LOCATION PLAN Drawing · 22 Oct 2026 View ↗ PDF 1002_PL1 EXISTING LINK CORRIDOR PLAN Drawing · 22 Oct 2026 View ↗ PDF 0100_PL1 BUILDING A VISUALISTION Drawing · 22 Oct 2026 View ↗ PDF 1412_PL1 PROPOSED BUILDING B SOUTH & NORTH ELEVATION Drawing · 22 Oct 2026 View ↗ PDF 1402_PL1 PROPOSED BUILDING A NORTH & SOUTH ELEVATION OPTION 2 Drawing · 22 Oct 2026 View ↗ PDF 1411_PL1 PROPOSED BUILDING B EAST & WEST ELEVATION Drawing · 22 Oct 2026 View ↗ PDF 1420_PL1 PROPOSED HYDROTHERAPY POOL NORTH ELEVATION Drawing · 22 Oct 2026 View ↗ PDF 1401_PL1 PROPOSED BUILDING A EAST & WEST ELEVATION Drawing · 22 Oct 2026 View ↗ PDF 1421_PL1 PROPOSED HYDROTHERAPY POOL WEST ELEVATION Drawing · 22 Oct 2026 View ↗ PDF 1302_PL1 PROPOSED BUILDING A SECTIONS AA Drawing · 22 Oct 2026 View ↗ PDF 1320_PL1 PROPOSED SCHOOL SECTIONS AA Drawing · 22 Oct 2026 View ↗ PDF 1311_PL1 PROPOSED BUILDING B SECTIONS A&B Drawing · 22 Oct 2026 View ↗ PDF 1301_PL1 PROPOSED BUILDING A SECTIONS A&B Drawing · 22 Oct 2026 View ↗ PDF 1321_PL1 PROPOSED SCHOOL SECTIONS AA Drawing · 22 Oct 2026 View ↗ PDF 1213_PL1 PROPOSED HYDROTHERAPY POOL ROOF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1211_PL1 PROPOSED SITE WIDE ROOF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1212_PL1 PROPOSED BUILDING A ROOF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1204_PL1 PROPOSED BUILDING B GF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1203_PL1 PROPOSED HYDROTHERAPY POOL GF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1202_PL1 PROPOSED BUILDING A GF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1214_PL1 PROPOSED BUILDING B ROOF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1040_PL1 EXISTING SCHOOL SOUTH ELEVATIONS Drawing · 22 Oct 2026 View ↗ PDF 1041_PL1 EXISTING SCHOOL SOUTH ELEVATIONS Drawing · 22 Oct 2026 View ↗ PDF 1013_PL1 EXISTING HYDEROTHERAPY POOL ROOF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1011_PL1 EXISTING SITE WIDE ROOF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1012_PL1 EXISTING LINK CORRIDOR ROOF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1030_PL1 EXISTING SITE WIDE SECTIONS Drawing · 22 Oct 2026 View ↗ PDF 1014_PL1 EXISTING TEMPORARY CLASSROOMS ROOF PLAN Drawing · 22 Oct 2026 View ↗ PDF 1201_PL1 PROPOSED GF SITE PLAN Drawing · 22 Oct 2026 View ↗

All documents on the council site ↗

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 414 m away: Thames Tideway Tunnel
The site is 414 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Newham built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Designated open space 19 m away.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Full Planning Permission
Postcode
E15 4RZ
Received
around 11 Nov 2026
Validated
11 Nov 2026
Ward
Stratford
Parish
Stratford Community Forum
Case officer
Show
Applicant
Show
Agent
Rivington Street Studio

Decision outlook

Day 7 of the 56-day target. Newham usually decides demolitions by day 55.

Day 749 days to the 56-day target
76%decided within 8 weeks
65%approved
52decided in the last year

Plota live figures for demolitions decided by Newham in the last twelve months, from validation. Newham decision record →

Public comments

No public comments yet.

Last counted 12 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Householder decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use