Solar and renewables in Hambleton

Hambleton received 31 renewable energy applications in the last 12 months, including 4 battery storage sites and 7 heat pumps. Of the 25 decided so far, 23 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Hambleton

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 4 of 4 applications
2 Nov 2026 Registered 26/04844/FUL

Preston Cottage East Cowton Village East Cowton North Yorkshire DL7 0BD

Alteration to roofline to remove flat roof and install sloping pitched roof from existing ridge to eves at the back of the property. Installation of a...

Full permission Hambleton
15 Sept 2026 Registered 26/05845/FUL

Low Bohemia Farm Bull Lane Wigginton North Yorkshire YO32 2RG

Construction of a manure storage shed with solar panel array and rainwater harvesting tank on an existing agricultural unit

Full permission Hambleton
1 Sept 2026 Approved 22 Oct 26/04048/FUL

Badgerdub Cottage The Nookin Husthwaite North Yorkshire YO61 4PY

Retrospective application for the replacement of 2no front upper elevation windows with timber, replace front elevation lower windows with timber, exi...

Full permission Hambleton
26 Aug 2026 Registered 26/05309/FUL

Newton On Ouse Parish Hall Moor Lane Newton On Ouse North Yorkshire YO30 2BY

Repair and refurbishment of Grade II listed Parish Hall, insulation of the hall roof; erection of two single-storey extensions to the west and to the ...

Full permission Hambleton
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Hambleton

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Hambleton?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Hambleton. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Hambleton's planning portal daily. New solar & renewables applications appear here within a day of being published.