Solar and renewables in Harrogate

Harrogate received 37 renewable energy applications in the last 12 months, including 1 solar farm, 1 battery storage site and 8 heat pumps. Of the 16 decided so far, 15 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

10
|
0
|
0
Get alerts for Harrogate

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 10 of 10 applications
26/04187/DISCON 22 Jul 2026 Registered

Plantation House Ripon Road Harrogate North Yorkshire HG1 2BS

Approval of details under Condition 8 (Artificial Lighting) of planning permission 26/01386/FUL Change of use from storage, sale and distribution of m...

Discharge of Conditions Harrogate 22 Jul 2026
26/03370/FUL 6 Jul 2026 Registered

26 Leadhall Drive Harrogate North Yorkshire HG2 9NL

Single storey front elevation extension, single storey rear extension with solar panels, loft conversion including rear dormer extension with front an...

Harrogate 6 Jul 2026
26/01622/FUL 4 Jul 2026 Awaiting decision

Tinkers Hollow Church Field Lane Great Ouseburn North Yorkshire YO26 9SG

Addition of 14 solar panels. These to be mounted on the South West pitched roof elevation.

Full permission Harrogate 4 Jul 2026
26/02972/FUL 2 Jul 2026 Awaiting decision

Spring Garth High Street Hampsthwaite North Yorkshire HG3 2EZ

Erection of a single-storey open-sided timber-framed pergola to the rear of the property, incorporating nine roof-mounted solar photovoltaic panels, w...

Harrogate 2 Jul 2026
26/03219/FUL 24 Jun 2026 Registered

Park House Park Square Masham North Yorkshire HG4 4HF

Studio extension with provision of 24no. solar panels to existing workshops

Full permission Harrogate 24 Jun 2026
26/03213/FUL 17 Jun 2026 Approved

North Close Farm Ripon Road To North Close Farm Kirkby Malzeard North Yorkshire HG4 3QE

Erection of Biomass Boilerhouse.

Full permission Harrogate 17 Jun 2026
26/03205/PPV 17 Jun 2026 Decided

Prospect House Farm Long Lane Felliscliffe North Yorkshire HG3 2LU

Addition of 14 PV solar panels to the roof of an existing agricultural storage building.

Prior Notif Solar Equip on non-domestic Harrogate 17 Jun 2026
26/01606/FUL 16 Jun 2026 Approved

Frazer Theatre High Street Knaresborough North Yorkshire HG5 0EQ

Removal of skylight in main auditorium roof and fill-in to match existing roof material. Replacement of 3 single-glazed windows on main elevation with...

Full permission Harrogate 16 Jun 2026
26/02194/FUL 12 Jun 2026 Registered

Football Ground Wetherby Road Kirk Deighton North Yorkshire LS22 4DS

Material change of use from football clubhouse, changing rooms, playing field and carpark (use class F.2 local community) to dual use of place of wors...

Full permission Harrogate 12 Jun 2026
26/02467/FUL 26 May 2026 Approved

4 Finkle Street Ripon North Yorkshire HG4 1LA

Proposed alterations to existing dental surgery including alterations to fenestration, addition of disabled access ramp, formation of accessible parki...

Full permission Harrogate 26 May 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Harrogate

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Harrogate?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Harrogate. You can also narrow the alert to a postcode, street, or drawn area.

We check Harrogate's planning portal daily. New solar & renewables applications appear here within a day of being published.