Solar and renewables in York

York received 30 renewable energy applications in the last 12 months, including 2 solar farms, 1 battery storage site and 3 heat pumps. Of the 17 decided so far, 14 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

12
|
4
|
3
Get alerts for York

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
1 Oct 2026 Awaiting decision 26/01776/FUL

87 Station Road Upper Poppleton York YO26 6PZ

Two storey side and rear extension, single storey side/rear extension, repositioning existing first floor rear window and solar panels to rear

Full Application York
30 Sept 2026 Awaiting decision 26/01694/SOLAR

Block C Chemistry Department Alcuin Way Heslington York YO10 5NB

Installation of 386no. roof mounted solar panels with a total installed capacity of 174kWp under the Town and Country Planning (General Permitted Deve...

Solar Panels prior notification York
29 Sept 2026 Awaiting decision 26/01624/FUL

1 Holburns Croft Heslington York YO10 5DP

Installation of solar panels to front and rear roofslopes

Full Application York
10 Sept 2026 Awaiting decision 26/01633/FUL

15 Heslington Lane York YO10 4HN

Single storey side and rear extensions, front and rear dormers, porch, solar panels to south elevation and erection of a detached garage to side

Full Application York
28 Aug 2026 Awaiting decision 26/01590/EIASN

Land Comprising Field South Of Broad Lane Nether Poppleton York

Screening opinion in respect of a proposed 57MW solar PV development

Screening Opinion York
27 Aug 2026 Awaiting decision 26/01576/FUL

22 Greencliffe Drive York YO30 6NA

Two storey side and rear extension, single storey side extension, raising of roof height, installation of solar panels and rooflights

Full Application York
20 Aug 2026 Awaiting decision 26/01534/FUL

17 Finsbury Avenue York YO23 1LW

Single storey side and rear extension, alterations to detached garage, raised patio and air source heat pump to side

Full Application York
21 Jul 2026 Awaiting decision 26/01341/FUL

6 Leyfield Close Strensall York YO32 5XE

Installation of air source heat pump to side

Full Application York
20 Jul 2026 Awaiting decision 26/01333/FUL

Dunelm Black Dykes Lane Upper Poppleton York YO26 6PT

Two and single storey front extensions, two storey side extension, single storey rear extension, installation of solar panels and conversion of detach...

Full Application York
14 Jul 2026 Approved 3 Sep 26/01252/FUL

The Old School Medical Practice Horseman Lane Copmanthorpe York YO23 3UA

Installation of solar panels to rear roof

Full Application York
7 Jul 2026 Awaiting decision 26/01243/LBC

11 Acomb Road York YO24 4EN

Internal and external works to include a single storey rear and side extensions, solar panels to rear roofslopes, replacement of windows, doors, roof ...

Listed Building Consent York
7 Jul 2026 Awaiting decision 26/01242/FUL

11 Acomb Road York YO24 4EN

Single storey rear and side extensions, solar panels to rear roofslopes, replacement windows and doors, and alterations to boundary treatment - part r...

Full Application York
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in York

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in York?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by York. You can also narrow the alert to a postcode, street, or drawn area.

We check York's planning portal daily. New solar & renewables applications appear here within a day of being published.