Solar and renewables in Test Valley

Test Valley received 36 renewable energy applications in the last 12 months, including 7 battery storage sites and 8 heat pumps. Of the 14 decided so far, 13 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

16
|
5
|
1
Get alerts for Test Valley

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 16 of 16 applications
26/01078/LBWN 13 Aug 2026 Current

Kings Farm House Station Road Over Wallop Stockbridge Hampshire SO20 8HZ

Replacement windows to dwelling, and installation of solar panels on barn

LISTED BUILDING WORKS - NORTH Test Valley 13 Aug 2026
26/01263/FULLS 7 Aug 2026 Current

Chilworth Hall Chilworth Road Chilworth Southampton Hampshire SO16 7JZ

Installation of a Tesla Powerwall 2 lithium battery on the external wall

FULL APPLICATION - SOUTH Test Valley 7 Aug 2026
26/01515/FULLS 6 Aug 2026 Current

Sopps Farm The Coach Road East Tytherley Salisbury Hampshire SP5 1LE

Installation of ground mounted solar photovoltaic array and erection of battery storage shed

FULL APPLICATION - SOUTH Test Valley 6 Aug 2026
26/01612/FULLN 6 Aug 2026 Current

Roof Top Photovoltaic Installation Andover College Charlton Road Andover Hampshire

Replacement roof covering, replacement roof mounted PV panels, and alterations to glazing

FULL APPLICATION - NORTH Test Valley 6 Aug 2026
26/01589/CLPS 30 Jul 2026 Current

14 Sir Lancelot Close Chandler's Ford Eastleigh Hampshire SO53 4HJ

Application for lawful development certificate for proposed installation of PV Solar Panels to North, South, East & West roof elevations, installation...

Test Valley 30 Jul 2026
26/01527/FULLS 23 Jul 2026 Current

Hollybrook Winchester Road Kings Somborne Stockbridge Hampshire SO20 6NZ

Install 12 solar panels on the East and West facing slopes of main roof and battery storage

FULL APPLICATION - SOUTH Test Valley 23 Jul 2026
26/01573/FULLN 22 Jul 2026 Current

The Mill House Mill Lane Wherwell Andover Hampshire SP11 7JH

Re-building/re-instatement of Mill House and former Mill Building following fire and install solar panels on roof

FULL APPLICATION - NORTH Test Valley 22 Jul 2026
26/01574/LBWN 22 Jul 2026 Current

The Mill House Mill Lane Wherwell Andover Hampshire SP11 7JH

Re-building/re-instatement of Mill House and former Mill Building following fire and install solar panels on roof

LISTED BUILDING WORKS - NORTH Test Valley 22 Jul 2026
26/01459/FULLS 17 Jul 2026 Current

Memorial Hall Butts Green Lockerley Romsey Hampshire SO51 0JG

Installation of a ground mounted Battery Energy Storage System comprising two battery modules, a wall mounted hybrid inverter and associated electrica...

FULL APPLICATION - SOUTH Test Valley 17 Jul 2026
26/01461/CLPS 15 Jul 2026 Decided

Bartletts Almshouses The Meads Romsey Hampshire SO51 8HB

Application for lawful development certificate for proposed installation of roof mounted photovoltaic solar panels

LAWFULNESS OF PROPOSED DEV - SOUTH Test Valley 15 Jul 2026
26/01441/FULLS 14 Jul 2026 Current

Land At Grove Place Upton Lane Nursling Hampshire

Erect two buildings for use as extra care accommodation for older people (Class C2), installation of air source heat pump and erection of plant buildi...

FULL APPLICATION - SOUTH Test Valley 14 Jul 2026
26/01255/FULLN 9 Jul 2026 Current

83 Bere Hill Crescent Andover Hampshire SP10 2AN

Installation of air to water pump to replace gas boiler

FULL APPLICATION - NORTH Test Valley 9 Jul 2026
26/01390/FULLS 30 Jun 2026 Approved

Chericot Doctors Hill Sherfield English Romsey Hampshire SO51 6JX

Provision of photovoltaic panels on roof and erection of detached garage/store

FULL APPLICATION - SOUTH Test Valley 30 Jun 2026
26/01223/FULLS 9 Jun 2026 Current

3 Waterworks Cottages New Road Timsbury Romsey Hampshire SO51 0NL

Two storey and single storey rear extensions with carport/garage installation of solar panels, creation of porch canopy and alterations to fenestratio...

FULL APPLICATION - SOUTH Test Valley 9 Jun 2026
26/01077/FULLN 5 Jun 2026 Current

Kings Farm House Station Road Over Wallop Stockbridge Hampshire SO20 8HZ

Installation of solar panels on barn, installation of gate and erection of shed

FULL APPLICATION - NORTH Test Valley 5 Jun 2026
26/01119/REJS 27 May 2026 Approved

Holiday Inn Redbridge Lane Nursling Southampton Hampshire SO16 0YP

Application to determine if prior approval is required for a proposed installation of photovoltaic (PV) solar panels to the roof of a non-domestic bui...

RENEWABLE ENERGY CLASS J - SOUTH Test Valley 27 May 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Test Valley

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Test Valley?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Test Valley. You can also narrow the alert to a postcode, street, or drawn area.

We check Test Valley's planning portal daily. New solar & renewables applications appear here within a day of being published.