221 High Street Stratford London E15 2AE Data via plota.co.uk

26/01760/AOD - Approval of Details Approved

Proposal

Approval of details pursuant to Condition 5 (Parking Management Plan) and Condition 6 (Revised Parking Plan) attached to Planning Consent dated 14th July 2026. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Aug 2026
✓
Approved
15 Sept 2026

Approved on 15 Sept 2026 · Approval of Details · Last checked 20 Sept 2026

Associated applications 2

  • Part of

    Fullcouncil archive

    Conditions 5, 6 discharged

    • ConditionsApproval of details pursuant to Condition 5 (Parking Management Plan) and Condition 6 (Revised…This application26/01760/AOD

Site constraints 9

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Inside the Newham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Metropolitan Open Land 77 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Approval of Details
Postcode
E15 2AE
Received
10 Aug 2026
Validated
10 Aug 2026
Ward
Stratford
Parish
Stratford Community Forum
Case officer
Show
Decision
Approve
Decision date
15 Sept 2026
Decision level
Approval of Details
Applicant
Show
Agent
West Green Planning Limited

Public comments

No public comments yet.

Last counted 20 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Householder decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026