Solar and renewables in Doncaster

Doncaster received 33 renewable energy applications in the last 12 months, including 3 solar farms, 2 battery storage sites and 3 heat pumps. All 22 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Doncaster

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
22 Sept 2026 Awaiting decision 26/01325/FUL

Amenity Grass Area Lilac Crescent Edlington Doncaster DN12 1NH

Formation of a temporary site compound for carrying out external works to St Leger properties in Edlington, comprising of office, welfare unit, toilet...

Full Application Doncaster
21 Sept 2026 Awaiting decision 26/01586/FULM

Former Owston View Care Home Site Lodge Road Carcroft Doncaster DN6 8QA

Erection of care home (without compliance with conditions 2 (Approved Plans), 4 (Arboricultural Method Statement), 5 (Landscaping) and 6 (Monitoring o...

Planning FULL Major Doncaster
5 Sept 2026 Awaiting decision 26/01682/FUL

The Hayfield School Hurst Lane Auckley Doncaster DN9 3HG

Installation of Air source heat pumps for new heating system

Full Application Doncaster
2 Sept 2026 Awaiting decision 26/01667/FUL

Hill House High Street Campsall Doncaster DN6 9AF

Erection of a two storey pitched roof extension with balcony to the rear. Erection of a two storey flat roof extension with parapet to the rear. Erect...

Full Application Doncaster
1 Sept 2026 Approved 30 Sep 26/01657/FUL

Daneville Church Street Mexborough S64 0HF

Installation of air source heat pump

Full Application Doncaster
28 Aug 2026 Approved 22 Oct 26/01650/FUL

7 Birchwood Court Bessacarr Doncaster DN4 6TA

Installation of Solar Panels (RETROSPECTIVE)

Full Application Doncaster
20 Aug 2026 Withdrawn 14 Oct 26/01625/CPL

51 Ash Dale Road Warmsworth Doncaster DN4 9NG

Certificate of proposed lawful development for Installation of two air source heat pumps at ground level to the side of the existing detached bungalow

Certificate Proposed Lawful Use/Dev Doncaster
14 Aug 2026 Awaiting decision 26/01558/FUL

Land To The South Of Green Lane Scawthorpe Doncaster DN5 7UP

Construction and operation of a micro energy storage project

Full Application Doncaster
11 Aug 2026 Awaiting decision 26/01503/FUL

Eco Power Stadium Stadium Way Doncaster DN4 5JW

Installation of a small scale battery energy storage system ('BESS') to include solar inverters which are to be situated in the service area of this s...

Full Application Doncaster
10 Aug 2026 Approved 9 Oct 26/01509/PRIOR

Mount Pleasant Hotel Great North Road Rossington Doncaster DN11 0HW

Notification to determine if prior approval is required for the proposed installation of Solar Panels to 7 areas of flat roof on the existing building

Prior Approval Doncaster
6 Aug 2026 Approved 22 Sep 26/01488/PRIOR

Eco Power Stadium Stadium Way Lakeside Doncaster DN4 5JW

Notification to determine if prior approval is required for the installation of Solar PV system on roof tops

Prior Approval Doncaster
4 Aug 2026 Approved 5 Oct 26/01462/FUL

Meadow Cottage 89 Sunderland Street Tickhill Doncaster DN11 9QH

Erection of first floor rear extension, replacement of single storey roof, replacement of main roof including garage roof, single storey rear extensio...

Full Application Doncaster
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Doncaster

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Doncaster?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Doncaster. You can also narrow the alert to a postcode, street, or drawn area.