Solar and renewables in New Forest (District)

New Forest (District) received 31 renewable energy applications in the last 12 months, including 1 solar farm and 1 heat pump. Of the 23 decided so far, 21 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
12 Nov 2026 Registered 26/11034

East Hayes, Grove Road, Lymington SO41 3RN

Removal and replacement of existing solar collector (Prior Approval Application)

Prior Approval install/replace Solar PV New Forest District
10 Nov 2026 Registered 26/10677

St Marys Church, Church Street, Fordingbridge SP6 1BB

Installation of 22 solar panels on south flat roof

Full Planning Permission New Forest District
5 Nov 2026 Registered 26/11038

Kusadasi, 12 Poplar Close, Bransgore BH23 8JF

New roof with solar panels and roof lights, patio with steps and fenestration alterations

Full Planning Permission New Forest District
4 Nov 2026 Registered 26/11011

Everton Nurseries, Christchurch Road, Everton, Hordle SO41 0BF

Refurbishment of existing garden centre to include replacement elevations, extension, replacement and enlargement of existing plant protection canopie...

Full Planning Permission New Forest District
8 Oct 2026 Registered 26/10917

Little Testwood Farm, Salisbury Road, Calmore, Totton SO40 2RW

Industrial unit with solar panels on roof and open storage on site (B2/B8 and E(g)(i)); demolition of farmhouse and outbuildings; construction of new ...

Full Planning Permission New Forest District
30 Sept 2026 Approved 17 Nov 26/10932

14 Grove Road, Barton-on-Sea, New Milton BH25 7DJ

Rear extension, raise garage roof and replacement solar panels

Full Planning Permission New Forest District
14 Sept 2026 Registered 26/10814

7 Upper Mullins Lane, Hythe SO45 5AG

5 car detached garage with solar panels following removal of existing sheds; rear 1.8m high boundary fence (amended description)

Full Planning Permission New Forest District
14 Sept 2026 Approved 2 Nov 26/10882

3 Kivernell Road, Milford-on-Sea SO41 0PP

1.5 storey rear extension, single storey extension to garage, rooflights and solar panels, upgrade existing cladding

Full Planning Permission New Forest District
14 Sept 2026 Approved 13 Nov 26/10870

New Forest Water Park, Ringwood Road, Fordingbridge SP6 2EY

x200 floating solar panels on the northern most lake

Full Planning Permission New Forest District
14 Sept 2026 Approved 3 Nov 26/10880

29 Belmore Road, Lymington SO41 3NU

Installation of 4 x ASHP / AC units

Full Planning Permission New Forest District
26 Aug 2026 Approved 20 Nov 26/10829

Sea Water Baths, Bath Road, Lymington SO41 3SE

x1 air exchange unit/heat source pump (Application for Listed Building Consent)

Listed Building Alteration New Forest District
26 Aug 2026 Approved 20 Nov 26/10828

Sea Water Baths, Bath Road, Lymington SO41 3SE

x1 air exchange unit/heat source pump

Full Planning Permission New Forest District
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in New Forest (District)

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in New Forest (District)?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by New Forest (District). You can also narrow the alert to a postcode, street, or drawn area.

We check New Forest (District)'s planning portal daily. New solar & renewables applications appear here within a day of being published.