Solar and renewables in York

York received 38 renewable energy applications in the last 12 months, including 2 solar farms, 1 battery storage site and 3 heat pumps. Of the 21 decided so far, 17 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for York

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 14 of 14 applications
17 Nov 2026 Awaiting decision 26/02025/FUL

22 Mount Vale Drive York YO24 1DN

Installation of a freestanding, ground-mounted 16no. panel solar PV array and associated lockable equipment enclosure within the rear garden

Full Application
3 Nov 2026 Awaiting decision 26/01813/FUL

National Railway Museum Leeman Road York YO26 4XD

Installation of solar array and refurbishment of the existing roof including redecoration of the external steelwork, cladding panels, fascias, soffits...

Full Application
26 Oct 2026 Awaiting decision 26/01908/SOLAR

Flat B205 Management Suite Block B Frederick House Fulford Road York YO10 4FW

Installation of 316no. roof mounted solar panels with a total installed capacity of 145.36kWp under the Town and Country Planning (General Permitted D...

Solar Panels prior notification
22 Oct 2026 Awaiting decision 26/01896/FUL

121 Stockton Lane York YO31 1JA

Two-storey side and rear extensions, raise ridge height, 5no rooflights and solar panels to front roofslope and 2no. dormers to rear roofslope

Full Application
20 Oct 2026 Awaiting decision 26/01819/FUL

6 Toremill Close New Earswick York YO32 4DP

Installation of solar panels to east and west facing roof slopes

Full Application
13 Oct 2026 Awaiting decision 26/01821/FULM

B&Q Osbaldwick Link Road Osbaldwick York YO10 3JA

Alteration (including demolition), sub division, extension and refurbishment (including repainting of facade), to the B and Q unit to create an additi...

Major Full Application
8 Oct 2026 Awaiting decision 26/01651/FUL

The IT Centre Innovation Way Heslington York YO10 5NP

Change of use office space (use class E) to a higher education teaching and research facility (use class F.1), external alterations including the inst...

Full Application
5 Oct 2026 Awaiting decision 26/01774/FUL

1 Stakers Orchard Church Street Copmanthorpe York YO23 3WA

Installation of 9no. solar panels to front roof slope

Full Application
1 Oct 2026 Awaiting decision 26/01776/FUL

87 Station Road Upper Poppleton York YO26 6PZ

Two storey side and rear extension, single storey side/rear extension, repositioning existing first floor rear window and solar panels to rear

Full Application
30 Sept 2026 Awaiting decision 26/01694/SOLAR

Block C Chemistry Department Alcuin Way Heslington York YO10 5NB

Installation of 386no. roof mounted solar panels with a total installed capacity of 174kWp under the Town and Country Planning (General Permitted Deve...

Solar Panels prior notification
29 Sept 2026 Approved 19 Nov 26/01624/FUL

1 Holburns Croft Heslington York YO10 5DP

Installation of solar panels to rear roofslope

Full Application
10 Sept 2026 Awaiting decision 26/01633/FUL

15 Heslington Lane York YO10 4HN

Single storey side and rear extensions, front and rear dormers, porch, solar panels to south elevation and erection of a detached garage to side

Full Application
28 Aug 2026 Decided 7 Oct 26/01590/EIASN

Land Comprising Field South Of Broad Lane Nether Poppleton York

Screening opinion in respect of a proposed 57MW solar PV development

Screening Opinion
27 Aug 2026 Refused 22 Oct 26/01576/FUL

22 Greencliffe Drive York YO30 6NA

Two storey side and rear extension, single storey side extension, raising of roof height, installation of solar panels and rooflights

Full Application
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in York

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in York?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by York. You can also narrow the alert to a postcode, street, or drawn area.

We check York's planning portal daily. New solar & renewables applications appear here within a day of being published.