Solar and renewables in Sheffield

Sheffield received 29 renewable energy applications in the last 12 months, including 1 battery storage site and 5 heat pumps. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

16
|
3
|
1

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 16 of 16 applications
26/02165/FUL 20 Jul 2026 Pending

8 Osborne Close Sheffield S11 9BE

Demolition of existing detached garage, erection of replacement garage, two-storey side extension, single-storey rear extension, installation of solar...

Sheffield 20 Jul 2026
26/01969/FUL 2 Jul 2026 Awaiting decision

53 Dunkeld Road Sheffield S11 9HN

Erection of a two-storey side extension including formation of gable end, alterations to the external appearance of the property, installation of sola...

Sheffield 2 Jul 2026
26/01831/PVPN 18 Jun 2026 Awaiting decision

Mayflower Works Darnall Road Sheffield S9 5AB

Installation of roof mounted solar panels

Solar/PV panel Prior Notification Sheffield 18 Jun 2026
26/01801/FUL 16 Jun 2026 Awaiting decision

34 Canterbury Crescent Sheffield S10 3RX

Alterations and extensions to roof including raised ridge height, installation of solar panels, erection of first floor front extension, external wall...

Full Planning Application Sheffield 16 Jun 2026
26/01720/FUL 10 Jun 2026 Awaiting decision

40 Sunningdale Mount Sheffield S11 9HA

Alterations to roof including hip to gable extensions to both sides, erection of dormer extensions to rear with solar panels above, and dormer extensi...

Full Planning Application Sheffield 10 Jun 2026
26/01716/FUL 9 Jun 2026 Awaiting decision

54 Stocks Hill Sheffield S35 9YT

Installation of roof mounted solar panels to front and rear of dwellinghouse

Full Planning Application Sheffield 9 Jun 2026
26/01652/FUL 3 Jun 2026 Awaiting decision

65 Slayleigh Lane Sheffield S10 3RG

Erection of a single-storey rear extension, two-storey front extension, replacement of windows, installation of heat pump and enlargement of dropped k...

Full Planning Application Sheffield 3 Jun 2026
26/01639/FUL 2 Jun 2026 Awaiting decision

Rose Garden Cafe Graves Park Hemsworth Road Sheffield S8 8LL

Erection of single storey side extension, re-building of the front elevation and re-roofing of the building, installation of new windows and doors, co...

Full Planning Application Sheffield 2 Jun 2026
26/01640/FUL 2 Jun 2026 Awaiting decision

Greensleeves 10 Horse Croft Lane Sheffield S35 0EB

Alterations to roof including raised ridge height, erection of 2 rear and 1 front dormer extensions with solar panels above, rooflights to front and r...

Full Planning Application Sheffield 2 Jun 2026
26/01602/PVPN 29 May 2026 Decided

3 Storth Hollow Croft Sheffield S10 3HW

Installation of solar panels to roof of dwellinghouse

Solar/PV panel Prior Notification Sheffield 29 May 2026
26/01610/PVPN 29 May 2026 Awaiting decision

Charnock Hall Primary School Carter Hall Road Sheffield S12 3HS

Installation of roof mounted solar panels

Solar/PV panel Prior Notification Sheffield 29 May 2026
26/01577/FUL 28 May 2026 Awaiting decision

1 Ingleborough Croft Sheffield S35 2ZX

Installation of air source heat pump to dwellinghouse

Full Planning Application Sheffield 28 May 2026
26/01465/LBC 18 May 2026 Awaiting decision

South Road Spiritualist Church South Road Walkley Sheffield S6 3TA

Alterations to Grade II listed building, including widening of existing access onto Fir Street, partial removal and alteration of existing boundary wa...

Listed Building Consent Application Sheffield 18 May 2026
26/01464/FUL 18 May 2026 Awaiting decision

South Road Spiritualist Church South Road Walkley Sheffield S6 3TA

Formation of parking area within the curtilage of the Grade II listed building, including widening of existing access onto Fir Street, partial removal...

Full Planning Application Sheffield 18 May 2026
26/01314/FUL 5 May 2026 Awaiting decision

Ewden Barn Bank Lane Sheffield S36 3SS

Installation of flush-fit integrated solar panels to the roof of the building

Full Planning Application Sheffield 5 May 2026
26/01241/FUL 28 Apr 2026 Refused

200 Eyre Street Sheffield S1 4QZ

External alterations to building comprising replacement roof including installation of solar panels, removal and replacement of existing cladding and ...

Full Planning Application Sheffield 28 Apr 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Sheffield

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Sheffield?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Sheffield. You can also narrow the alert to a postcode, street, or drawn area.

We check Sheffield's planning portal daily. New solar & renewables applications appear here within a day of being published.