Solar and renewables in Sutton

Sutton received 27 renewable energy applications in the last 12 months, including 9 heat pumps. Of the 12 decided so far, 8 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Sutton

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
20 Oct 2026 Pending Consideration DM2026/01152

1A Rochester Road Carshalton SM5 2LB

Provision of solar panels to roof.

Householder Application Sutton
14 Oct 2026 Pending Consideration DM2026/01150

4 Highfield Road Sutton SM1 4JX

Demolition of the single storey front/flank garage and shed and single storey rear/flank extension, erection of a detached two storey dwelling with ac...

Full Application Sutton
5 Oct 2026 Pending Consideration DM2026/01144

101 London Road Wallington SM6 7DB

Installation of two air source heat pumps.

Householder Application Sutton
23 Sept 2026 Pending Consideration DM2026/00982

31 Rosehill Gardens Sutton SM1 3JZ

Erection of a part one, part two storey front, side and rear extension to provide annexed accommodation, erection of an outbuilding and installation o...

Householder Application Sutton
23 Sept 2026 Pending Consideration DM2026/01110

34 Montagu Gardens Wallington SM6 8ER

Conversion of loft space involving alterations to existing roofline, a dormer extension at rear, a window to flank roofslope. Provision of solar panel...

Certificate of Proposed Use Sutton
22 Sept 2026 Pending Consideration DM2026/00981

19 Ashcombe Road Carshalton SM5 3ET

Demolition of an existing single storey rear extension and erection of a single storey rear extension, installation of solar panels to the rear extens...

Householder Application Sutton
16 Sept 2026 Pending Consideration DM2026/01023

Arc Apartments 98-100 Manor Road Wallington SM6 0ED

Erection of an additional storey to provide 1 self contained residential unit and installation of solar panels.

Full Application Sutton
14 Sept 2026 Pending Consideration DM2026/01076

The Barn Festival Walk Carshalton SM5 3NY

Provision of ramped access to all external ground floor doors, hardstanding driveway area between the dwelling and garage and garage area site boundar...

Certificate of Proposed Use Sutton
8 Sept 2026 Pending Consideration PRE2026/00123

1 The Leeways Park Road, Cheam SM3 8QA

Prior approval application for the installation of a roof mounted solar PV system.

Pre-App Householder Sutton
8 Sept 2026 Pending Consideration DM2026/01046

19 Landseer Road Sutton SM1 2DE

Prior approval application for the installation of a roof mounted solar PV system.

PA Solar Equipment Domestic Sutton
20 Aug 2026 Refused 15 Oct DM2026/00828

33 Beeches Avenue Carshalton SM5 3LJ

Installation of an air source heat pump.

Certificate of Proposed Use Sutton
17 Aug 2026 Pending Consideration DM2026/00922

759 London Road Cheam SM3 9DX

Demolition of existing detached garage and erection of a single storey building to rear, mixed use (office, retail and storage), provision of solar pa...

Full Application Sutton
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Sutton

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Sutton?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Sutton. You can also narrow the alert to a postcode, street, or drawn area.

We check Sutton's planning portal daily. New solar & renewables applications appear here within a day of being published.