Solar and renewables in Reigate

Reigate received 44 renewable energy applications in the last 12 months, including 2 solar farms, 2 battery storage sites and 7 heat pumps. Of the 26 decided so far, 24 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Reigate

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
10 Nov 2026 Registered 26/01846/PAP14J

59 - 61 Brighton Road Horley Surrey RH6 7HJ

Solar panels

Prior Approval - Solar (Non Domestic) Reigate
3 Nov 2026 Registered 26/01765/CLP

Mintfields 1B Mint Road Banstead Surrey SM7 3DT

Installation of solar panels.

Certificate of Lawfulness (Proposed Use) Reigate
30 Oct 2026 Registered 26/01789/HHOLD

Oakwood 8 Hillfield Road Redhill Surrey RH1 4AP

New dropped kerb; new first-floor side extension over existing ground floor; new single-storey side and rear extension and new single-storey side exte...

Householder Application Reigate
29 Oct 2026 Registered 26/01782/S73

27 Cronks Hill Road Redhill Surrey RH1 6LY

Part demolition of garage. Erection of part first floor part two storey side / rear extension. Erection of new replacement porch. Installation of PV p...

Section 73 Application Reigate
22 Oct 2026 Registered 26/01611/F

Merstham Village Hall Station Road North Merstham Surrey RH1 3ED

Installation of two air-to-air heatpumps.

Full planning Reigate
21 Oct 2026 Registered 26/01656/CLP

52 Brooklands Way Redhill Surrey RH1 2BW

Installation of two air source heat pump / air conditioning units.

Certificate of Lawfulness (Proposed Use) Reigate
7 Oct 2026 Registered 26/01561/F

Carrington School Noke Drive Redhill Surrey RH1 4AD

The installation of Air Source Heat Pump.

Full planning Reigate
22 Sept 2026 Withdrawn 7 Oct 26/01544/S73

Land Parcel At 525627 145487 Reigate Road Sidlow Surrey

The proposed development comprises the installation and operation of a ground-mounted solar farm and energy storage system. The solar farm will broadl...

Section 73 Application Reigate
3 Sept 2026 Approved 27 Oct 26/01154/F

St Wilfrids Church Hall Horley Row Horley Surrey RH6 8DF

Replace all existing roofing material on church and hall with up to date material, existing guttering to be sheeted over and new gutter system is to b...

Full planning Reigate
26 Aug 2026 Approved 21 Oct 26/01346/CLP

Tattenham Corner Public House Tattenham Crescent Epsom Downs Surrey KT18 5NY

Install 57 new solar panels to the internal facing pitched roofs and two small south facing pitched roofs.

Certificate of Lawfulness (Proposed Use) Reigate
25 Aug 2026 Approved 20 Oct 26/01376/HHOLD

The White Lodge Sturts Lane Walton On The Hill Surrey KT20 7RQ

Erection of a rear and side extension, replacement roof, installation of PV panels, changes to fenestration and internal alterations.

Householder Application Reigate
25 Aug 2026 Approved 20 Oct 26/01387/CLP

1 Fir Tree Close Epsom Downs Surrey KT17 3LD

Replacement of existing roof covering with 28 integrated solar panels and new roof tiles to match existing, including required tile and soffit vents. ...

Certificate of Lawfulness (Proposed Use) Reigate
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Reigate

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Reigate?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Reigate. You can also narrow the alert to a postcode, street, or drawn area.

We check Reigate's planning portal daily. New solar & renewables applications appear here within a day of being published.