Solar and renewables in New Forest (Park)

New Forest (Park) received 25 renewable energy applications in the last 12 months, including 6 heat pumps. All 17 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

12
|
5
|
3

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
Yesterday Site Visit 26/00909FULL

The Orchard, Warnes Lanes, Burley, Ringwood BH24 4EQ

Install 40 AIKO 480W ground mounted solar panels

Full Application New Forest Park
28 Sept 2026 Allocation 26/01045LDCP

Exley, Highwood Lane, Highwood, Ringwood BH24 3LE

Application for a Certificate of Lawful Development for proposed air source heat

Lawful Development Certificate Proposed New Forest Park
23 Sept 2026 Site Visit 26/00529FULL

Brock Cottage, Furzey Lane, Beaulieu, Brockenhurst SO42 7WB

Single storey extension; 2no. rooflights; alterations to annexe; greenhouse; alterations to fenestration; air source heat pump (demolition of conserva...

Full Application New Forest Park
17 Sept 2026 Site Visit 26/00809LBC

Upper Barford Farm, PENN COMMON ROAD, BRAMSHAW, LYNDHURST, SO43 7JN

Roof-mounted photovoltaic panels to outbuilding (Application for Listed Building Consent)

Listed Building Consent New Forest Park
17 Sept 2026 Site Visit 26/00808FULL

Upper Barford Farm, Penn Common Road, Bramshaw, Lyndhurst SO43 7JN

Roof-mounted photovoltaic panels to outbuilding (carport)

Full Application New Forest Park
21 Aug 2026 Pending Decision 26/00857FULL

The Old Armfield Ironworks, Stuckton Hill, Stuckton, Fordingbridge SP6 2HG

Change of use to mixed use E(g(iii) and F1 (trade and crafts teaching and workshop space); single storey teaching workshop; Air Source Heat Pump; alte...

Full Application New Forest Park
10 Aug 2026 Approved 25 Sep 26/00786FULL

Hatchett End, HATCHET GREEN, HALE, FORDINGBRIDGE, SP6 2ND

Erection of single-storey dwelling; erection of an ancillary outbuilding with open carport; associated landscaping; drainage; renewable energy measure...

Full Application New Forest Park
3 Aug 2026 Approved 24 Sep 26/00804FULL

Suncrest, CANADA COMMON ROAD, WEST WELLOW, ROMSEY, SO51 6DH

Attached single-storey car port; rear outbuilding; roof-mounted photovoltaic panels

Full Application New Forest Park
23 Jul 2026 Pending Decision 26/00624FULL

Tyrells Way, Tyrells Lane, Burley, Ringwood BH24 4DA

2no. single storey extensions; replacement porch; 1no. outbuilding with solar panels; alteration to roof; flue; alterations to doors and windows; rais...

Full Application New Forest Park
22 Jul 2026 Approved 9 Sep 26/00744FULL

Gablemead, Manchester Road, Sway, Lymington SO41 6AS

Replacement of an outbuilding for ancillary use and solar panels

Full Application New Forest Park
17 Jul 2026 Approved 4 Sep 26/00677FULL

The Wrens Nest, Road from Hyde towards Ogdens, Hyde, Fordingbridge SP6 2QE

Air-source heat pump

Full Application New Forest Park
9 Jul 2026 Pending Decision 26/00599FULL

Eclipse, Gilbury Lane, Exbury, Southampton SO45 1AG

Installation of a ground mounted solar array

Major - Non EIA New Forest Park
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in New Forest (Park)

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in New Forest (Park)?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by New Forest (Park). You can also narrow the alert to a postcode, street, or drawn area.

We check New Forest (Park)'s planning portal daily. New solar & renewables applications appear here within a day of being published.