Solar and renewables in New Forest (District)

New Forest (District) received 26 renewable energy applications in the last 12 months, including 1 solar farm and 1 heat pump. Of the 16 decided so far, 14 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

13
|
5
|
1

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 13 of 13 applications
30 Sept 2026 Registered 26/10932

14 Grove Road, Barton-on-Sea, New Milton BH25 7DJ

Rear extension, raise garage roof and replacement solar panels

Full Planning Permission New Forest District
14 Sept 2026 Registered 26/10814

7 Upper Mullins Lane, Hythe SO45 5AG

5 car detached garage with solar panels following removal of existing sheds

Full Planning Permission New Forest District
14 Sept 2026 Registered 26/10882

3 Kivernell Road, Milford-on-Sea SO41 0PP

1.5 storey rear extension, single storey extension to garage, rooflights and solar panels, upgrade existing cladding

Full Planning Permission New Forest District
14 Sept 2026 Registered 26/10870

New Forest Water Park, Ringwood Road, Fordingbridge SP6 2EY

x200 floating solar panels on the northern most lake

Full Planning Permission New Forest District
14 Sept 2026 Registered 26/10880

29 Belmore Road, Lymington SO41 3NU

Installation of 4 x ASHP / AC units

Full Planning Permission New Forest District
26 Aug 2026 Registered 26/10829

Sea Water Baths, Bath Road, Lymington SO41 3SE

x1 air exchange unit/heat source pump (Application for Listed Building Consent)

Listed Building Alteration New Forest District
26 Aug 2026 Registered 26/10828

Sea Water Baths, Bath Road, Lymington SO41 3SE

x1 air exchange unit/heat source pump

Full Planning Permission New Forest District
6 Aug 2026 Approved 28 Sep 26/10729

Richmond, Main Road, Sandleheath SP6 1TD

Roof alterations to include new pitched roofs with solar panels to front elevation; chimney adjustments; front porch; patio doors and riased terrace t...

Full Planning Permission New Forest District
28 Jul 2026 Registered 26/10665

12a Shamrock Way, Hythe Marina Village, Hythe SO45 6DY

Installation of x2no heat pumps with timber screening and x4no ventilation grills to the side elevation

Full Planning Permission New Forest District
28 Jul 2026 Approved 16 Sep 26/10693

18-20 High Street, Fordingbridge SP6 1AX

Solar panels to roof (Prior approval application)

Prior Approval install/replace Solar PV New Forest District
27 Jul 2026 Approved 17 Sep 26/10608

Brook Cottage, 7 Butlers Lane, Poulner, Ringwood BH24 1UB

EV charging point, 6 solar panels to outbuilding roof

Full Planning Permission New Forest District
27 Jul 2026 Approved 17 Sep 26/10703

Brook Cottage, 7 Butlers Lane, Poulner, Ringwood BH24 1UB

EV charging point, 6 solar panels to outbuilding roof (Application for Listed Building Consent)

Listed Building Alteration New Forest District
15 Jul 2026 Awaiting decision 26/10578

73-75 Long Lane, Holbury, Fawley SO45 2ND

Demolition of single-storey extension and construction of x1no self-build dwelling with solar panels on roof and with access onto Waltons Avenue

Full Planning Permission New Forest District
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in New Forest (District)

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in New Forest (District)?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by New Forest (District). You can also narrow the alert to a postcode, street, or drawn area.

We check New Forest (District)'s planning portal daily. New solar & renewables applications appear here within a day of being published.