Solar and renewables in New Forest (Park)

New Forest (Park) received 29 renewable energy applications in the last 12 months, including 9 heat pumps. Of the 21 decided so far, 20 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 9 of 9 applications
15 Oct 2026 Pending Decision 26/00933LBC

Ringwood Lodge, Ringwood Road, Bransgore, Christchurch BH23 8EL

2no. porches; outbuilding replacement roof tiles; air-source heat pump; drainage channel; external re-painting; internal alterations (Application for ...

Listed Building Consent New Forest Park
13 Oct 2026 Site Visit 26/01089FULL

Yew Tree, Lyndhurst Road, Minstead, Lyndhurst SO43 7FX

Solar panels to existing garage; new outbuilding

Full Application New Forest Park
12 Oct 2026 Pending Decision 26/00932FULL

Ringwood Lodge, Ringwood Road, Bransgore, Christchurch BH23 8EL

2no. porches; outbuilding replacement roof tiles; air-source heat pump; drainage channel; external re-painting

Full Application New Forest Park
8 Oct 2026 Site Visit 26/01051FULL

Sunnyside, Winsor Lane, Winsor, Southampton SO40 2HG

Extension; rooflights; porch to house; extension to garage with solar panels

Full Application New Forest Park
5 Oct 2026 Pending Decision 26/01045LDCP

Exley, Highwood Lane, Highwood, Ringwood BH24 3LE

Application for a Certificate of Lawful Development for proposed air source heat pump and solar panels to the roof of an outbuilding

Lawful Development Certificate Proposed New Forest Park
2 Oct 2026 Approved 16 Nov 26/00909FULL

The Orchard, Warnes Lanes, Burley, Ringwood BH24 4EQ

Install 40 AIKO 480W ground mounted solar panels

Full Application New Forest Park
23 Sept 2026 Pending Decision 26/00529FULL

Brock Cottage, Furzey Lane, Beaulieu, Brockenhurst SO42 7WB

Single storey extension; 2no. rooflights; alterations to annexe; greenhouse; alterations to fenestration; air source heat pump (demolition of conserva...

Full Application New Forest Park
17 Sept 2026 Withdrawn 5 Nov 26/00809LBC

Upper Barford Farm, PENN COMMON ROAD, BRAMSHAW, LYNDHURST, SO43 7JN

Roof-mounted photovoltaic panels to outbuilding (Application for Listed Building

Listed Building Consent New Forest Park
17 Sept 2026 Approved 5 Nov 26/00808FULL

Upper Barford Farm, Penn Common Road, Bramshaw, Lyndhurst SO43 7JN

Roof-mounted photovoltaic panels to outbuilding (carport)

Full Application New Forest Park
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in New Forest (Park)

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in New Forest (Park)?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by New Forest (Park). You can also narrow the alert to a postcode, street, or drawn area.

We check New Forest (Park)'s planning portal daily. New solar & renewables applications appear here within a day of being published.