Solar and renewables in Wakefield

Wakefield received 35 renewable energy applications in the last 12 months, including 2 battery storage sites and 11 heat pumps. Of the 23 decided so far, 21 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

13
|
7
|
3
Get alerts for Wakefield

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 13 of 13 applications
5 Oct 2026 Awaiting decision 26/01782/FUL

19 Longdale Drive South Elmsall Pontefract WF9 2AZ

Installation of an Air Source Heat Pump

Full Application Wakefield
5 Oct 2026 Awaiting decision 26/01759/SPN

Verder Ltd Unit 3, California Drive Freeway Park Castleford WF10 5QH

Installation of a 133.22kW Solar PV system on two roofs on the building

Solar Power Notification Wakefield
29 Sept 2026 Awaiting decision 26/01737/FUL

2 Ackworth House Close Ackworth Pontefract WF7 7NX

Adding solar panels to an existing south facing roof in a conservation area

Full Application Wakefield
23 Sept 2026 Awaiting decision 26/01713/FUL

9 Guinevere Drive South Elmsall Pontefract West Yorkshire WF9 2WB

Installation of air source heat pump to rear (east) elevation of dwelling

Full Application Wakefield
9 Sept 2026 Awaiting decision 26/01517/FUL

Storage Warehouse Tereos Uk And Ireland Limited Ripley Drive Normanton WF6 1RY

Proposed construction, operation and decommissioning of a Battery Energy Storage System (BESS) facility and associated infrastructure in association w...

Full Application Wakefield
8 Sept 2026 Awaiting decision 26/01570/FUL

Wenthill Farmhouse Great North Road Wentbridge Pontefract WF8 3JJ

Removal of the existing oil-fired boiler and associated external oil storage and to install a modern low-carbon heating and cooling system comprising ...

Full Application Wakefield
8 Sept 2026 Awaiting decision 26/01571/LBC

Wenthill Farmhouse Great North Road Wentbridge Pontefract WF8 3JJ

Removal of the existing oil-fired boiler and associated external oil storage and to install a modern low-carbon heating and cooling system comprising ...

Listed Building Consent Wakefield
4 Sept 2026 Awaiting decision 26/01609/SPN

Evo Group Express Way Wakefield Europort Normanton WF6 2TZ

PV solar installation

Solar Power Notification Wakefield
25 Aug 2026 Approved 1 Oct 26/01409/CPE

Unit 2 Plp Wakefield The Willfred Ossett Wakefield WF5 9EE

The solar PV system was installed by a previous owner approximately five years ago and has remained in continuous use since installation. The current ...

Certificate Existing Lawful Use or Dev Wakefield
25 Aug 2026 Approved 1 Oct 26/01456/CPE

Unit 1 Plp Wakefield The Willfred Ossett WF5 9EE

The solar PV system was installed by a previous owner approximately five years ago and has remained in continuous use since installation. The current ...

Certificate Existing Lawful Use or Dev Wakefield
17 Aug 2026 Approved 6 Oct 26/01471/SPN

Unit F Rosie Road Normanton WF6 1ZB

PV solar installation

Solar Power Notification Wakefield
10 Aug 2026 Awaiting decision 26/01267/CPL

Connaught House Hillcrest Mount Castleford WF10 3QU

Internal building refurbishment works including stripping out, new partitions, infilling existing openings, door replacements, flooring replacements, ...

Certificate Proposed Lawful Use or Dev Wakefield
13 Jul 2026 Approved 7 Sep 26/01053/SPN

Tereos Uk And Ireland Limited Ripley Drive Normanton WF6 1RY

PV Solar Installation

Solar Power Notification Wakefield
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Wakefield

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Wakefield?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Wakefield. You can also narrow the alert to a postcode, street, or drawn area.

We check Wakefield's planning portal daily. New solar & renewables applications appear here within a day of being published.